TxDOT contract A00194183 bid tabulation
Bridge Replacement, AVE H (At Cottonwood Creek to STR# B005-20-002). Let by Texas DOT on February 6, 2025, Matagorda, Yoakum District. 9 bids received; low bid $3,170,844 by Scout 5 Construction LLC, -16% against the engineer's estimate of $3,775,699.
- Owner
- Texas DOT
- Letting
- 06 FEB 2025
- Pay items
- 71
- Data through
- 19 NOV 2026
Bidders
| Rank | Bidder | Total bid | Against the low bid | Against the estimate |
|---|---|---|---|---|
| 1 | Scout 5 Construction LLC | $3,170,844 | Low | -16% |
| 2 | John Reed and Company, LLC | $3,496,934 | +10% | -7.0% |
| 3 | Trevway, Inc. | $3,508,813 | +11% | -7.0% |
| 4 | STX Civil | $3,652,466 | +15% | -3.0% |
| 5 | E-Z Bel Construction, LLC | $3,732,051 | +18% | -1.0% |
| 6 | C. E. Barker, LTD. | $3,762,209 | +19% | 0.0% |
| 7 | R Construction Civil, LLC | $4,230,872 | +33% | +12% |
| 8 | Talbert Companies LLC | $4,422,582 | +39% | +17% |
| 9 | CK Newberry, LLC | $5,878,554 | +85% | +56% |
Engineer's estimate: $3,775,699.
Bid tabulation
| Line | Pay item | Unit | Quantity | Estimate | 1. Scout 5 Construction LLC | 2. John Reed and Company, LLC | 3. Trevway, Inc. | 4. STX Civil | 5. E-Z Bel Construction, LLC | 6. C. E. Barker, LTD. |
|---|---|---|---|---|---|---|---|---|---|---|
| 1 | Preparing row (100-7002) | STA | 10.40 | $5,000.00 | $0.01 | $15,000 | $1,828.19 | $8,500.00 | $5,200.00 | $39,500 |
| 2 | Removing concrete (pavement) (104-7001) | SY | 1,384 | $40.00 | $24.81 | $10.00 | $20.00 | $55.00 | $10.00 | $14.61 |
| 3 | Removing concrete (driveways) (104-7011) | SY | 67 | $25.00 | $28.19 | $12.00 | $66.30 | $40.00 | $50.00 | $18.01 |
| 4 | Removing concrete (sidewalk, ramp or shared use path) (104-7013) | SY | 39 | $35.00 | $36.83 | $10.00 | $10.00 | $25.00 | $15.00 | $26.84 |
| 5 | Excavation (roadway) (110-7001) | CY | 536 | $22.00 | $34.54 | $30.00 | $23.68 | $17.00 | $35.00 | $19.19 |
| 6 | Excavation (channel) (110-7002) | CY | 1,420 | $30.00 | $51.76 | $40.00 | $19.00 | $17.00 | $38.00 | $37.37 |
| 7 | Embankment (final)(OC)(type C) (132-7005) | CY | 769 | $60.00 | $63.98 | $20.00 | $33.00 | $30.00 | $28.00 | $19.19 |
| 8 | Blading (150-7002) | HR | 48 | $120.00 | $0.01 | $30.00 | $75.00 | $165.00 | $60.00 | $66.04 |
| 9 | Block sodding (162-7002) | SY | 1,254 | $7.50 | $10.46 | $5.00 | $6.00 | $8.00 | $7.00 | $6.57 |
| 10 | Broadcast seed (permanent_rural_clay) (164-7002) | SY | 2,227 | $0.01 | $0.50 | $1.26 | $3.25 | $1.00 | $0.61 | |
| 11 | Broadcast seed (temporary_warm) (164-7005) | SY | 872 | $1.00 | $0.01 | $0.50 | $1.26 | $2.25 | $0.25 | $0.25 |
| 12 | Broadcast seed (temporary_cool) (164-7006) | SY | 872 | $1.00 | $0.01 | $0.50 | $1.26 | $1.50 | $0.25 | $0.25 |
