| 1 | Removing concrete (mowstrip) (104-7005) | LF | 168.50 | $11.00 | $30.00 | $100.00 | $36.75 |
| 2 | Embankment (final)(DC)(type C) (132-7006) | CY | 9.45 | $25.00 | $75.00 | $1,300.00 | $564.10 |
| 3 | Backfill (type A or B) (134-7004) | STA | 143.17 | $300.00 | $350.00 | $330.00 | $387.25 |
| 4 | Block sodding (162-7002) | SY | 322.95 | $6.85 | $7.00 | $5.00 | $8.50 |
| 5 | Fertilizer (166-7001) | ACRE | 0.06 | $1,200.00 | $1,200.00 | $750.00 | $4,900.00 |
| 6 | Vegetative watering (168-7001) | TGL | 7.58 | $42.40 | $80.00 | $30.00 | $114.10 |
| 7 | Asphalt (AC-20-5TR) (316-7007) | GAL | 62,530 | $3.96 | $3.95 | $3.15 | $4.00 |
| 8 | Aggregate (type-PB or PL, GR-4)(sac-B) (316-7245) | CY | 1,503 | $223.00 | $195.00 | $252.00 | $297.00 |
| 9 | SP mixes SP-D sac-A PG76-22 (344-7064) | TON | 16,121 | $142.50 | $132.00 | $167.00 | $185.00 |
| 10 | Tack coat (344-7077) | GAL | 6,970 | $4.70 | $3.00 | $3.40 | $9.20 |
| 11 | Flexible pavement structure repair(4") (351-7003) | SY | 1,000 | $57.50 | $44.00 | $36.50 | $60.20 |
| 12 | Flexible pavement structure repair(12") (351-7011) | SY | 500 | $188.00 | $90.00 | $98.00 | $180.00 |
| 13 | Plane concrete pavement(0" to 1.5") (354-7065) | SY | 3,250 | $3.50 | $22.00 | $17.00 | $33.50 |
| 14 | Full - depth repair CRCP (10") (361-7005) | CY | 1,000 | $1,292.50 | $1,900.00 | $1,750.00 | $2,144.30 |
| 15 | Drilled shaft (traffic signal pole) (36 in) (416-7044) | LF | 112 | $275.00 | $400.00 | $295.00 | $361.50 |
| 16 | Drilled shaft (traffic signal pole) (48 in) (416-7046) | LF | 264 | $350.00 | $650.00 | $505.00 | $845.50 |
| 17 | Concrete structure repair (vertical & overhead) (429-7007) | SF | 12 | $750.00 | $1,700.00 | $1,500.00 | $1,838.00 |
| 18 | Concrete structure repair (standard) (429-7009) | SF | 400 | $150.00 | $300.00 | $250.00 | $306.35 |
| 19 | Riprap (mow strip)(4 in) (432-7013) | CY | 42.40 | $640.50 | $1,100.00 | $2,000.00 | $1,554.60 |
| 20 | Riprap (stone protection)(12 in) (432-7041) | CY | 120 | $293.93 | $1,200.00 | $285.00 | $1,838.00 |
| 21 | Cleaning existing joints (438-7008) | LF | 208 | $20.00 | $75.00 | $40.00 | $49.00 |
| 22 | Adjusting manholes (479-7001) | EACH | 22 | $1,000.00 | $1,200.00 | $515.00 | $306.35 |
| 23 | Adjusting manholes (utility box) (479-7004) | EACH | 5 | $300.00 | $1,000.00 | $398.00 | $306.35 |
| 24 | Mobilization (500-7001) | LS | 1 | $655,428 | $720,000 | $840,000 | $500,391 |
| 25 | Barricades, signs and traffic handling (502-7001) | MO | 6 | $10,500 | $15,000 | $30,000 | $876.10 |
| 26 | Portable changeable message sign (503-7001) | DAY | 260 | $115.00 | $300.00 | $82.00 | $136.00 |
| 27 | TMA (stationary) (505-7001) | DAY | 304 | $234.87 | $350.00 | $252.00 | $294.00 |
| 28 | TMA (mobile operation) (505-7003) | DAY | 45 | $300.00 | $275.00 | $258.00 | $548.15 |
| 29 | Temporary sediment control fence (install) (506-7039) | LF | 205 | $4.79 | $12.00 | $3.75 | $6.45 |
