TxDOT contract A00067526 bid tabulation
Resurface Roadway, IH 35 (0.010 MI S OF SANCHEZ (SBML) to 0.28 MILES SOUTH OF SHILOH DRIVE). Let by Texas DOT on February 6, 2025, Webb, Laredo District. 4 bids received; low bid $10,599,420 by Anderson Columbia Co., Inc., -5.8% against the engineer's estimate of $11,256,118.
- Owner
- Texas DOT
- Letting
- 06 FEB 2025
- Pay items
- 58
- Data through
- 19 NOV 2026
Bidders
| Rank | Bidder | Total bid | Against the low bid | Against the estimate |
|---|---|---|---|---|
| 1 | Anderson Columbia Co., Inc. | $10,599,420 | Low | -6.0% |
| 2 | Texas Materials Group, Inc. | $11,203,169 | +6.0% | 0.0% |
| 3 | Hunter Industries, LTD. | $12,035,479 | +14% | +7.0% |
| 4 | CK Newberry, LLC | $12,096,657 | +14% | +7.0% |
Engineer's estimate: $11,256,118.
Bid tabulation
| Line | Pay item | Unit | Quantity | Estimate | 1. Anderson Columbia Co., Inc. | 2. Texas Materials Group, Inc. | 3. Hunter Industries, LTD. | 4. CK Newberry, LLC |
|---|---|---|---|---|---|---|---|---|
| 1 | Backfill (type B) (134-7002) | STA | 377.95 | $115.00 | $174.00 | $100.00 | $151.00 | $200.00 |
| 2 | Blading (150-7002) | HR | 24 | $180.00 | $188.00 | $170.00 | $156.00 | $175.00 |
| 3 | Fog seal (CSS-1H) (315-7004) | GAL | 44,550 | $4.00 | $0.50 | $0.21 | $2.92 | $1.00 |
| 4 | D-GR HMA type-C sac-A PG76-22 (341-7031) | TON | 12,924 | $125.00 | $171.00 | $136.40 | $155.00 | |
| 5 | Stone-MTRX-asphalt SMA-C sac-A PG76-22 (346-7001) | TON | 24,757 | $150.00 | $154.00 | $158.00 | $182.10 | $155.00 |
| 6 | Flexible pavement structure repair(5") (351-7004) | SY | 49,806 | $45.00 | $37.00 | $44.50 | $42.08 | $49.00 |
| 7 | Flexible pavement structure repair(8") (351-7007) | SY | 13,015 | $70.00 | $60.00 | $64.00 | $72.06 | $85.00 |
| 8 | Planing asphalt concrete pavement(2") (354-7051) | SY | 19,476 | $2.80 | $2.30 | $2.44 | $3.00 | |
| 9 | Planing asphalt concrete pavement(3") (354-7052) | SY | 122,748 | $3.50 | $3.80 | $4.00 | $3.54 | $3.50 |
| 10 | Planing asphalt concrete pavement (2.5") (354-7082) | SY | 32,779 | $2.70 | $2.25 | $3.54 | $3.00 | |
| 11 | Riprap (mow strip)(4 in) (432-7013) | CY | 102 | $550.00 | $740.00 | $675.00 | $728.99 | $800.00 |
| 12 | Cleaning and sealing existing joints (CL7) (438-7007) | LF | 1,016 | $30.00 | $50.00 | $45.00 | $60.00 | $65.00 |
| 13 | Mobilization (500-7001) | LS | 1 | $1,018,776 | $912,000 | $589,000 | $1,077,431 | $1,175,000 |
| 14 | Barricades, signs and traffic handling (502-7001) | MO | 6 | $8,500.00 | $4,000.00 | $1,800.00 | $4,578.31 | $15,000 |
| 15 | Portable changeable message sign (503-7002) | EACH | 2 | $15,000 | $8,500.00 | $7,000.00 | $9,742.50 | $15,000 |
| 16 | TMA (stationary) (505-7001) | DAY | 86 | $260.00 | $230.00 | $270.00 | $270.62 | $350.00 |
| 17 | TMA (mobile operation) (505-7002) | HR | 200 | $60.00 | $770.00 | $55.00 | $108.25 | $100.00 |