| 13 | Vegetative watering (168-7001) | TGL | 44.10 | $90.00 | $0.01 | $40.00 | $200.00 | $150.00 | $90.00 | $47.98 |
| 14 | FL BS (compacted in place)(type E GR 5) (6") (247-7063) | SY | 104 | $100.00 | $80.00 | $116.00 | $240.00 | $35.00 | $160.08 | |
| 15 | FL BS (compacted in place)(type E GR 5)(final pos) (247-7196) | CY | 279 | $105.00 | $230.00 | $292.00 | $105.00 | $130.00 | $176.35 | |
| 16 | Lime (com or QK)(slurry) or QK(dry) (260-7001) | TON | 26 | $430.00 | $393.33 | $330.00 | $350.00 | $500.00 | $500.00 | $353.50 |
| 17 | Lime TRT (existing material)(8") (260-7007) | SY | 1,551 | $8.25 | $10.98 | $10.00 | $27.00 | $10.00 | $8.00 | $7.15 |
| 18 | Asphalt (RC-250) (316-7016) | GAL | 234 | $13.99 | $30.00 | $21.47 | $23.00 | $17.00 | $8.08 | |
| 19 | Aggregate (type-E, GR-5)(sac-B) (316-7194) | CY | 8.40 | $650.00 | $600.00 | $1,515.79 | $1,500.00 | $1,186.00 | $1,010.00 | |
| 20 | Aggregate (type-PE, GR-4)(sac-B) (316-7232) | CY | 9.10 | $500.00 | $600.00 | $1,538.53 | $1,300.00 | $1,218.00 | $1,010.00 | |
| 21 | Asphalt (AC 20-5TR or AC-20XP or CRS-2P) (316-7264) | GAL | 398 | $50.00 | $25.00 | $17.68 | $17.00 | $14.00 | $10.86 | |
| 22 | D-GR HMA type-B PG64-22 (341-7001) | TON | 344 | $170.00 | $250.00 | $240.00 | $328.00 | $130.00 | $150.00 | $232.30 |
| 23 | Concrete pavement (CPCD) (7") (360-7017) | SY | 1,403 | $180.00 | $100.00 | $115.00 | $75.00 | $150.00 | $90.00 | $93.23 |
| 24 | Cem stabil BKFL (400-7010) | CY | 121 | $270.00 | $241.14 | $130.00 | $229.61 | $235.00 | $255.00 | $118.68 |
| 25 | Drilled shaft (24 in) (416-7004) | LF | 2,132 | $265.00 | $240.00 | $280.00 | $266.00 | $250.00 | $210.00 | $281.63 |
| 26 | Class C concrete (abutment) (420-7012) | CY | 88.10 | $1,700.00 | $1,350.00 | $1,600.00 | $700.00 | $1,300.00 | $1,750.00 | $1,828.06 |
| 27 | Class C concrete (cap) (420-7022) | CY | 37.20 | $1,800.00 | $250.00 | $1,600.00 | $1,127.00 | $1,710.00 | $1,850.00 | $1,865.38 |
| 28 | Class C concrete (column) (420-7038) | CY | 17.80 | $2,000.00 | $250.00 | $1,600.00 | $1,594.00 | $2,500.00 | $1,850.00 | $1,879.91 |
| 29 | Reinforced concrete slab (slab beam) (422-7007) | SF | 10,273 | $30.00 | $28.02 | $25.00 | $22.00 | $26.00 | $25.00 | $26.36 |
| 30 | Bridge sidewalk (422-7012) | SF | 2,997 | $25.00 | $47.90 | $20.00 | $16.00 | $45.00 | $12.00 | $12.53 |
| 31 | Prestressed concrete slab beam (5SB15) (425-7019) | LF | 1,969.06 | $250.00 | $240.00 | $270.00 | $263.00 | $250.00 | $350.00 | $220.64 |
| 32 | Riprap (stone protection)(18 in) (432-7043) | CY | 1,895 | $210.00 | $300.00 | $100.00 | $225.00 | $240.00 | $250.00 | $154.67 |
| 33 | STR steel (miscellaneous non-bridge) (442-7007) | LB | 896 | $27.50 | $50.00 | $25.00 | $26.00 | $22.00 | $30.00 | $21.84 |
| 34 | Rail (type T223) (450-7008) | LF | 264 | $50.00 | $130.00 | $120.00 | $170.00 | $193.00 | $145.44 | |