| 30 | Temporary sediment control fence (remove) (506-7041) | LF | 205 | $1.89 | $3.00 | $2.00 | $2.45 |
| 31 | Biodegradable erosion control logs (install) (8") (506-7043) | LF | 352 | $5.71 | $10.00 | $8.00 | $8.00 |
| 32 | Biodegradable erosion control logs (remove) (506-7046) | LF | 352 | $2.00 | $3.00 | $2.00 | $2.45 |
| 33 | Curb ramps (type 1) (531-7005) | EACH | 3 | $2,373.17 | $3,200.00 | $5,500.00 | $5,514.00 |
| 34 | Metal W-beam guard fence (timber post) (540-7001) | LF | 250 | $26.50 | $30.00 | $25.59 | $42.90 |
| 35 | Metal beam guard fence trans (thrie-beam) (540-7005) | EACH | 4 | $2,150.00 | $2,700.00 | $4,400.00 | $2,879.50 |
| 36 | Remove metal beam guard fence (542-7001) | LF | 195 | $3.25 | $4.00 | $3.50 | $6.15 |
| 37 | Remove downstream anchor terminal (542-7003) | EACH | 4 | $250.00 | $350.00 | $250.00 | $612.65 |
| 38 | Guardrail end treatment (install) (544-7001) | EACH | 4 | $3,195.63 | $3,750.00 | $3,076.00 | $3,892.25 |
| 39 | Conduit (PVC) (schedule 80) (2") (618-7054) | LF | 195 | $12.50 | $20.00 | $16.75 | $18.75 |
| 40 | Conduit (PVC) (schedule 80) (2") (bore) (618-7055) | LF | 450 | $17.50 | $21.00 | $17.75 | $19.25 |
| 41 | Conduit (PVC) (schedule 80) (3") (618-7060) | LF | 550 | $18.50 | $22.00 | $18.25 | $24.55 |
| 42 | Conduit (PVC) (schedule 80) (3") (bore) (618-7061) | LF | 1,625 | $23.50 | $23.00 | $18.75 | $24.55 |
| 43 | Conduit (PVC) (schedule 80) (4") (618-7064) | LF | 75 | $25.50 | $33.00 | $27.95 | $38.60 |
| 44 | Conduit (PVC) (schedule 80) (4") (bore) (618-7065) | LF | 290 | $30.50 | $25.00 | $20.75 | $38.60 |
| 45 | Electrical conductor (no.14) insulated (620-7002) | LF | 680 | $1.00 | $2.00 | $1.35 | $0.65 |
| 46 | Electrical conductor (no.8) bare (620-7007) | LF | 3,115 | $1.85 | $2.25 | $2.00 | $2.35 |
| 47 | Electrical conductor (no.4) insulated (620-7012) | LF | 725 | $3.00 | $4.00 | $3.25 | $3.70 |
| 48 | Tray cable (4 conductor) (12 AWG) (621-7006) | LF | 3,520 | $3.25 | $3.50 | $3.20 | $3.95 |
| 49 | ITS GND box(pcast) type 1 (243636)W/aprn (623-7002) | EACH | 1 | $4,500.00 | $6,500.00 | $5,845.00 | $5,759.00 |
| 50 | Ground box type D (162922)W/apron (624-7008) | EACH | 23 | $1,250.00 | $1,400.00 | $1,245.00 | $1,562.30 |
| 51 | Remove ground box (624-7013) | EACH | 17 | $325.00 | $500.00 | $375.00 | $490.15 |
| 52 | Elc SRV type D 120/240 060(NS)SS(E)SP(O) (628-7148) | EACH | 5 | $5,600.00 | $8,200.00 | $6,785.00 | $7,474.35 |
| 53 | Replace existing aluminum signs(type A) (636-7004) | SF | 19 | $44.31 | $30.00 | $24.00 | $47.80 |
| 54 | Install small roadside sign support and assembly type 10BWG(1)SA(T) (644-7004) | EACH | 14 | $611.30 | $800.00 | $645.50 | $961.90 |
| 55 | Remove SM RD SN sup&AM (644-7073) | EACH | 3 | $88.16 | $130.00 | $110.00 | $153.20 |