| 18 | One-way traffic control (flagger cont) (510-7001) | HR | 192 | $78.00 | $70.00 | $108.00 | $60.00 | |
| 19 | Mill rumble strips (asphalt) (shoulder) (533-7001) | LF | 72,880 | $0.25 | $0.12 | $0.21 | $0.21 | $0.10 |
| 20 | Mill rumble strips (asphalt) (centerline) (533-7002) | LF | 11,126 | $0.18 | $0.86 | $0.86 | $0.10 | |
| 21 | Metal W-beam guard fence (timber post) (540-7001) | LF | 1,825 | $32.00 | $30.00 | $28.50 | $28.00 | $23.00 |
| 22 | Metal W-beam guard fence (steel post) (540-7002) | LF | 250 | $120.00 | $100.00 | $110.00 | $28.00 | |
| 23 | Metal beam guard fence trans (thrie-beam) (540-7005) | EACH | 9 | $2,000.00 | $3,500.00 | $3,250.00 | $2,400.00 | $1,800.00 |
| 24 | Downstream anchor terminal section (540-7015) | EACH | 7 | $1,750.00 | $1,750.00 | $1,350.00 | $1,600.00 | $1,500.00 |
| 25 | Metal beam guard fence trans (non - sym) (540-7016) | EACH | 7 | $1,000.00 | $1,250.00 | $1,000.00 | $1,150.00 | $700.00 |
| 26 | Metal beam guard fence trans (anchor plate) (540-7029) | EACH | 14 | $800.00 | $1,400.00 | $600.00 | $1,250.00 | $1,100.00 |
| 27 | Remove metal beam guard fence (542-7001) | LF | 1,825 | $3.25 | $3.00 | $2.50 | $3.00 | $3.00 |
| 28 | Remove terminal anchor section (542-7002) | EACH | 7 | $200.00 | $325.00 | $200.00 | $300.00 | $225.00 |
| 29 | RM metal beam guard fence trans (thrie-beam) (542-7004) | EACH | 5 | $150.00 | $325.00 | $200.00 | $300.00 | $225.00 |
| 30 | Guardrail end treatment (install) (544-7001) | EACH | 16 | $3,200.00 | $3,800.00 | $3,000.00 | $3,500.00 | $3,200.00 |
| 31 | Guardrail end treatment (remove) (544-7003) | EACH | 15 | $260.00 | $325.00 | $200.00 | $300.00 | $225.00 |
| 32 | Electrical conductor (no.6) bare (620-7009) | LF | 60 | $2.30 | $3.00 | $7.50 | $7.50 | $2.50 |
| 33 | Electrical conductor (no.6) insulated (620-7010) | LF | 180 | $2.35 | $3.00 | $7.50 | $7.50 | $3.00 |
| 34 | Install delineator assembly (D-SW)SZ 1(BRF)GF2 (658-7018) | EACH | 60 | $30.00 | $27.00 | $50.00 | $25.00 | $25.00 |
| 35 | Remove delin & object marker assms (658-7078) | EACH | 41 | $18.00 | $11.00 | $50.00 | $10.00 | $50.00 |
| 36 | Work zone pavement marking SHT terminal (tab)type W (662-7112) | EACH | 8,018 | $2.00 | $2.20 | $1.75 | $1.63 | $1.00 |
| 37 | Work zone pavement marking SHT terminal (tab)type Y-2 (662-7114) | EACH | 1,762 | $2.20 | $1.75 | $1.63 | $1.00 | |
| 38 | Reflectorized pavement marking type I (W)8"(solid)(100MIL) (666-7024) | LF | 7,205 | $1.75 | $0.96 | $0.88 | $0.88 | $0.50 |
| 39 | Reflectorized pavement marking type I (W)12"(solid)(100MIL) (666-7030) | LF | 1,245 | $2.50 | $1.20 | $1.10 | $1.10 | $1.00 |
| 40 | Reflectorized pavement marking type I (W)24"(solid)(100MIL) (666-7036) | LF | 110 | $18.00 | $16.00 | $16.00 | $5.00 | |
