TxDOT contract A00203670 bid tabulation
Bridge Maintenance, US 290 (EB at Cottonwood & Big Dry Creeks to .). Let by Texas DOT on February 6, 2025, Travis, Austin District. 13 bids received; low bid $304,980 by BK Field Operations LLC, -27% against the engineer's estimate of $418,141.
- Owner
- Texas DOT
- Letting
- 06 FEB 2025
- Pay items
- 16
- Data through
- 19 NOV 2026
Bidders
| Rank | Bidder | Total bid | Against the low bid | Against the estimate |
|---|---|---|---|---|
| 1 | BK Field Operations LLC | $304,980 | Low | -27% |
| 2 | Beck-Reit & Sons, LTD. | $306,528 | +1.0% | -27% |
| 3 | Icos Management, LLC | $351,332 | +15% | -16% |
| 4 | Taylor Contracting LLC | $361,030 | +18% | -14% |
| 5 | Roy Jorgensen Associates, Inc. | $363,710 | +19% | -13% |
| 6 | Premier Contractors LLC | $369,732 | +21% | -12% |
| 7 | Garret Shields Infrastructure | $382,920 | +26% | -8.0% |
| 8 | Restek, Inc. | $385,095 | +26% | -8.0% |
| 9 | MB Western Industrial Contracting Co. | $404,975 | +33% | -3.0% |
| 10 | Structural Integrity Group LLC | $411,850 | +35% | -2.0% |
| 11 | Macias Specialty Contracting LLC | $412,163 | +35% | -1.0% |
| 12 | Dan Williams Company | $460,628 | +51% | +10% |
| 13 | Built Right Construction of Oklahoma, LLC | $511,470 | +68% | +22% |
Engineer's estimate: $418,141.
Bid tabulation
| Line | Pay item | Unit | Quantity | Estimate | 1. BK Field Operations LLC | 2. Beck-Reit & Sons, LTD. | 3. Icos Management, LLC | 4. Taylor Contracting LLC | 5. Roy Jorgensen Associates, Inc. | 6. Premier Contractors LLC |
|---|---|---|---|---|---|---|---|---|---|---|
| 1 | Removing concrete (pile encasement) (104-7033) | CY | 20 | $1,500.00 | $800.00 | $300.00 | $1,100.00 | $750.00 | $200.00 | $250.00 |
| 2 | Flowable backfill (401-7001) | CY | 15 | $400.00 | $400.00 | $500.00 | $660.00 | $1,000.00 | $350.00 | $350.00 |
| 3 | Class C concrete(pile encasement) (420-7059) | LF | 65 | $750.00 | $1,450.00 | $911.00 | $1,320.00 | $1,200.00 | $1,300.00 | $750.00 |
| 4 | Penetrating concrete surface treatment (428-7001) | SY | 2,750 | $18.50 | $15.00 | $9.00 | $17.00 | $10.00 | $11.80 | $45.00 |
| 5 | Concrete structure repair (vertical & overhead) (429-7007) | SF | 270 | $400.00 | $140.00 | $230.00 | $132.00 | $250.00 | $285.00 | $300.00 |
| 6 | Riprap (stone protection)(24 in) (432-7045) | CY | 110 | $305.00 | $200.00 | $255.00 | $154.00 | $525.00 | $200.00 | $250.00 |
| 7 | Mobilization (500-7001) | LS | 1 | $40,000 | $14,000 | $33,333 | $27,000 | $30,000 | $35,000 | $35,000 |
| 8 | Barricades, signs and traffic handling (502-7001) | MO | 2 | $5,000.00 | $900.00 | $2,500.00 | $1.00 | $250.00 | $5,000.00 | $1.00 |
| 9 | Portable changeable message sign (503-7001) | DAY | 20 | $250.00 | $50.00 | $85.00 | $1.00 | $75.00 | $250.00 | $1.00 |
| 10 | TMA (stationary) (505-7001) | DAY | 20 | $250.00 | $1.00 | $1.00 | $1.00 | $1.00 | $500.00 | $500.00 |
| 11 | TMA (mobile operation) (505-7002) | HR | 60 | $250.00 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 |
| 12 | Construction exits (install) (type 1) (506-7020) | SY | 200 | $33.92 | $5.00 | $30.00 | $1.00 | $25.00 | $25.00 | $35.00 |
| 13 | Construction exits (remove) (506-7024) | SY | 200 | $13.01 | $1.00 | $10.00 | $1.00 | $1.00 | $7.50 | $30.00 |
| 14 | Biodegradable erosion control logs (install) (12") (506-7044) | LF | 600 | $8.14 | $3.00 | $5.00 | $1.00 | $4.00 | $5.00 | $5.00 |
| 15 | Biodegradable erosion control logs (remove) (506-7046) | LF | 600 | $2.96 | $1.00 | $1.00 | $1.00 | $1.00 | $3.00 | $5.00 |
| 16 | Steel bridge zone painting ref STR #4 (4010-7005) | EACH | 48 | $1,040.00 | $1,400.00 | $1,400.00 | $2,200.00 | $1,250.00 | $1,400.00 | $300.00 |
The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.
Source
Read from TxDOT's tabulation for this contract. TxDOT Bid Tabulations open-data export (data.texas.gov) from September 2024, read 21 November 2026, and TxDOT's legacy Tabulation of Bids pages for January 2020 to August 2024. The legacy pages are a large sample, not every contract: their file names were reused from year to year. Their district is the one TxDOT gives the county. Bids that did not match their published total are left out.
Every contract let that day: TxDOT letting of February 6, 2025. Compiled by Mirage Metrics.
Your own bid history, read the same way
Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.