| 56 | Install delineator assembly (D-SW)SZ 1(BRF)CTB (BR) (658-7014) | EACH | 45 | $17.00 | $25.00 | $18.00 | $42.90 |
| 57 | Install delineator assembly (D-SW)SZ 1(BRF)GF2 (658-7018) | EACH | 13 | $33.00 | $40.00 | $25.00 | $47.20 |
| 58 | Work zone pavement marking non-removing (W)4"(broken) (662-7001) | LF | 17,588 | $0.40 | $0.30 | $0.45 | $0.35 |
| 59 | Work zone pavement marking non-removing (W)4"(solid) (662-7004) | LF | 3,818 | $0.31 | $0.30 | $0.45 | $0.35 |
| 60 | Work zone pavement marking non-removing (W)6"(solid) (662-7008) | LF | 4,460 | $0.42 | $0.35 | $0.65 | $0.40 |
| 61 | Work zone pavement marking non-removing (W)8"(solid) (662-7012) | LF | 10,962 | $0.65 | $0.75 | $0.80 | $0.75 |
| 62 | Work zone pavement marking non-removing (W)18"(solid) (662-7016) | LF | 50 | $4.50 | $3.50 | $4.00 | $3.55 |
| 63 | Work zone pavement marking non-removing (W)24"(solid) (662-7017) | LF | 5,426 | $3.18 | $4.00 | $4.00 | $4.50 |
| 64 | Work zone pavement marking non-removing(W)18"(yld tri) (662-7031) | EACH | 26 | $55.00 | $20.00 | $4.00 | $22.10 |
| 65 | Work zone pavement marking non-removing (Y)4"(solid) (662-7035) | LF | 22,098 | $1.48 | $0.30 | $0.45 | $0.35 |
| 66 | Work zone pavement marking non-removing (Y)18"(solid) (662-7041) | LF | 212 | $4.50 | $3.00 | $4.00 | $3.55 |
| 67 | Reflectorized pavement marking type I (W)8"(DOT)(100MIL) (666-7018) | LF | 50 | $1.80 | $1.75 | $3.00 | $1.80 |
| 68 | Reflectorized pavement marking type I (W)8"(solid)(100MIL) (666-7024) | LF | 2,578 | $1.50 | $1.75 | $1.40 | $1.80 |
| 69 | Reflectorized pavement marking type I (W)24"(solid)(100MIL) (666-7036) | LF | 2,835 | $7.40 | $7.50 | $9.25 | $8.10 |
| 70 | Ref pavement marking type I(W)36"(yld tri)(100MIL) (666-7090) | EACH | 169 | $45.00 | $44.00 | $41.00 | $47.80 |
| 71 | Reflectorized pavement marking type I (Y)12"(solid)(100MIL) (666-7117) | LF | 153 | $3.17 | $4.00 | $3.50 | $4.60 |
| 72 | Reflectorized pavement marking type I(Y)(med nose)(100MIL) (666-7132) | EACH | 18 | $250.00 | $150.00 | $255.00 | $144.60 |
| 73 | RE PV marking type I(black)6"(shadow)(100MIL) (666-7138) | LF | 13,485 | $1.00 | $0.90 | $1.00 | $1.00 |
| 74 | Reflectorized pavement marking type II (W) 18" (solid) (666-7183) | LF | 60 | $6.34 | $4.00 | $3.00 | $3.80 |
| 75 | Reflectorized pavement marking type II (Y) 12" (solid) (666-7215) | LF | 5,697 | $1.50 | $2.30 | $1.50 | $2.45 |
| 76 | Reflectorized pavement marking type II (Y) 18" (solid) (666-7216) | LF | 106 | $7.00 | $4.00 | $3.00 | $3.80 |
| 77 | Reflectorized profile pavement marking type I(W)6"(solid)(100MIL) (666-7266) | LF | 12,510 | $1.00 | $1.00 | $1.38 | $1.10 |
| 78 | All-wther PM type I (W)6"(solid)(100MIL) (666-7309) | LF | 9,169 | $0.97 | $1.10 | $1.00 | $1.20 |
| 79 | All-wther PM type I (W)6"(broken)(100MIL) (666-7310) | LF | 13,485 | $1.80 | $1.10 | $1.00 | $1.20 |
| 80 | All-wther PM type I (Y)6"(solid)(100MIL) (666-7315) | LF | 30,871 | $0.97 | $1.10 | $1.25 | $1.20 |