| 41 | Reflectorized pavement marking type I (W)(arrow)(100MIL) (666-7042) | EACH | 4 | $200.00 | $165.00 | $150.00 | $150.00 | $200.00 |
| 42 | Reflectorized pavement marking type I (W)(word)(100MIL) (666-7066) | EACH | 9 | $200.00 | $275.00 | $250.00 | $250.00 | $200.00 |
| 43 | Reflectorized pavement marking type I (W)(RR crossing)(100MIL) (666-7081) | EACH | 2 | $550.00 | $500.00 | $500.00 | $500.00 | |
| 44 | Reflectorized pavement marking type I (Y)8"(solid)(100MIL) (666-7114) | LF | 360 | $1.20 | $1.10 | $1.10 | $5.00 | |
| 45 | Reflectorized pavement marking type I (Y)24"(solid)(100MIL) (666-7123) | LF | 156 | $18.00 | $16.00 | $16.00 | $10.00 | |
| 46 | Reflectorized pavement marking type I (W)6"(broken)(100MIL) (666-7408) | LF | 16,206 | $0.75 | $0.85 | $0.78 | $0.78 | $1.00 |
| 47 | Reflectorized pavement marking type I (W)6"(solid)(100MIL) (666-7411) | LF | 62,624 | $0.75 | $0.74 | $0.68 | $0.68 | $0.25 |
| 48 | Reflectorized pavement marking type I (Y)6"(solid)(100MIL) (666-7423) | LF | 46,432 | $0.75 | $0.74 | $0.68 | $0.68 | $0.20 |
| 49 | Reflectorized pavement marking type I (W)12"(DOT)(100MIL) (666-7424) | LF | 359 | $3.50 | $2.20 | $2.00 | $2.00 | $50.00 |
| 50 | Reflectorized pavement marker type I-C (672-7002) | EACH | 724 | $5.00 | $8.00 | $7.50 | $7.50 | $10.00 |
| 51 | Reflectorized pavement marker type II-A-A (672-7004) | EACH | 384 | $8.00 | $7.50 | $7.50 | $10.00 | |
| 52 | Reflectorized pavement marker type II-C-R (672-7006) | EACH | 392 | $6.00 | $8.00 | $7.50 | $7.50 | $10.00 |
| 53 | Permanent concrete traffic barrier repair(single slope) (777-7003) | LF | 6 | $2,500.00 | $2,800.00 | $2,000.00 | $3,244.95 | $1,000.00 |
| 54 | Bonding course (3007-7001) | GAL | 45,387 | $4.00 | $2.50 | $3.85 | $3.54 | $4.00 |
| 55 | Install DMS (foundation MTD cabinet) (6004-7002) | EACH | 1 | $23,000 | $18,000 | $31,000 | $31,000 | $16,000 |
| 56 | Installation of cellular modem (6015-7001) | EACH | 1 | $360.00 | $1,200.00 | $1,300.00 | $1,300.00 | $1,200.00 |
| 57 | TMSP radar speed control monitor (6025-7001) | EACH | 2 | $9,500.00 | $12,000 | $5,800.00 | $12,990 | $5,000.00 |
| 58 | Remove DMS (6054-7003) | EACH | 1 | $3,000.00 | $12,000 | $11,900 | $11,900 | $12,000 |
The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.
Source
Read from TxDOT's tabulation for this contract. TxDOT Bid Tabulations open-data export (data.texas.gov) from September 2024, read 21 November 2026, and TxDOT's legacy Tabulation of Bids pages for January 2020 to August 2024. The legacy pages are a large sample, not every contract: their file names were reused from year to year. Their district is the one TxDOT gives the county. Bids that did not match their published total are left out.
Every contract let that day: TxDOT letting of February 6, 2025. Compiled by Mirage Metrics.