TxDOT contract A00213103 bid tabulation
METAL BEAM GUARD FENCE REPAIR, US0377 (DISTRICT-WIDE to DISTRICT-WIDE). Let by Texas DOT on February 6, 2025, Brown, Brownwood District. 7 bids received; low bid $1,320,359 by Ross Sa Enterprise LLC, -33% against the engineer's estimate of $1,972,330.
- Owner
- Texas DOT
- Letting
- 06 FEB 2025
- Pay items
- 51
- Data through
- 19 NOV 2026
Bidders
| Rank | Bidder | Total bid | Against the low bid | Against the estimate |
|---|---|---|---|---|
| 1 | Ross Sa Enterprise LLC | $1,320,359 | Low | -33% |
| 2 | BK Field Operations LLC | $1,344,870 | +2.0% | -32% |
| 3 | T&L Cleaning Services LLC | $1,389,159 | +5.0% | -30% |
| 4 | Lakey, Inc. | $1,744,890 | +32% | -12% |
| 5 | HJC Farms, Inc. | $1,911,715 | +45% | -3.0% |
| 6 | B & MS Construction, Inc. | $1,973,030 | +49% | 0.0% |
| 7 | Above All Contracting LLC | $2,143,015 | +62% | +9.0% |
Engineer's estimate: $1,972,330.
Bid tabulation
| Line | Pay item | Unit | Quantity | Estimate | 1. Ross Sa Enterprise LLC | 2. BK Field Operations LLC | 3. T&L Cleaning Services LLC | 4. Lakey, Inc. | 5. HJC Farms, Inc. | 6. B & MS Construction, Inc. |
|---|---|---|---|---|---|---|---|---|---|---|
| 1 | Riprap (mow strip)(4 in) (432-7013) | CY | 5 | $477.76 | $450.00 | $300.00 | $500.00 | $700.00 | $500.00 | $489.00 |
| 2 | Mobilization (callout) (500-7002) | EACH | 10 | $4,000.00 | $1.00 | $1.00 | $1.00 | $100.00 | $10,000 | $3,500.00 |
| 3 | TMA (stationary) (505-7001) | DAY | 130 | $334.94 | $2,000.00 | $1.00 | $1.00 | $205.00 | $200.00 | $310.00 |
| 4 | Metal W-beam guard fence (timber post) (540-7001) | LF | 2,500 | $29.87 | $10.00 | $11.00 | $21.00 | $28.65 | $10.00 | $45.00 |
| 5 | Metal W-beam guard fence (steel post) (540-7002) | LF | 5,000 | $37.22 | $10.00 | $15.00 | $24.00 | $33.00 | $30.00 | $55.00 |
| 6 | Metal beam guard fence trans (thrie-beam) (540-7005) | EACH | 10 | $2,444.55 | $1,350.00 | $1,000.00 | $1,500.00 | $2,370.00 | $2,500.00 | $2,000.00 |
| 7 | Metal beam guard fence trans (T101) (540-7007) | EACH | 2 | $889.23 | $500.00 | $500.00 | $100.00 | $1,000.00 | $10.00 | $1,850.00 |
| 8 | Short radius (28") (540-7013) | LF | 100 | $277.24 | $20.00 | $20.00 | $20.00 | $382.70 | $25.00 | $75.00 |
| 9 | Downstream anchor terminal section (540-7015) | EACH | 5 | $1,618.23 | $1,000.00 | $1,100.00 | $1,500.00 | $1,500.00 | $1,000.00 | $1,850.00 |
| 10 | Metal W - beam guard fence (low fill culvert) (540-7018) | LF | 25 | $92.80 | $50.00 | $70.00 | $20.00 | $95.00 | $75.00 | $35.00 |
| 11 | Metal beam guard fence (long span system) (540-7027) | EACH | 5 | $1,432.60 | $1.00 | $500.00 | $100.00 | $867.41 | $1,500.00 | $1,350.00 |
| 12 | Metal beam guard fence trans (31"-28")(25') (540-7031) | EACH | 30 | $1,676.11 | $450.00 | $150.00 | $100.00 | $1,400.00 | $500.00 | $700.00 |
