TxDOT contract A00206422 bid tabulation
Install Traffic Signal, Various (Various Locations to in the Town of Addison). Let by Texas DOT on June 3, 2026, Dallas, Dallas District. 5 bids received; low bid $353,981 by Elecnor Belco Electric, Inc., -19% against the engineer's estimate of $436,624.
- Owner
- Texas DOT
- Letting
- 03 JUN 2026
- Pay items
- 44
- Data through
- 19 NOV 2026
Bidders
| Rank | Bidder | Total bid | Against the low bid | Against the estimate |
|---|---|---|---|---|
| 1 | Elecnor Belco Electric, Inc. | $353,981 | Low | -19% |
| 2 | Durable Specialties, Inc. | $425,943 | +20% | -2.0% |
| 3 | Yunex LLC | $434,097 | +23% | -1.0% |
| 4 | Highway Intelligent Traffic Solutions, Inc. | $473,797 | +34% | +9.0% |
| 5 | American Lighting and Signalization, LLC | $560,000 | +58% | +28% |
Engineer's estimate: $436,624.
Bid tabulation
| Line | Pay item | Unit | Quantity | Estimate | 1. Elecnor Belco Electric, Inc. | 2. Durable Specialties, Inc. | 3. Yunex LLC | 4. Highway Intelligent Traffic Solutions, Inc. | 5. American Lighting and Signalization, LLC |
|---|---|---|---|---|---|---|---|---|---|
| 1 | Removing concrete (curb & gutter) (104-7017) | LF | 163 | $45.00 | $3.00 | $45.00 | $39.00 | $35.90 | $48.00 |
| 2 | Removing concrete (rail W/ metal element) (104-7037) | LF | 17 | $75.00 | $12.00 | $85.00 | $73.00 | $82.84 | $90.00 |
| 3 | Rail (handrail)(type A) (450-7058) | LF | 17 | $100.00 | $251.00 | $440.00 | $356.00 | $355.68 | $443.00 |
| 4 | Mobilization (500-7001) | LS | 1 | $40,000 | $66,000 | $30,000 | $66,762 | $36,240 | $35,657 |
| 5 | Barricades, signs and traffic handling (502-7001) | MO | 3 | $9,000.00 | $9,802.00 | $2,400.00 | $4,984.00 | $3,353.03 | $2,077.00 |
| 6 | Portable changeable message sign (503-7001) | DAY | 20 | $150.00 | $150.00 | $85.00 | $62.00 | $68.75 | $62.00 |
| 7 | TMA (stationary) (505-7001) | DAY | 80 | $250.00 | $100.00 | $200.00 | $213.00 | $212.50 | $214.00 |
| 8 | Biodegradable erosion control logs (install) (18") (506-7045) | LF | 210 | $8.00 | $11.23 | $1.00 | $8.00 | $10.94 | $7.00 |
| 9 | Biodegradable erosion control logs (remove) (506-7046) | LF | 210 | $2.00 | $5.40 | $0.50 | $2.00 | $3.44 | $0.60 |
| 10 | Remove and relay pavers (528-7003) | SY | 82.50 | $180.00 | $113.00 | $80.00 | $67.00 | $270.50 | $83.00 |
| 11 | Concrete curb (type II) (529-7002) | LF | 135 | $50.00 | $28.00 | $70.00 | $60.00 | $109.14 | $75.00 |
| 12 | Concrete curb & gutter (type II) (529-7009) | LF | 115 | $85.00 | $33.00 | $75.00 | $65.00 | $207.25 | $80.00 |
| 13 | Concrete sidewalks (6") (531-7003) | SY | 47 | $140.00 | $172.00 | $130.00 | $106.00 | $205.14 | $130.00 |
| 14 | Curb ramps (type 2) (531-7006) | EACH | 2 | $4,000.00 | $2,187.00 | $4,400.00 | $3,667.00 | $5,308.34 | $4,570.00 |
| 15 | Curb ramps (type 6) (531-7009) | EACH | 6 | $4,500.00 | $2,660.00 | $4,600.00 | $3,889.00 | $5,850.00 | $4,800.00 |
| 16 | Concrete median (536-7002) | SY | 19.50 | $200.00 | $168.00 | $375.00 | $323.00 | $266.66 | $400.00 |
| 17 | Conduit (PVC) (schedule 80) (3") (618-7060) | LF | 585 | $25.00 | $16.00 | $30.00 | $33.00 | $21.29 | $30.00 |
| 18 | Conduit (PVC) (schedule 80) (3") (bore) (618-7061) | LF | 325 | $45.00 | $37.00 | $56.00 | $51.00 | $29.71 | $30.00 |
| 19 | Conduit (prepare) (618-7090) | LF | 35 | $4.00 | $11.00 | $2.00 | $5.00 | $12.84 | $1.50 |
| 20 | Electrical conductor (no.6) bare (620-7009) | LF | 945 | $2.00 | $3.00 | $4.00 | $3.00 | $2.66 | $3.40 |
| 21 | Electrical conductor (no.6) insulated (620-7010) | LF | 3,360 | $3.00 | $3.00 | $4.00 | $3.40 | $3.26 | $4.00 |
