TxDOT contract A00184068 bid tabulation
Traffic Signal Improvements, S 14TH ST (Sayles Boulevard to .). Let by Texas DOT on July 1, 2025, Taylor, Abilene District. 4 bids received; low bid $643,372 by Willis Electric Co., LP, -2.1% against the engineer's estimate of $657,138.
- Owner
- Texas DOT
- Letting
- 01 JUL 2025
- Pay items
- 89
- Data through
- 19 NOV 2026
Bidders
| Rank | Bidder | Total bid | Against the low bid | Against the estimate |
|---|---|---|---|---|
| 1 | Willis Electric Co., LP | $643,372 | Low | -2.0% |
| 2 | Yunex LLC | $768,329 | +19% | +17% |
| 3 | Grey Sky Construction LLC | $831,743 | +29% | +27% |
| 4 | Vaca Underground Utilities Inc | $1,001,150 | +56% | +52% |
Engineer's estimate: $657,138.
Bid tabulation
| Line | Pay item | Unit | Quantity | Estimate | 1. Willis Electric Co., LP | 2. Yunex LLC | 3. Grey Sky Construction LLC | 4. Vaca Underground Utilities Inc |
|---|---|---|---|---|---|---|---|---|
| 1 | Remove (0"-12") TRT/untrt base & asphalt pavement (105-7052) | SY | 29 | $13.20 | $55.00 | $294.00 | $100.00 | $2,000.00 |
| 2 | Rework BS metal (type C)(8")(ord comp) (251-7051) | SY | 29 | $87.90 | $110.00 | $236.00 | $100.00 | $200.00 |
| 3 | Cement (275-7001) | TON | 0.42 | $250.00 | $2,750.00 | $11,759 | $10,000 | $2,500.00 |
| 4 | Cement TRT (existing material)(6") (275-7002) | SY | 29 | $5.00 | $275.00 | $471.00 | $100.00 | $500.00 |
| 5 | D-GR HMA type-B PG64-22 (exempt) (341-7003) | TON | 10 | $286.81 | $605.00 | $941.00 | $1,000.00 | $500.00 |
| 6 | D-GR HMA type D sac-B PG70-22 (exempt) (341-7067) | TON | 4 | $601.02 | $605.00 | $1,764.00 | $1,200.00 | $500.00 |
| 7 | Drilled shaft (traffic signal pole) (36 in) (416-7044) | LF | 26 | $480.15 | $550.00 | $755.00 | $450.00 | $500.00 |
| 8 | Drilled shaft (traffic signal pole) (48 in) (416-7046) | LF | 44 | $785.47 | $750.00 | $819.00 | $650.00 | $750.00 |
| 9 | Riprap (concrete)(6 in) (432-7003) | CY | 2 | $750.24 | $1,650.00 | $1,000.00 | $1,500.00 | $1,250.00 |
| 10 | Mobilization (500-7001) | LS | 1 | $61,374 | $64,000 | $111,705 | $75,000 | $100,000 |
| 11 | Barricades, signs and traffic handling (502-7001) | MO | 4 | $11,705 | $1,500.00 | $10,568 | $8,500.00 | $10,000 |
| 12 | Portable changeable message sign (503-7002) | EACH | 4 | $5,000.00 | $2,500.00 | $8,467.00 | $10,000 | $5,000.00 |
| 13 | TMA (stationary) (505-7001) | DAY | 6 | $405.03 | $250.00 | $565.00 | $250.00 | $1,000.00 |
| 14 | Concrete curb & gutter (type II) (529-7009) | LF | 105 | $181.50 | $55.00 | $76.50 | $150.00 | $50.00 |
| 15 | Concrete sidewalks (6") (531-7003) | SY | 31 | $220.00 | $192.50 | $206.00 | $150.00 | $175.00 |
| 16 | Curb ramps (type 1) (531-7005) | EACH | 2 | $2,070.00 | $1,320.00 | $4,116.00 | $3,250.00 | $7,500.00 |
| 17 | Curb ramps (type 5) (531-7008) | EACH | 2 | $4,008.81 | $1,485.00 | $5,292.00 | $3,250.00 | $7,500.00 |
| 18 | Curb ramps (type 7) (531-7010) | EACH | 2 | $2,770.00 | $1,540.00 | $4,704.00 | $3,250.00 | $7,500.00 |