| 35 | Rail (type C223) (450-7034) | LF | 358 | $260.00 | $50.00 | $160.00 | $179.00 | $195.00 | $342.00 | $221.58 |
| 36 | Armor joint (sealed) (454-7003) | LF | 146 | $150.00 | $250.00 | $90.00 | $180.00 | $215.00 | $208.00 | $119.52 |
| 37 | RC pipe (CL III)(18 in) (464-7003) | LF | 103 | $165.00 | $107.92 | $110.00 | $80.73 | $110.00 | $140.00 | $158.57 |
| 38 | RC pipe (CL III)(42 in) (464-7010) | LF | 156 | $190.00 | $250.00 | $299.00 | $250.00 | $220.00 | $315.79 | |
| 39 | Manh (complete)(PRM)(48IN) (465-7002) | EACH | 1 | $8,500.00 | $12,000 | $6,000.00 | $11,300 | $7,600.00 | $15,500 | $4,292.50 |
| 40 | Set (type II) (18 in) (RCP) (6: 1) (C) (467-7307) | EACH | 2 | $2,500.00 | $10,000 | $3,000.00 | $5,032.00 | $3,200.00 | $3,700.00 | $3,633.98 |
| 41 | Set (type II) (42 in) (RCP) (3: 1) (C) (467-7377) | EACH | 2 | $10,000 | $6,000.00 | $11,917 | $7,500.00 | $12,000 | $8,145.65 | |
| 42 | Removing structure (bridge 0 - 99 FT length) (496-7009) | EACH | 3 | $35,000 | $1,000.00 | $50,000 | $70,000 | $27,000 | $70,333 | $50,165 |
| 43 | Removing structure (small) (496-7036) | EACH | 4 | $1,500.00 | $1,000.00 | $2,000.00 | $2,000.00 | $1,000.00 | $400.00 | $8,585.00 |
| 44 | Mobilization (500-7001) | LS | 1 | $340,000 | $100,000 | $330,000 | $350,000 | $286,138 | $300,000 | $360,000 |
| 45 | Barricades, signs and traffic handling (502-7001) | MO | 19 | $3,500.00 | $0.01 | $2,000.00 | $1,100.00 | $2,000.00 | $1,400.00 | $858.50 |
| 46 | Rock filter dams (install) (type 1) (506-7006) | CY | 18 | $320.00 | $26.00 | $50.00 | $200.00 | $25.00 | $200.00 | $202.00 |
| 47 | Rock filter dams (remove) (506-7012) | CY | 18 | $70.00 | $0.01 | $15.00 | $100.00 | $20.00 | $30.00 | $30.30 |
| 48 | Sandbags for erosion control (506-7035) | EACH | 90 | $25.00 | $19.00 | $10.00 | $10.00 | $18.00 | $18.00 | $18.18 |
| 49 | Temporary sediment control fence (install) (506-7039) | LF | 2,146 | $4.50 | $5.54 | $4.00 | $3.00 | $4.25 | $3.00 | $2.93 |
| 50 | Temporary sediment control fence (remove) (506-7041) | LF | 2,146 | $1.50 | $1.87 | $1.00 | $1.00 | $1.00 | $1.00 | $1.21 |
| 51 | Concrete curb (mono) (type II) (529-7007) | LF | 110 | $60.00 | $19.00 | $75.00 | $22.00 | $35.00 | $12.00 | $24.24 |
| 52 | Concrete curb (slotted) (529-7013) | LF | 705 | $30.00 | $35.00 | $75.00 | $35.00 | $70.00 | $70.00 | $40.00 |
| 53 | Driveways (concrete) (530-7006) | SY | 110 | $120.00 | $115.00 | $160.00 | $121.00 | $130.00 | $118.00 | $204.19 |
| 54 | Concrete sidewalks (5") (531-7002) | SY | 748 | $105.00 | $80.00 | $105.00 | $70.00 | $105.00 | $100.00 | $75.93 |
| 55 | Curb ramps (type 1) (531-7015) | SY | 24 | $220.00 | $150.00 | $800.00 | $120.00 | $90.00 | $275.00 | $146.72 |