| 81 | All-wther PM type I (Y)6"(broken)(100MIL) (666-7316) | LF | 1,940 | $1.53 | $1.10 | $1.25 | $1.20 |
| 82 | Prefabricated PM type C (W)(arrow) (668-7091) | EACH | 40 | $213.00 | $275.00 | $255.00 | $292.85 |
| 83 | Prefabricated PM type C (W)(word) (668-7103) | EACH | 24 | $284.00 | $300.00 | $380.00 | $299.00 |
| 84 | Prefabricated PM type C (W)(18")(yld tri) (668-7110) | EACH | 13 | $45.00 | $55.00 | $55.00 | $57.60 |
| 85 | Reflectorized pavement marker type I-C (672-7002) | EACH | 360 | $5.04 | $7.50 | $5.00 | $8.20 |
| 86 | Reflectorized pavement marker type II-A-A (672-7004) | EACH | 200 | $5.62 | $7.50 | $5.00 | $8.20 |
| 87 | Reflectorized pavement marker type II-C-R (672-7006) | EACH | 486 | $4.90 | $7.50 | $5.00 | $8.20 |
| 88 | Pavement surface preparation for marking (6") (678-7002) | LF | 81,460 | $0.06 | $0.07 | $0.10 | $0.10 |
| 89 | Pavement surface preparation for marking (8") (678-7004) | LF | 2,628 | $0.25 | $0.15 | $0.12 | $0.15 |
| 90 | Pavement surface preparation for marking (12") (678-7006) | LF | 153 | $0.27 | $0.75 | $0.16 | $0.70 |
| 91 | Pavement surface preparation for marking (18") (678-7007) | LF | 166 | $2.60 | $1.00 | $0.32 | $0.85 |
| 92 | Pavement surface preparation for marking (24") (678-7008) | LF | 2,835 | $0.53 | $1.50 | $0.60 | $1.15 |
| 93 | Pavement surface preparation for marking (arrow) (678-7009) | EACH | 40 | $15.30 | $40.00 | $7.00 | $42.90 |
| 94 | Pavement surface preparation for marking (word) (678-7016) | EACH | 24 | $20.50 | $40.00 | $7.00 | $42.90 |
| 95 | Pavement surface preparation for marking (18")(yld tri) (678-7022) | EACH | 13 | $20.00 | $30.00 | $2.00 | $30.65 |
| 96 | Pavement surface preparation for marking (36")(yld tri) (678-7023) | EACH | 169 | $5.00 | $40.00 | $2.00 | $36.75 |
| 97 | Install highway traffic signal (system) (680-7003) | EACH | 5 | $35,000 | $42,000 | $31,728 | $36,407 |
| 98 | Removing traffic signals (680-7004) | EACH | 5 | $3,900.00 | $3,600.00 | $3,125.00 | $6,126.55 |
| 99 | Vehicle signal section (12")LED(green) (682-7001) | EACH | 61 | $225.00 | $360.00 | $320.00 | $365.15 |
| 100 | Vehicle signal section (12")LED(green arrow) (682-7002) | EACH | 16 | $225.00 | $360.00 | $320.00 | $365.15 |
| 101 | Vehicle signal section (12")LED(yel) (682-7003) | EACH | 67 | $225.00 | $360.00 | $320.00 | $365.15 |
| 102 | Vehicle signal section (12")LED(yel arrow) (682-7004) | EACH | 16 | $225.00 | $360.00 | $320.00 | $365.15 |
| 103 | Vehicle signal section (12")LED(red) (682-7005) | EACH | 73 | $225.00 | $360.00 | $320.00 | $365.15 |
| 104 | Vehicle signal section (12")LED(red arrow) (682-7006) | EACH | 32 | $225.00 | $360.00 | $320.00 | $365.15 |
| 105 | Pedestrian signal section (LED)(countdown) (682-7018) | EACH | 10 | $675.00 | $900.00 | $765.00 | $820.95 |