| 19 | Curb ramps (type 21) (531-7013) | EACH | 2 | $4,531.48 | $1,485.00 | $5,292.00 | $3,250.00 | $7,500.00 |
| 20 | Conduit (PVC) (schedule 80) (2") (618-7054) | LF | 35 | $22.19 | $18.00 | $36.00 | $40.00 | $25.00 |
| 21 | Conduit (PVC) (schedule 80) (2") (bore) (618-7055) | LF | 100 | $38.92 | $22.00 | $67.70 | $60.00 | $50.00 |
| 22 | Conduit (PVC) (schedule 80) (3") (618-7060) | LF | 220 | $29.39 | $45.00 | $31.50 | $50.00 | $50.00 |
| 23 | Conduit (PVC) (schedule 80) (4") (618-7064) | LF | 20 | $38.58 | $50.00 | $68.60 | $60.00 | $250.00 |
| 24 | Conduit (PVC) (schedule 80) (4") (bore) (618-7065) | LF | 450 | $71.50 | $55.00 | $83.80 | $70.00 | $100.00 |
| 25 | Electrical conductor (no.12) insulated (620-7004) | LF | 480 | $2.15 | $1.50 | $3.10 | $3.00 | $2.00 |
| 26 | Electrical conductor (no.8) insulated (620-7008) | LF | 1,010 | $3.40 | $1.75 | $3.60 | $3.00 | $2.00 |
| 27 | Electrical conductor (no.6) bare (620-7009) | LF | 715 | $2.62 | $2.00 | $3.80 | $3.00 | $2.00 |
| 28 | Electrical conductor (no.6) insulated (620-7010) | LF | 50 | $3.91 | $2.25 | $4.20 | $3.00 | $2.00 |
| 29 | Ground box type C (162911)W/apron (624-7006) | EACH | 6 | $1,952.92 | $2,000.00 | $3,815.00 | $1,150.00 | $2,000.00 |
| 30 | Ground box type D (162922)W/apron (624-7008) | EACH | 1 | $1,500.00 | $2,250.00 | $5,650.00 | $1,500.00 | $2,000.00 |
| 31 | Remove ground box (624-7013) | EACH | 6 | $381.29 | $250.00 | $445.00 | $150.00 | $500.00 |
| 32 | Elc SRV type D 120/240 100(NS)SS(N)PS(U) (628-7257) | EACH | 1 | $7,800.00 | $8,500.00 | $10,081 | $12,500 | $15,000 |
| 33 | Aluminum signs (type A) (636-7001) | SF | 87.50 | $72.13 | $100.00 | $37.00 | $30.00 | $50.00 |
| 34 | Relocate SM RD SN sup&AM type 10BWG (644-7065) | EACH | 2 | $775.50 | $850.00 | $513.00 | $1,150.00 | $1,500.00 |
| 35 | Remove SM RD SN sup&AM (sign only) (644-7075) | EACH | 3 | $117.85 | $125.00 | $112.00 | $500.00 | $500.00 |
| 36 | Reflectorized pavement marking type I (W)8"(solid)(090MIL) (666-7023) | LF | 415 | $3.45 | $7.00 | $1.60 | $6.00 | $10.00 |
| 37 | Reflectorized pavement marking type I (W)24"(solid)(090MIL) (666-7035) | LF | 680 | $18.57 | $14.00 | $9.20 | $15.00 | $15.00 |
| 38 | Pavement sler 4" (666-7346) | LF | 660 | $1.22 | $2.00 | $0.60 | $2.00 | $10.00 |
| 39 | Pavement sler 8" (666-7348) | LF | 415 | $0.83 | $2.20 | $1.20 | $6.00 | $15.00 |
| 40 | Pavement sler 24" (666-7352) | LF | 680 | $6.60 | $4.65 | $3.60 | $15.00 | $20.00 |
| 41 | Pavement sler (arrow) (666-7353) | EACH | 7 | $64.23 | $110.00 | $89.00 | $250.00 | $350.00 |
| 42 | Pavement sler (word) (666-7354) | EACH | 5 | $70.44 | $82.50 | $100.00 | $250.00 | $500.00 |
| 43 | Reflectorized pavement marking type I (W)4"(broken)(090MIL) (666-7401) | LF | 260 | $4.03 | $4.25 | $8.30 | $2.00 | $10.00 |
| 44 | Reflectorized pavement marking type I (Y)4"(solid)(090MIL) (666-7416) | LF | 400 | $6.03 | $3.70 | $5.90 | $2.00 | $10.00 |
