TxDOT contract A00207984 bid tabulation
Landscape Development, IH 69 (Fort Bend County Line to Clay Street). Let by Texas DOT on February 6, 2025, Harris, Houston District. 4 bids received; low bid $3,952,210 by Yellowstone Landscape - Central, Inc., -11% against the engineer's estimate of $4,442,820.
- Owner
- Texas DOT
- Letting
- 06 FEB 2025
- Pay items
- 47
- Data through
- 19 NOV 2026
Bidders
| Rank | Bidder | Total bid | Against the low bid | Against the estimate |
|---|---|---|---|---|
| 1 | Yellowstone Landscape - Central, Inc. | $3,952,210 | Low | -11% |
| 2 | Green Sage Services LLC | $4,624,991 | +17% | +4.0% |
| 3 | C. E. Barker, LTD. | $10,234,574 | +159% | +130% |
| 4 | Central North Construction, LLC | $13,571,902 | +243% | +205% |
Engineer's estimate: $4,442,820.
Bid tabulation
| Line | Pay item | Unit | Quantity | Estimate | 1. Yellowstone Landscape - Central, Inc. | 2. Green Sage Services LLC | 3. C. E. Barker, LTD. | 4. Central North Construction, LLC |
|---|---|---|---|---|---|---|---|---|
| 1 | Preparing row (100-7001) | ACRE | 0.70 | $20,000 | $4,800.00 | $1,450,000 | $570,000 | |
| 2 | Preparation row (tree remove) (0"-12" diameter) (100-7003) | EACH | 5 | $535.00 | $500.00 | $108.58 | $500.00 | |
| 3 | Preparation row (tree remove) (12"-24" diameter) (100-7004) | EACH | 678 | $725.00 | $704.44 | $525.00 | $271.44 | $1,500.00 |
| 4 | Erosion control compost (4") (161-7006) | SY | 688.90 | $2.50 | $3.90 | $4.25 | $2.17 | $12.50 |
| 5 | Erosion control compost (vehicle) (161-7008) | CY | 2,051.20 | $22.50 | $30.02 | $32.00 | $59.72 | $35.00 |
| 6 | General use compost (vehicle) (161-7010) | CY | 596.20 | $30.79 | $34.00 | $59.72 | $40.00 | |
| 7 | Block sodding (162-7002) | SY | 5,021 | $5.50 | $5.05 | $4.45 | $8.69 | $7.00 |
| 8 | Fertilizer (166-7001) | ACRE | 1.02 | $1,250.00 | $1,316.95 | $800.00 | $1,085.75 | $5,500.00 |
| 9 | Vegetative watering (168-7001) | TGL | 52.80 | $35.00 | $42.40 | $38.00 | $2,860.95 | $85.00 |
| 10 | Irrigation system (type I) (170-7002) | EACH | 1 | $115,000 | $1.00 | $128,000 | $162,863 | $350,000 |
| 11 | Irrigation system (type II) (170-7003) | EACH | 1 | $72,530 | $195,000 | $651,450 | $200,000 | |
| 12 | Soil amend (type I) (192-7008) | SY | 9,105.50 | $0.15 | $0.14 | $0.45 | $1.63 | $1.75 |
| 13 | Plant bed preparation (type I) (192-7010) | SY | 5,955 | $0.75 | $0.68 | $0.80 | $1.95 | $3.00 |
| 14 | Plant bed preparation (type II) (192-7011) | SY | 3,350 | $0.31 | $0.80 | $1.63 | $3.00 | |
| 15 | Plant bed preparation (type III) (192-7012) | SY | 3,150.50 | $0.52 | $1.25 | $2.17 | $3.00 | |
| 16 | Plant material (5 gal) (tree) (192-7035) | EACH | 45 | $24.88 | $38.00 | $65.15 | $60.00 | |
| 17 | Plant material (15 gal) (tree) (192-7037) | EACH | 50 | $149.25 | $160.00 | $200.86 | $165.00 | |
| 18 | Plant material (30 gal) (tree) (192-7039) | EACH | 66 | $266.85 | $280.00 | $320.30 | $300.00 | |
| 19 | Plant material (1 gal) (shrub) (192-7044) | EACH | 14,429 | $10.00 | $9.00 | $9.70 | $15.20 | $15.00 |
| 20 | Plant material (3 gal) (shrub) (192-7046) | EACH | 1,934 | $20.45 | $23.00 | $36.92 | $28.00 | |
| 21 | Soil amend (type II) (192-7084) | SY | 9,105.50 | $0.20 | $0.13 | $0.50 | $1.09 | $2.00 |
| 22 | Plant material (3 gal)(tree) (192-7094) | EACH | 7,536 | $24.50 | $23.77 | $31.00 | $62.97 | $28.00 |