| 13 | Terminal anchor section (540-7041) | EACH | 5 | $1,464.77 | $1.00 | $1.00 | $100.00 | $1,600.00 | $1.00 | $800.00 |
| 14 | Remove metal beam guard fence (542-7001) | LF | 2,000 | $4.49 | $1.00 | $14.00 | $0.01 | $3.00 | $1.00 | $5.00 |
| 15 | Remove terminal anchor section (542-7002) | EACH | 10 | $385.52 | $1.00 | $1.00 | $1.00 | $236.14 | $1.00 | $350.00 |
| 16 | Remove downstream anchor terminal (542-7003) | EACH | 10 | $220.78 | $1.00 | $1.00 | $1.00 | $170.00 | $1.00 | $350.00 |
| 17 | Guardrail end TRTMNT(retro)(steel post) (544-7008) | EACH | 2 | $4,067.00 | $1.00 | $500.00 | $1.00 | $2,000.00 | $250.00 | $1,100.00 |
| 18 | Guardrail end TRTMNT(retro)(wood post) (544-7009) | EACH | 2 | $5,580.00 | $1.00 | $500.00 | $1.00 | $2,000.00 | $250.00 | $750.00 |
| 19 | Replace rail element (W-beam) (770-7001) | LF | 4,500 | $23.00 | $5.00 | $11.00 | $18.00 | $23.00 | $27.50 | $35.00 |
| 20 | Repl rail elmnt(thrie-BM trans to W-BM) (770-7003) | EACH | 25 | $52.00 | $10.00 | $750.00 | $20.00 | $20.00 | $300.00 | $30.00 |
| 21 | Replace timber post W/O concrete FND (770-7006) | EACH | 250 | $69.02 | $1.00 | $100.00 | $20.00 | $5.50 | $50.00 | $60.00 |
| 22 | Replace steel post W/O concrete FND (770-7007) | EACH | 300 | $68.90 | $85.00 | $70.00 | $40.00 | $52.50 | $75.00 | $55.00 |
| 23 | Replace timber post W/ concrete FND (770-7008) | EACH | 20 | $33.30 | $85.00 | $20.00 | $25.00 | $5.50 | $50.00 | $45.00 |
| 24 | Replace steel post W/ concrete FND (770-7009) | EACH | 300 | $79.05 | $85.00 | $100.00 | $45.00 | $65.00 | $75.00 | $55.00 |
| 25 | Realign posts (770-7010) | EACH | 150 | $41.71 | $95.00 | $1.00 | $5.00 | $22.50 | $10.00 | $30.00 |
| 26 | Rem obsolete get & repl W/ SGT (770-7013) | EACH | 150 | $3,965.23 | $3,000.00 | $3,400.00 | $4,000.00 | $4,200.00 | $3,700.00 | $3,600.00 |
| 27 | Repl single gdrail terminal impact head (770-7015) | EACH | 25 | $1,036.32 | $750.00 | $625.00 | $750.00 | $925.00 | $1,250.00 | $1,200.00 |
| 28 | Replace single gdrail terminal rail (770-7016) | LF | 500 | $31.69 | $50.00 | $50.00 | $20.00 | $27.50 | $50.00 | $35.00 |
| 29 | Replace single gdrail terminal post (770-7017) | EACH | 100 | $155.00 | $1.00 | $60.00 | $20.00 | $165.00 | $100.00 | $150.00 |
| 30 | Replace blockout (770-7018) | EACH | 300 | $56.04 | $85.00 | $250.00 | $10.00 | $20.00 | $15.00 | $32.00 |
| 31 | Repair steel post with base plate (770-7019) | EACH | 5 | $178.88 | $100.00 | $100.00 | $200.00 | $65.00 | $5.00 | $350.00 |
| 32 | Reset SGT impact head (770-7020) | EACH | 25 | $267.15 | $100.00 | $80.00 | $1.00 | $100.00 | $150.00 | $150.00 |
| 33 | Replace SGT object marker (770-7021) | EACH | 5 | $91.99 | $1.00 | $25.00 | $30.00 | $1.00 | $50.00 | $45.00 |
| 34 | Replace SGT cable anchor (770-7022) | EACH | 10 | $52.73 | $1.00 | $60.00 | $1.00 | $1.00 | $75.00 | $78.00 |
