TxDOT contract A00209377 bid tabulation

Repair Roadway, FM 2499 (FM 1171 to Tarrant County Line). Let by Texas DOT on February 6, 2025, Denton, Dallas District. 6 bids received; low bid $1,920,305 by Roy Jorgensen Associates, Inc., -22% against the engineer's estimate of $2,467,225.

Owner
Texas DOT
Letting
06 FEB 2025
Pay items
49
Data through
19 NOV 2026

Bidders

RankBidderTotal bidAgainst the low bidAgainst the estimate
1Roy Jorgensen Associates, Inc.$1,920,305Low-22%
2O. Trevino Construction, LLC$2,287,200+19%-7.0%
3Silver Creek Construction, Inc.$2,366,239+23%-4.0%
4MB Western Industrial Contracting Co.$2,397,628+25%-3.0%
5Garret Shields Infrastructure$2,481,037+29%+1.0%
6Grey Sky Construction LLC$3,144,168+64%+27%
TxDOT contract A00209377: bids by rank

Engineer's estimate: $2,467,225.

Bid tabulation

LinePay itemUnitQuantityEstimate1. Roy Jorgensen Associates, Inc.2. O. Trevino Construction, LLC3. Silver Creek Construction, Inc.4. MB Western Industrial Contracting Co.5. Garret Shields Infrastructure6. Grey Sky Construction LLC
1Full - depth repair CPCD (8") (361-7019)CY1,158$1,100.00$800.00$1,015.00$1,108.00$950.00$1,200.00$1,600.00
2Full - depth repair CPCD (10") (361-7021)CY106$775.00$1,060.00$1,150.00$1,100.00$1,200.00$1,800.00
3Flowable backfill (401-7001)CY25$300.00$320.00$458.00$400.00$750.00$1,000.00$350.00
4Concrete structure repair (vertical & overhead) (429-7007)SF24$50.00$525.00$255.00$300.00$500.00$200.00$500.00
5Riprap (stone protection)(12 in) (432-7041)CY135$225.00$225.00$420.00$300.00$400.00$300.00$185.00
6Cleaning and sealing existing joints (438-7001)LF597$10.00$45.00$60.00$15.00$90.00$60.00$60.00
7Clean existing culverts (480-7001)EACH2$5,000.00$4,500.00$35,720$14,000$30,000$25,000$5,000.00
8Mobilization (500-7001)LS1$231,203$190,000$228,000$236,000$250,000$200,000$300,000
9Barricades, signs and traffic handling (502-7001)MO6$20,000$10,000$6,500.00$15,000$10,000$5,000.00$15,000
10Portable changeable message sign (503-7002)EACH2$15,000$5,500.00$19,000$15,000$10,000$1.00$16,500
11TMA (stationary) (505-7001)DAY70$250.00$500.00$138.00$350.00$300.00$300.00$250.00
12TMA (mobile operation) (505-7002)HR400$60.00$1.00$77.00$100.00$90.00$30.00$85.00
13Biodegradable erosion control logs (install) (12") (506-7044)LF550$5.00$7.00$6.13$5.00$10.00$10.00$18.00
14Biodegradable erosion control logs (remove) (506-7046)LF550$2.00$3.00$1.33$2.00$5.00$1.00$9.00
15Concrete curb (mono) (type II) (529-7007)LF300$20.00$55.00$26.25$20.00$15.00$40.00$50.00
16Work zone pavement marking SHT terminal (tab)type W (662-7112)EACH1,259$1.50$5.00$2.85$2.50$2.00$5.00$6.00
17Reflectorized pavement marking type I (W)6"(DOT)(100MIL) (666-7009)LF650$2.00$1.44$0.92$1.50$1.22$1.76$1.00
18Reflectorized pavement marking type I (W)8"(solid)(100MIL) (666-7024)LF17,886$2.75$1.05$0.92$1.00$1.22$1.20$1.00
19Reflectorized pavement marking type I (W)24"(solid)(100MIL) (666-7036)LF10,578$10.00$8.43$6.47$7.15$8.58$8.40$8.00
20Reflectorized pavement marking type I (W)(arrow)(100MIL) (666-7042)EACH170$150.00$174.90$188.81$150.00$250.25$177.00$200.00
21Reflectorized pavement marking type I(W)(double arrow)(100MIL) (666-7045)EACH11$270.00$312.70$323.67$200.00$429.00$235.00$500.00
22Reflectorized pavement marking type I (W)(word)(100MIL) (666-7066)EACH155$180.00$206.70$210.39$185.00$279.00$218.00$200.00
23Ref pavement marking type I(W)36"(yld tri)(100MIL) (666-7090)EACH8$55.00$53.00$37.76$65.00$50.05$77.00$50.00