| 23 | Landscape establish (193-7001) | MO | 20 | $9,500.00 | $8,208.96 | $12,000 | $16,286 | $28,000 |
| 24 | Landscape establish (193-7002) | CYC | 5 | $45,000 | $59,701 | $37,000 | $23,887 | $150,000 |
| 25 | Landscape treat (193-7022) | CYC | 28 | $12,300 | $14,392 | $19,000 | $19,001 | $125,000 |
| 26 | Landscape treat (type I) (193-7023) | EACH | 1,401 | $1.00 | $0.97 | $1.20 | $162.86 | $10.00 |
| 27 | Landscape treat (type II) (193-7024) | EACH | 4,203 | $0.35 | $0.30 | $1.25 | $43.43 | $8.00 |
| 28 | Landscape treat (type I) (193-7025) | CYC | 0.95 | $130,000 | $222,387 | $460,000 | $217,150 | $425,000 |
| 29 | Landscape treat (type II) (193-7026) | CYC | 2 | $50,000 | $47,761 | $54,000 | $182,406 | $56,000 |
| 30 | Landscape treat (type III) (193-7028) | EACH | 12,358 | $2.00 | $2.13 | $1.50 | $81.43 | $5.00 |
| 31 | Landscape treat (type IV) (193-7029) | EACH | 6 | $7,500.00 | $4,975.12 | $1,750.00 | $13,572 | $12,500 |
| 32 | Landscape treat (type V) (193-7030) | EACH | 1 | $82,090 | $32,000 | $217,150 | $150,000 | |
| 33 | Landscape treat (type VI) (193-7031) | EACH | 1 | $8,656.72 | $14,500 | $135,719 | $100,000 | |
| 34 | Landscape treat (type VII) (193-7032) | EACH | 14 | $1,759.06 | $2,000.00 | $19,001 | $2,000.00 | |
| 35 | Landscape treat (type IX) (193-7034) | EACH | 2 | $3,750.00 | $6,716.42 | $4,000.00 | $32,399 | $25,000 |
| 36 | Landscape treat (type III) (193-7036) | CYC | 1 | $75,000 | $85,000 | $93,000 | $1,005,405 | $265,000 |
| 37 | Landscape treat (type VI) (193-7039) | CYC | 1 | $125,000 | $105,774 | $38,000 | $16,286 | $225,000 |
| 38 | Landscape treat (type VII) (193-7040) | CYC | 4 | $39,500 | $30,970 | $68,000 | $30,944 | $105,000 |
| 39 | Class B concrete (miscellaneous) (420-7011) | CY | 299.50 | $734.78 | $650.00 | $2,280.08 | $1,500.00 | |
| 40 | Mobilization (500-7001) | LS | 1 | $404,484 | $388,060 | $170,000 | $918,000 | $1,200,000 |
| 41 | Barricades, signs and traffic handling (502-7001) | MO | 9 | $8,500.00 | $7,610.58 | $29,000 | $3,669.84 | $12,000 |
| 42 | TMA (stationary) (505-7001) | DAY | 75 | $700.00 | $666.67 | $770.00 | $233.44 | $375.00 |
| 43 | TMA (mobile operation) (505-7003) | DAY | 100 | $700.00 | $671.64 | $830.00 | $499.45 | $515.00 |
| 44 | Biodegradable erosion control logs (install) (8") (506-7043) | LF | 14,000 | $2.72 | $5.50 | $6.51 | $6.50 | |
| 45 | Biodegradable erosion control logs (remove) (506-7046) | LF | 14,000 | $0.73 | $1.50 | $1.09 | $2.00 | |
| 46 | Litter removal (734-7002) | CYC | 56 | $11,000 | $6,130.06 | $8,000.00 | $5,564.47 | $36,000 |
| 47 | Debris removal (frontage roads) (735-7026) | CYC | 2 | $20,125 | $15,000 | $12,000 | $10,993 | $75,000 |
The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.
Source
Read from TxDOT's tabulation for this contract. TxDOT Bid Tabulations open-data export (data.texas.gov) from September 2024, read 21 November 2026, and TxDOT's legacy Tabulation of Bids pages for January 2020 to August 2024. The legacy pages are a large sample, not every contract: their file names were reused from year to year. Their district is the one TxDOT gives the county. Bids that did not match their published total are left out.
Every contract let that day: TxDOT letting of February 6, 2025. Compiled by Mirage Metrics.
Your own bid history, read the same way
Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.