| 106 | Backplate W/reflectorized border(4 sec) (682-7037) | EACH | 16 | $225.00 | $310.00 | $275.00 | $245.10 |
| 107 | Backplate W/reflectorized border(3 sec) (682-7054) | EACH | 67 | $175.00 | $260.00 | $230.00 | $171.55 |
| 108 | Traffic signal CBL (type A)(12 AWG)(2 conductor) (684-7007) | LF | 1,810 | $1.75 | $2.20 | $1.85 | $2.35 |
| 109 | Traffic signal CBL (type A)(12 AWG)(4 conductor) (684-7009) | LF | 1,850 | $2.00 | $3.00 | $2.35 | $2.95 |
| 110 | Traffic signal CBL (type A)(12 AWG)(7 conductor) (684-7012) | LF | 10,350 | $3.00 | $3.20 | $2.95 | $4.70 |
| 111 | Ins traffic signal PL AM(S)1 arm(28')lum (686-7031) | EACH | 1 | $11,750 | $14,700 | $12,775 | $15,929 |
| 112 | Ins traffic signal PL AM(S)1 arm(36')lum (686-7039) | EACH | 4 | $14,250 | $15,900 | $13,895 | $17,247 |
| 113 | Ins traffic signal PL AM(S)1 arm(40')lum (686-7043) | EACH | 1 | $15,750 | $17,800 | $15,875 | $19,727 |
| 114 | Ins traffic signal PL AM(S)1 arm(44')lum (686-7047) | EACH | 1 | $17,750 | $19,100 | $16,675 | $20,708 |
| 115 | Ins traffic signal PL AM(S)1 arm(50')lum (686-7055) | EACH | 1 | $25,250 | $31,500 | $28,275 | $35,534 |
| 116 | Ins traffic signal PL AM(S)1 arm(55') (686-7057) | EACH | 2 | $26,500 | $28,900 | $25,675 | $32,103 |
| 117 | Ins traffic signal PL AM(S)1 arm(55')lum (686-7059) | EACH | 4 | $27,750 | $31,700 | $28,875 | $36,269 |
| 118 | Ins traffic signal PL AM(S)1 arm(60')lum (686-7063) | EACH | 2 | $28,250 | $33,000 | $30,275 | $37,984 |
| 119 | Ins traffic signal PL AM(S)1 arm(65')lum (686-7067) | EACH | 3 | $30,750 | $33,200 | $30,675 | $38,597 |
| 120 | Pedestrian pole assembly (687-7001) | EACH | 6 | $2,350.00 | $2,750.00 | $2,500.00 | $2,450.65 |
| 121 | Pedestrian detect push button (APS) (688-7001) | EACH | 10 | $875.00 | $1,000.00 | $885.00 | $857.75 |
| 122 | Pedestrian detector controller unit (688-7003) | EACH | 2 | $2,950.00 | $4,000.00 | $3,685.00 | $3,859.75 |
| 123 | Handwork - drain slots, barrier slots (738-7111) | SY | 6 | $200.00 | $400.00 | $440.00 | $490.15 |
| 124 | Tree trimming / brush removal (752-7001) | MI | 2 | $2,900.00 | $14,000 | $22,570 | $6,253.30 |
| 125 | Drain inlet cleaning (764-7001) | EACH | 44 | $100.00 | $800.00 | $300.00 | $230.70 |
| 126 | CNC crack repair (discrete)(inject) (780-7002) | LF | 40 | $162.50 | $500.00 | $400.00 | $490.15 |
| 127 | CNC crack repair (discrete)(surface seal) (780-7004) | LF | 5,000 | $71.00 | $60.00 | $50.00 | $61.30 |
| 128 | Bbu system (external battery cabinet) (6007-7001) | EACH | 5 | $8,000.00 | $10,100 | $9,025.00 | $9,067.25 |
| 129 | RVDS (presence det)(install only) (6008-7004) | EACH | 20 | $750.00 | $1,100.00 | $975.00 | $796.45 |
| 130 | RVDS (advance det)(install only) (6008-7005) | EACH | 10 | $750.00 | $1,150.00 | $1,035.00 | $857.75 |
| 131 | Fiber optic patch panel (12 position) (6027-7005) | EACH | 5 | $2,500.00 | $2,000.00 | $1,775.00 | $2,728.75 |