| 35 | Replace SGT cable assembly (770-7023) | EACH | 10 | $53.75 | $1.00 | $60.00 | $1.00 | $1.00 | $75.00 | $78.00 |
| 36 | Replace SGT strut (770-7024) | EACH | 10 | $73.95 | $1.00 | $60.00 | $1.00 | $1.00 | $75.00 | $80.00 |
| 37 | Replace downstream anchor terminal (770-7026) | EACH | 10 | $1,265.00 | $1,000.00 | $750.00 | $1,500.00 | $1,175.00 | $1,200.00 | $1,650.00 |
| 38 | Replace posts (TL-3)(gibraltar) (771-7001) | EACH | 1,500 | $58.00 | $6.00 | $140.00 | $80.00 | $115.00 | $200.00 | $75.00 |
| 39 | Replace posts (TL-3)(trinity) (771-7003) | EACH | 1,500 | $147.00 | $8.00 | $1.00 | $130.00 | $1.00 | $200.00 | $170.00 |
| 40 | Replace posts (TL-4)(gibraltar) (771-7005) | EACH | 500 | $310.00 | $184.00 | $180.00 | $160.00 | $200.00 | $100.00 | $190.00 |
| 41 | Cable splice / turnbuckle (TL-3) (771-7009) | EACH | 10 | $183.73 | $100.00 | $90.00 | $1.00 | $127.63 | $1.00 | $190.00 |
| 42 | Cable splice / turnbuckle (TL-4) (771-7010) | EACH | 10 | $120.09 | $100.00 | $90.00 | $1.00 | $50.00 | $1.00 | $275.00 |
| 43 | Repair or replace cable barrier terminal sec(TL-3) (771-7013) | EACH | 20 | $1,159.42 | $1,200.00 | $2,000.00 | $500.00 | $1,500.00 | $2,500.00 | $1,600.00 |
| 44 | Repair or replace cable barrier terminal sec(TL-4) (771-7014) | EACH | 10 | $2,058.66 | $1,450.00 | $1,500.00 | $1,000.00 | $1,350.00 | $1,000.00 | $900.00 |
| 45 | Replace cable (TL-3) (771-7015) | LF | 50 | $1.21 | $234.00 | $100.00 | $1.00 | $0.75 | $0.50 | $125.00 |
| 46 | Replace post hardware (TL-3) (771-7019) | EACH | 100 | $23.00 | $1,421.00 | $150.00 | $20.00 | $525.00 | $20.00 | $165.00 |
| 47 | Replace post hardware (TL-4) (771-7020) | EACH | 100 | $762.50 | $141.00 | $150.00 | $20.00 | $1,000.00 | $1.00 | $190.00 |
| 48 | Repair (T101) (776-7006) | LF | 50 | $20.00 | $1.00 | $1.00 | $20.00 | $45.00 | $5.00 | $75.00 |
| 49 | Repair (steel post W/ base plate)(T101) (776-7007) | EACH | 5 | $118.57 | $1.00 | $1.00 | $100.00 | $110.00 | $50.00 | $275.00 |
| 50 | Repair steel post W/ base plate (T6) (776-7015) | EACH | 5 | $128.39 | $200.00 | $150.00 | $100.00 | $100.00 | $50.00 | $180.00 |
| 51 | Replace(steel rail) (776-7024) | LF | 25 | $292.00 | $1.00 | $40.00 | $20.00 | $307.00 | $5.00 | $390.00 |
The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.
Source
Read from TxDOT's tabulation for this contract. TxDOT Bid Tabulations open-data export (data.texas.gov) from September 2024, read 21 November 2026, and TxDOT's legacy Tabulation of Bids pages for January 2020 to August 2024. The legacy pages are a large sample, not every contract: their file names were reused from year to year. Their district is the one TxDOT gives the county. Bids that did not match their published total are left out.
Every contract let that day: TxDOT letting of February 6, 2025. Compiled by Mirage Metrics.