| 22 | Ground box type A (122311)W/apron (624-7002) | EACH | 12 | $2,000.00 | $2,128.00 | $2,100.00 | $2,550.00 | $1,794.66 | $1,700.00 |
| 23 | Aluminum signs (type A) (636-7001) | SF | 207 | $45.00 | $42.00 | $35.00 | $41.00 | $47.01 | $50.00 |
| 24 | Install small roadside sign support and assembly type 10BWG(1)SA(P) (644-7001) | EACH | 8 | $1,000.00 | $822.00 | $1,000.00 | $667.00 | $816.70 | $1,440.00 |
| 25 | Relocate SM RD SN sup&AM type 10BWG (644-7065) | EACH | 2 | $650.00 | $651.00 | $800.00 | $551.00 | $629.68 | $540.00 |
| 26 | Remove SM RD SN sup&AM (644-7073) | EACH | 10 | $150.00 | $119.00 | $375.00 | $112.00 | $170.43 | $385.00 |
| 27 | Reflectorized pavement marking type I (W)12"(solid)(090MIL) (666-7029) | LF | 420 | $4.00 | $12.00 | $5.00 | $6.70 | $7.50 | $5.50 |
| 28 | Reflectorized pavement marking type I (W)24"(solid)(090MIL) (666-7035) | LF | 155 | $8.00 | $24.00 | $10.00 | $11.20 | $12.50 | $11.00 |
| 29 | Pavement sler 12" (666-7350) | LF | 420 | $0.50 | $6.00 | $1.00 | $1.10 | $1.16 | $0.70 |
| 30 | Pavement sler 24" (666-7352) | LF | 155 | $1.25 | $12.00 | $3.00 | $1.90 | $2.06 | $1.40 |
| 31 | Eliminating existing PM & markers (4") (677-7001) | LF | 80 | $0.50 | $3.60 | $1.00 | $0.70 | $0.70 | $1.00 |
| 32 | Eliminating existing PM & markers (12") (677-7006) | LF | 500 | $1.50 | $4.80 | $3.00 | $2.40 | $2.69 | $2.40 |
| 33 | Eliminating existing PM & markers (24") (677-7008) | LF | 85 | $3.50 | $8.00 | $5.00 | $4.80 | $5.38 | $4.90 |
| 34 | Eliminating existing PM & markers (36")(yld tri) (677-7024) | EACH | 12 | $15.00 | $119.00 | $30.00 | $48.00 | $53.75 | $22.00 |
| 35 | Pavement surface preparation for marking (12") (678-7006) | LF | 420 | $0.30 | $5.00 | $1.00 | $0.50 | $0.54 | $0.40 |
| 36 | Pavement surface preparation for marking (24") (678-7008) | LF | 155 | $0.75 | $7.20 | $1.00 | $0.80 | $0.84 | $0.80 |
| 37 | Traffic signal CBL (type C)(12 AWG)(2 conductor) (684-7079) | LF | 560 | $2.50 | $3.60 | $3.00 | $3.40 | $3.76 | $9.00 |
| 38 | Spot tree trimming / brush removal (752-7002) | LF | 125 | $90.00 | $32.00 | $9.00 | $24.00 | $8.18 | $221.00 |
| 39 | Ground box (prepare) (6013-7006) | EACH | 1 | $400.00 | $350.60 | $325.00 | $512.00 | $317.10 | $600.00 |
| 40 | Solar-powered RRFB (two-way wireless) (6073-7005) | EACH | 1 | $11,000 | $6,514.00 | $16,810 | $11,542 | $17,111 | $21,000 |
| 41 | Solar-powered RRFB (one-way hardwired) (6073-7007) | EACH | 2 | $10,500 | $5,663.00 | $16,050 | $9,870.00 | $16,448 | $20,500 |
| 42 | Solar-powered RRFB (one-way wireless) (6073-7008) | EACH | 2 | $11,000 | $6,495.00 | $15,225 | $9,870.00 | $15,661 | $21,500 |
| 43 | RRFB (one-way hardwired) (6108-7001) | EACH | 8 | $10,000 | $5,420.00 | $8,950.00 | $9,024.00 | $10,192 | $16,500 |
| 44 | RRFB (two-way hardwired) (6108-7003) | EACH | 2 | $10,000 | $5,420.00 | $9,785.00 | $10,916 | $9,748.39 | $17,500 |
The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.
Source
Read from TxDOT's tabulation for this contract. TxDOT Bid Tabulations open-data export (data.texas.gov) from September 2024, read 21 November 2026, and TxDOT's legacy Tabulation of Bids pages for January 2020 to August 2024. The legacy pages are a large sample, not every contract: their file names were reused from year to year. Their district is the one TxDOT gives the county. Bids that did not match their published total are left out.
Every contract let that day: TxDOT letting of June 3, 2026. Compiled by Mirage Metrics.
Your own bid history, read the same way
Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.