| 45 | Prefabricated PM type C (W)(arrow) (668-7091) | EACH | 7 | $411.13 | $555.50 | $500.00 | $250.00 | $500.00 |
| 46 | Prefabricated PM type C (W)(word) (668-7103) | EACH | 5 | $202.65 | $455.00 | $647.00 | $250.00 | $750.00 |
| 47 | Reflectorized pavement marker type II-A-A (672-7004) | EACH | 20 | $15.62 | $16.50 | $18.00 | $6.00 | $25.00 |
| 48 | Reflectorized pavement marker type II-C-R (672-7006) | EACH | 48 | $8.57 | $16.50 | $18.00 | $6.00 | $25.00 |
| 49 | Eliminating existing PM & markers (12") (677-7006) | LF | 160 | $2.73 | $3.25 | $3.60 | $8.00 | $10.00 |
| 50 | Eliminating existing PM & markers (24") (677-7008) | LF | 225 | $6.66 | $6.25 | $7.10 | $20.00 | $10.00 |
| 51 | Eliminating existing PM & markers (arrow) (677-7009) | EACH | 1 | $118.15 | $135.00 | $142.00 | $250.00 | $350.00 |
| 52 | Eliminating existing PM & markers (word) (677-7015) | EACH | 1 | $111.51 | $135.00 | $171.00 | $250.00 | $350.00 |
| 53 | Eliminating existing PM & markers (plowable RPMS) (677-7031) | EACH | 165 | $1.00 | $2.25 | $8.30 | $50.00 | $350.00 |
| 54 | Pavement surface preparation for marking (4") (678-7001) | LF | 660 | $0.84 | $0.02 | $1.20 | $2.00 | $1.00 |
| 55 | Pavement surface preparation for marking (8") (678-7004) | LF | 415 | $2.20 | $0.06 | $2.40 | $6.00 | $1.00 |
| 56 | Pavement surface preparation for marking (24") (678-7008) | LF | 680 | $4.95 | $0.55 | $3.60 | $15.00 | $1.00 |
| 57 | Pavement surface preparation for marking (arrow) (678-7009) | EACH | 7 | $53.56 | $11.00 | $77.00 | $250.00 | $1.00 |
| 58 | Pavement surface preparation for marking (word) (678-7016) | EACH | 5 | $57.29 | $11.00 | $89.00 | $250.00 | $1.00 |
| 59 | Pavement surface preparation for marking (RPM) (678-7033) | EACH | 68 | $5.28 | $1.10 | $3.55 | $50.00 | $1.00 |
| 60 | Install highway traffic signal (isolated) (680-7002) | EACH | 1 | $46,200 | $45,000 | $32,835 | $40,000 | $125,000 |
| 61 | Removing traffic signals (680-7004) | EACH | 1 | $6,500.00 | $13,000 | $6,662.00 | $10,000 | $8,000.00 |
| 62 | Vehicle signal section (12")LED(green) (682-7001) | EACH | 10 | $385.56 | $350.00 | $425.00 | $350.00 | $500.00 |
| 63 | Vehicle signal section (12")LED(green arrow) (682-7002) | EACH | 6 | $385.56 | $350.00 | $425.00 | $350.00 | $500.00 |
| 64 | Vehicle signal section (12")LED(yel) (682-7003) | EACH | 10 | $385.56 | $350.00 | $425.00 | $350.00 | $500.00 |
| 65 | Vehicle signal section (12")LED(yel arrow) (682-7004) | EACH | 10 | $385.56 | $350.00 | $425.00 | $350.00 | $500.00 |
| 66 | Vehicle signal section (12")LED(red) (682-7005) | EACH | 10 | $385.56 | $350.00 | $425.00 | $350.00 | $500.00 |
| 67 | Vehicle signal section (12")LED(red arrow) (682-7006) | EACH | 4 | $385.56 | $350.00 | $425.00 | $350.00 | $500.00 |
| 68 | Pedestrian signal section (LED)(countdown) (682-7018) | EACH | 8 | $951.89 | $925.00 | $1,002.00 | $3,500.00 | $1,000.00 |
| 69 | Backplate W/reflectorized border(3 sec)aluminum (682-7039) | EACH | 8 | $240.87 | $200.00 | $185.00 | $250.00 | $250.00 |