24Pavement sler 6" (666-7347)LF119,084$0.30$0.20$0.27$0.19$0.36$0.22$0.30
25Pavement sler 8" (666-7348)LF17,886$0.50$0.27$0.40$0.29$0.53$0.34$0.40
26Pavement sler 24" (666-7352)LF10,578$1.50$1.59$1.19$1.60$1.57$1.90$1.25
27Pavement sler (arrow) (666-7353)EACH170$25.00$63.60$21.58$30.00$28.60$35.00$50.00
28Pavement sler (word) (666-7354)EACH155$30.00$63.60$21.58$35.00$28.60$42.00$50.00
29Pavement sler (double arrow) (666-7356)EACH11$35.00$95.40$30.21$40.00$40.04$47.00$50.00
30Pavement sler (yld tri) (666-7365)EACH8$20.00$15.90$5.39$15.00$7.15$18.00$10.00
31Reflectorized pavement marking type I (W)6"(broken)(100MIL) (666-7408)LF23,670$1.00$0.66$0.70$0.70$0.93$0.82$0.50
32Reflectorized pavement marking type I (W)6"(solid)(100MIL) (666-7411)LF47,306$1.00$0.65$0.64$0.68$0.84$0.80$0.50
33Reflectorized pavement marking type I (Y)6"(solid)(100MIL) (666-7423)LF47,458$1.00$0.65$0.64$0.68$0.84$0.80$0.50
34Reflectorized pavement marker type II-C-R (672-7006)EACH2,078$5.00$5.15$4.32$4.55$5.72$5.35$6.00
35Eliminating existing PM & markers (4") (677-7001)LF119,084$0.50$0.68$0.54$0.48$0.72$0.56$0.50
36Eliminating existing PM & markers (8") (677-7004)LF17,886$1.00$0.85$0.76$0.90$1.00$1.06$1.00
37Eliminating existing PM & markers (12") (677-7006)LF6,408$1.50$1.86$2.16$2.35$2.86$2.76$3.00
38Eliminating existing PM & markers (24") (677-7008)LF3,560$2.50$3.13$3.24$3.95$4.29$4.65$5.00
39Eliminating existing PM & markers (arrow) (677-7009)EACH150$60.00$74.20$59.34$45.00$78.65$52.94$65.00
40Eliminating existing PM & markers (double arrow) (677-7010)EACH11$88.00$95.40$80.92$63.00$107.25$75.00$100.00
41Eliminating existing PM & markers (word) (677-7015)EACH124$70.00$74.20$59.34$53.00$78.65$62.00$65.00
42Pavement surface preparation for marking (6") (678-7002)LF119,084$0.30$0.03$0.07$0.02$0.09$0.04$0.15
43Pavement surface preparation for marking (8") (678-7004)LF17,886$0.30$0.03$0.09$0.07$0.11$0.08$0.15
44Pavement surface preparation for marking (24") (678-7008)LF10,578$0.50$1.06$0.22$0.56$0.29$0.66$0.25
45Pavement surface preparation for marking (arrow) (678-7009)EACH170$20.00$31.80$10.79$13.50$14.30$15.88$20.00
46Pavement surface preparation for marking (double arrow) (678-7010)EACH11$30.00$31.80$16.18$19.00$21.45$22.35$20.00
47Pavement surface preparation for marking (word) (678-7016)EACH155$20.00$31.80$10.79$15.75$14.30$18.50$20.00
48Pavement surface preparation for marking (36")(yld tri) (678-7023)EACH8$20.00$10.60$5.39$6.45$7.15$7.60$15.00
49Tree trimming / brush removal(channels) (752-7003)ACRE0.15$50,000$25,000$139,650$30,000$20,000$100,000$100,000
TxDOT contract A00209377: unit prices by line

The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.

Source

Read from TxDOT's tabulation for this contract. TxDOT Bid Tabulations open-data export (data.texas.gov) from September 2024, read 21 November 2026, and TxDOT's legacy Tabulation of Bids pages for January 2020 to August 2024. The legacy pages are a large sample, not every contract: their file names were reused from year to year. Their district is the one TxDOT gives the county. Bids that did not match their published total are left out.

Every contract let that day: TxDOT letting of February 6, 2025. Compiled by Mirage Metrics.

Your own bid history, read the same way

Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.

We use your email to reply to you and, now and then, to tell you about Mirage. You can opt out at any time. Privacy policy