TxDOT contract A00200975 bid tabulation
Hazard Elimination & Safety, CR 42 (CR 1232 to .). Let by Texas DOT on January 7, 2026, Midland, Odessa District. 3 bids received; low bid $414,647 by Willis Electric Co., LP, -4.5% against the engineer's estimate of $434,174.
- Owner
- Texas DOT
- Letting
- 07 JAN 2026
- Pay items
- 40
- Data through
- 19 NOV 2026
Bidders
| Rank | Bidder | Total bid | Against the low bid | Against the estimate |
|---|---|---|---|---|
| 1 | Willis Electric Co., LP | $414,647 | Low | -4.0% |
| 2 | Vaca Underground Utilities Inc | $424,869 | +2.0% | -2.0% |
| 3 | Grey Sky Construction LLC | $513,251 | +24% | +18% |
Engineer's estimate: $434,174.
Bid tabulation
| Line | Pay item | Unit | Quantity | Estimate | 1. Willis Electric Co., LP | 2. Vaca Underground Utilities Inc | 3. Grey Sky Construction LLC |
|---|---|---|---|---|---|---|---|
| 1 | Drilled shaft (traffic signal pole) (30 in) (416-7043) | LF | 28 | $450.00 | $425.00 | $300.00 | $550.00 |
| 2 | Drilled shaft (traffic signal pole) (36 in) (416-7044) | LF | 32 | $495.00 | $500.00 | $350.00 | $650.00 |
| 3 | Mobilization (500-7001) | LS | 1 | $20,761 | $40,000 | $40,000 | $45,000 |
| 4 | Barricades, signs and traffic handling (502-7001) | MO | 2 | $15,000 | $5,000.00 | $3,000.00 | $8,500.00 |
| 5 | Portable changeable message sign (503-7002) | EACH | 2 | $15,000 | $2,500.00 | $6,500.00 | $10,000 |
| 6 | TMA (stationary) (505-7001) | DAY | 40 | $250.00 | $200.00 | $150.00 | $250.00 |
| 7 | Biodegradable erosion control logs (install) (8") (506-7043) | LF | 353 | $10.00 | $10.00 | $1.00 | $12.00 |
| 8 | Biodegradable erosion control logs (remove) (506-7046) | LF | 353 | $4.00 | $1.00 | $1.00 | $9.00 |
| 9 | Conduit (PVC) (schedule 40) (2") (618-7030) | LF | 461 | $20.00 | $8.00 | $30.00 | $20.00 |
| 10 | Conduit (PVC) (schedule 40) (2") (bore) (618-7031) | LF | 392 | $45.00 | $25.00 | $30.00 | $60.00 |
| 11 | Conduit (PVC) (schedule 40) (3") (618-7036) | LF | 267 | $35.00 | $12.00 | $20.00 | $40.00 |
| 12 | Conduit (PVC) (schedule 40) (3") (bore) (618-7037) | LF | 302 | $50.00 | $30.00 | $30.00 | $60.00 |
| 13 | Electrical conductor (no.12) insulated (620-7004) | LF | 1,815 | $2.00 | $1.00 | $2.00 | $3.00 |
| 14 | Electrical conductor (no.8) insulated (620-7008) | LF | 1,959 | $2.50 | $1.50 | $2.50 | $3.00 |
| 15 | Electrical conductor (no.6) bare (620-7009) | LF | 1,605 | $3.00 | $1.75 | $2.75 | $3.00 |
| 16 | Electrical conductor (no.6) insulated (620-7010) | LF | 42 | $3.25 | $2.00 | $3.00 | $3.00 |
| 17 | Ground box type A (122311)W/apron (624-7002) | EACH | 5 | $1,700.00 | $1,750.00 | $1,400.00 | $1,500.00 |
| 18 | Ground box type C (162911)W/apron (624-7006) | EACH | 4 | $2,000.00 | $2,150.00 | $1,400.00 | $2,000.00 |
| 19 | Elc SRV type D 120/240 060(NS)SS(E)SP(O) (628-7148) | EACH | 1 | $10,000 | $13,000 | $8,000.00 | $12,500 |
| 20 | Aluminum signs (type A) (636-7001) | SF | 13 | $100.00 | $40.00 | $30.00 | $30.00 |