| 70 | Backplate W/reflectorized border(4 sec)aluminum (682-7040) | EACH | 4 | $290.54 | $225.00 | $197.00 | $250.00 | $275.00 |
| 71 | Backplate W/reflectorized border(5 sec)aluminum (682-7041) | EACH | 2 | $330.00 | $300.00 | $232.00 | $250.00 | $300.00 |
| 72 | Traffic signal CBL (type A)(14 AWG)(5 conductor) (684-7031) | LF | 505 | $3.85 | $4.00 | $4.50 | $3.00 | $3.00 |
| 73 | Traffic signal CBL (type A)(14 AWG)(7 conductor) (684-7033) | LF | 380 | $5.50 | $4.50 | $4.90 | $3.00 | $4.00 |
| 74 | Traffic signal CBL (type A)(14 AWG)(10 conductor) (684-7036) | LF | 660 | $6.60 | $5.00 | $6.40 | $3.00 | $5.00 |
| 75 | Traffic signal CBL (type A)(14 AWG)(20 conductor) (684-7046) | LF | 620 | $9.90 | $8.00 | $9.50 | $3.00 | $10.00 |
| 76 | Traffic signal CBL (type C)(12 AWG)(2 conductor) (684-7079) | LF | 1,275 | $4.40 | $2.50 | $4.20 | $3.00 | $2.00 |
| 77 | Ins traffic signal PL AM(S)1 arm(48')lum (686-7051) | EACH | 2 | $20,500 | $24,000 | $18,987 | $22,000 | $20,000 |
| 78 | Ins traffic signal PL AM(S)1 arm(55')lum (686-7059) | EACH | 1 | $40,030 | $52,000 | $36,001 | $60,000 | $40,000 |
| 79 | Ins traffic signal PL AM(S)1 arm(65')lum (686-7067) | EACH | 1 | $38,838 | $55,000 | $38,510 | $70,000 | $45,000 |
| 80 | Pedestrian pole assembly (687-7001) | EACH | 5 | $3,600.66 | $4,250.00 | $2,976.00 | $4,500.00 | $3,000.00 |
| 81 | Pedestrian detect push button (APS) (688-7001) | EACH | 8 | $1,145.43 | $1,250.00 | $901.00 | $1,850.00 | $1,000.00 |
| 82 | Pedestrian detector controller unit (688-7003) | EACH | 1 | $4,095.83 | $5,000.00 | $4,590.00 | $6,500.00 | $5,000.00 |
| 83 | ITS com CBL (ethernet) (6005-7001) | LF | 170 | $5.58 | $2.50 | $3.90 | $3.00 | $1.00 |
| 84 | Video imaging and radar detector (6017-7015) | EACH | 4 | $5,037.15 | $8,500.00 | $5,736.00 | $10,000 | $6,500.00 |
| 85 | Video imaging and radar set-UP sys (6017-7016) | EACH | 1 | $1,744.45 | $1,000.00 | $1,163.00 | $5,000.00 | $500.00 |
| 86 | Vid image and radar com cable (coax) (6017-7017) | LF | 835 | $3.72 | $2.50 | $3.90 | $3.00 | $5.00 |
| 87 | Vid image and radar det processor sys (6017-7018) | EACH | 1 | $12,978 | $17,500 | $11,321 | $20,000 | $15,000 |
| 88 | FO splice enclosure (type 1) (6027-7009) | EACH | 1 | $3,080.00 | $6,750.00 | $3,511.00 | $5,000.00 | $7,500.00 |
| 89 | FO CBL (12 SMF)(pigtail) (6027-7020) | LF | 165 | $8.28 | $10.00 | $9.00 | $50.00 | $5.00 |
The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.
Source
Read from TxDOT's tabulation for this contract. TxDOT Bid Tabulations open-data export (data.texas.gov) from September 2024, read 21 November 2026, and TxDOT's legacy Tabulation of Bids pages for January 2020 to August 2024. The legacy pages are a large sample, not every contract: their file names were reused from year to year. Their district is the one TxDOT gives the county. Bids that did not match their published total are left out.
Every contract let that day: TxDOT letting of July 1, 2025. Compiled by Mirage Metrics.