| 56 | Metal W-beam guard fence (timber post) (540-7001) | LF | 50 | $31.00 | $40.00 | $121.00 | $45.00 | $35.00 | $39.88 | |
| 57 | Metal beam guard fence trans (TL2) (540-7006) | EACH | 3 | $2,100.00 | $1,433.00 | $2,670.00 | $1,700.00 | $1,675.00 | $1,447.33 | |
| 58 | Downstream anchor terminal section (540-7015) | EACH | 1 | $1,500.00 | $1,552.00 | $2,821.00 | $1,800.00 | $1,350.00 | $1,567.52 | |
| 59 | Guardrail end treatment (install) (544-7001) | EACH | 2 | $3,500.00 | $3,497.00 | $4,520.00 | $3,800.00 | $3,330.00 | $3,531.97 | |
| 60 | Crash cushion attenuator (install)(L)(N)(TL2) (545-7005) | EACH | 1 | $30,000 | $28,925 | $33,000 | $35,000 | $30,600 | $29,214 | |
| 61 | Wire fence (type A) (552-7001) | LF | 58 | $26.92 | $35.00 | $50.00 | $25.00 | $42.00 | $101.00 | |
| 62 | Gate (type 2) (552-7007) | EACH | 1 | $500.00 | $4,000.00 | $1,200.00 | $1,900.00 | $800.00 | $202.00 | |
| 63 | Install small roadside sign support and assembly tytwt(1)UA(T) (644-7054) | EACH | 1 | $1,400.00 | $713.00 | $928.42 | $850.00 | $735.00 | $720.13 | |
| 64 | Install small roadside sign support and assembly tytwt(1)WS(P) (644-7057) | EACH | 9 | $600.00 | $1,100.00 | $597.00 | $682.00 | $700.00 | $540.00 | $602.97 |
| 65 | Install delineator assembly (D-SW)SZ 1(WFLX)GND (658-7003) | EACH | 24 | $60.00 | $150.00 | $95.00 | $99.00 | $100.00 | $67.00 | $95.95 |
| 66 | Install delineator assembly (D-SW)SZ 1(BRF)CTB (BI) (658-7013) | EACH | 18 | $30.00 | $100.00 | $16.00 | $6.00 | $20.00 | $23.00 | $16.16 |
| 67 | Install delineator assembly (D-SW)SZ 1(BRF)GF2(BI) (658-7019) | EACH | 9 | $150.00 | $25.00 | $13.00 | $30.00 | $29.00 | $25.25 | |
| 68 | Install object marker assembly (OM-2Y)(WC)GND (658-7056) | EACH | 2 | $200.00 | $305.00 | $50.00 | $360.00 | $58.00 | $308.05 | |
| 69 | Install object marker assembly (OM-3L)(TWT)GND (658-7066) | EACH | 4 | $375.00 | $750.00 | $305.00 | $195.00 | $360.00 | $270.00 | $308.05 |
| 70 | Install object marker assembly (OM-3R)(TWT)GND (658-7070) | EACH | 4 | $375.00 | $750.00 | $305.00 | $195.00 | $360.00 | $238.00 | $308.05 |
| 71 | Remove delin & object marker assms (658-7078) | EACH | 8 | $25.00 | $50.00 | $25.00 | $200.00 | $30.00 | $18.00 | $25.25 |
The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.
Source
Read from TxDOT's tabulation for this contract. TxDOT Bid Tabulations open-data export (data.texas.gov) from September 2024, read 21 November 2026, and TxDOT's legacy Tabulation of Bids pages for January 2020 to August 2024. The legacy pages are a large sample, not every contract: their file names were reused from year to year. Their district is the one TxDOT gives the county. Bids that did not match their published total are left out.
Every contract let that day: TxDOT letting of February 6, 2025. Compiled by Mirage Metrics.