| 21 | Prefabricated PM type C (W)(24")(solid) (668-7089) | LF | 80 | $20.00 | $42.00 | $25.00 | $20.00 |
| 22 | Pavement surface preparation for marking (24") (678-7008) | LF | 80 | $2.00 | $36.75 | $25.00 | $20.00 |
| 23 | Install highway traffic signal (system) (680-7003) | EACH | 1 | $50,000 | $56,500 | $50,000 | $40,000 |
| 24 | Vehicle signal section (12")LED(green) (682-7001) | EACH | 12 | $400.00 | $375.00 | $375.00 | $350.00 |
| 25 | Vehicle signal section (12")LED(green arrow) (682-7002) | EACH | 2 | $400.00 | $375.00 | $375.00 | $350.00 |
| 26 | Vehicle signal section (12")LED(yel) (682-7003) | EACH | 12 | $400.00 | $375.00 | $375.00 | $350.00 |
| 27 | Vehicle signal section (12")LED(yel arrow) (682-7004) | EACH | 2 | $400.00 | $375.00 | $375.00 | $350.00 |
| 28 | Vehicle signal section (12")LED(red) (682-7005) | EACH | 12 | $400.00 | $375.00 | $375.00 | $350.00 |
| 29 | Backplate W/reflectorized border(3 sec)aluminum (682-7039) | EACH | 10 | $300.00 | $150.00 | $200.00 | $250.00 |
| 30 | Backplate W/reflectorized border(5 sec)aluminum (682-7041) | EACH | 2 | $700.00 | $200.00 | $300.00 | $500.00 |
| 31 | Traffic signal CBL (type A)(14 AWG)(5 conductor) (684-7031) | LF | 312 | $4.00 | $3.00 | $3.25 | $3.00 |
| 32 | Traffic signal CBL (type A)(14 AWG)(7 conductor) (684-7033) | LF | 108 | $4.75 | $3.50 | $4.00 | $3.00 |
| 33 | Traffic signal CBL (type A)(14 AWG)(16 conductor) (684-7042) | LF | 597 | $8.00 | $6.00 | $10.00 | $5.00 |
| 34 | Install RDSD FLSH BCN assembly (solar PWRD) (685-7004) | EACH | 2 | $8,000.00 | $10,500 | $7,500.00 | $9,500.00 |
| 35 | Ins traffic signal PL AM(S)1 arm(24')lum&ilsn (686-7028) | EACH | 1 | $15,000 | $19,000 | $15,000 | $16,500 |
| 36 | Ins traffic signal PL AM(S)1 arm(28')lum&ilsn (686-7032) | EACH | 1 | $16,750 | $20,000 | $15,500 | $18,500 |
| 37 | Ins traffic signal PL AM(S)1 arm(36')lum&ilsn (686-7040) | EACH | 1 | $19,000 | $24,000 | $17,000 | $20,000 |
| 38 | Ins traffic signal PL AM(S)1 arm(40')lum&ilsn (686-7044) | EACH | 1 | $20,000 | $26,000 | $18,000 | $2,500.00 |
| 39 | Install radar vehicle detection system (690-7134) | EACH | 8 | $5,000.00 | $6,000.00 | $12,000 | $15,000 |
| 40 | Bbu system (stand-alone batt cabinet) (6007-7002) | EACH | 1 | $12,000 | $13,000 | $10,000 | $10,000 |
The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.
Source
Read from TxDOT's tabulation for this contract. TxDOT Bid Tabulations open-data export (data.texas.gov) from September 2024, read 21 November 2026, and TxDOT's legacy Tabulation of Bids pages for January 2020 to August 2024. The legacy pages are a large sample, not every contract: their file names were reused from year to year. Their district is the one TxDOT gives the county. Bids that did not match their published total are left out.
Every contract let that day: TxDOT letting of January 7, 2026. Compiled by Mirage Metrics.
Your own bid history, read the same way
Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.