TxDOT contract A00193312 bid tabulation

Traffic Signal Improvements, SH 289 (SL 12 to McCallum). Let by Texas DOT on April 7, 2026, Dallas, Dallas District. 9 bids received; low bid $2,525,603 by Select Maintenance, L.L.C., -11% against the engineer's estimate of $2,836,917.

Owner
Texas DOT
Letting
07 APR 2026
Pay items
143
Data through
19 NOV 2026

Bidders

RankBidderTotal bidAgainst the low bidAgainst the estimate
1Select Maintenance, L.L.C.$2,525,603Low-11%
2Sice, Inc.$2,576,423+2.0%-9.0%
3Icos Management, LLC$2,697,740+7.0%-5.0%
4American Lighting and Signalization, LLC$2,750,000+9.0%-3.0%
5Yunex LLC$2,818,285+12%-1.0%
6Highway Intelligent Traffic Solutions, Inc.$2,930,327+16%+3.0%
7WG Engineering & Construction, LLC$2,934,849+16%+3.0%
8Durable Specialties, Inc.$3,266,872+29%+15%
9Elecnor Belco Electric, Inc.$3,503,290+39%+23%
TxDOT contract A00193312: bids by rank

Engineer's estimate: $2,836,917.

Bid tabulation

LinePay itemUnitQuantityEstimate1. Select Maintenance, L.L.C.2. Sice, Inc.3. Icos Management, LLC4. American Lighting and Signalization, LLC5. Yunex LLC6. Highway Intelligent Traffic Solutions, Inc.
1Removing concrete (pavement) (104-7001)SY23$40.00$69.25$129.00$73.20$58.89$157.39
2Removing concrete (medians) (104-7008)SY186$40.00$61.41$96.00$64.90$52.23$113.03
3Removing concrete (pavers) (104-7010)SY22$80.00$104.52$107.00$110.00$88.89$129.51
4Removing concrete (sidewalk, ramp or shared use path) (104-7013)SY69$35.00$66.63$107.00$70.40$56.67$147.76
5Removing concrete (curb or curb & gutter) (104-7018)LF639$25.00$49.65$21.50$52.40$42.23$46.99
6Excavation (roadway) (110-7001)CY175$150.00$64.02$64.00$67.60$54.45$82.45
7Block sodding (162-7002)SY40$25.00$19.60$24.00$49.50$16.67$52.29
8Vegetative watering (168-7001)TGL4$300.00$412.55$321.00$4.30$1,266.67$295.00
9Rework BS metal (type C)(8")(ord comp) (251-7051)SY59$41.00$95.38$37.00$101.00$81.12$43.92
10Concrete pavement (CRCP)(fast TRK) (12") (360-7076)SY26$350.00$378.90$278.00$400.00$322.23$303.00
11Concrete pavement (CPCD) (fast TRK) (10.5") (360-7088)SY25$350.00$365.83$268.00$386.00$311.12$303.00
12Drilled shaft (traffic signal pole) (30 in) (416-7043)LF44$400.00$211.96$321.00$380.00$451.39$455.95
13Drilled shaft (traffic signal pole) (36 in) (416-7044)LF117$450.00$434.61$428.00$461.00$469.63$568.29
14Drilled shaft (traffic signal pole) (48 in) (416-7046)LF44$550.00$544.43$589.00$961.00$742.55$586.22
15Class A concrete (median) (420-7003)CY5.80$1,000.00$1,476.39$1,391.00$1,560.00$1,255.56$1,770.00
16Retaining wall (cast-in-place) (423-7016)SF20$130.00$212.97$642.00$225.00$181.12$295.00
17Riprap (concrete)(4 in) (432-7001)CY2.35$2,000.00$1,698.50$1,070.00$1,794.00$1,444.45$1,770.00
18Adjusting manholes (479-7001)EACH1$1,000.00$3,788.96$4,280.00$4,002.00$3,222.23$2,950.00
19Adjusting manholes (water valve box) (479-7007)EACH4$600.00$3,005.04$4,280.00$3,174.00$2,555.56$1,180.00
20Adjusting manholes (utility valve) (479-7009)EACH1$500.00$3,005.04$3,745.00$3,174.00$2,555.56$1,180.00
21Mobilization (500-7001)LS1$250,000$250,000$250,762$278,500$106,917$267,520$286,739
22Barricades, signs and traffic handling (502-7001)MO10$9,000.00$14,600$9,817.27$1.00$7,470.00$12,756$12,057
23Portable changeable message sign (503-7001)DAY72$175.00$100.00$385.01$268.00$46.30$61.12$70.80
24TMA (stationary) (505-7001)DAY180$225.00$145.00$371.93$268.00$359.00$212.97$218.30
25TMA (mobile operation) (505-7003)DAY20$225.00$500.00$607.38$642.00$359.00$400.00$763.12
26Biodegradable erosion control logs (install) (12") (506-7044)LF240$7.00$7.84$11.00$4.30$6.67$17.70
27Biodegradable erosion control logs (remove) (506-7046)LF240$1.00$2.61$1.00$0.90$2.23$1.18
28Concrete curb (type II) (529-7002)LF145$45.00$87.54$43.00$92.50$74.45$49.78
29Concrete curb & gutter (type II) (529-7009)LF474$55.00$96.68$64.00$102.00$82.23$60.26
30Concrete sidewalks (4") (531-7001)SY333$110.00$143.72$86.00$152.00$122.23$87.04
31Curb ramps (type 1) (531-7005)EACH1$2,500.00$4,050.27$3,210.00$4,278.00$3,444.45$2,950.00
32Curb ramps (type 2) (531-7006)EACH4$2,500.00$4,311.58$3,210.00$4,554.00$3,666.67$2,950.00
33Curb ramps (type 3) (531-7007)EACH2$2,700.00$4,050.27$3,210.00$4,278.00$3,444.45$3,186.00
34Curb ramps (type 5) (531-7008)EACH6$3,500.00$5,356.81$4,280.00$5,658.00$4,555.56$4,130.00
35Curb ramps (type 6) (531-7009)EACH2$2,500.00$4,834.19$3,424.00$5,106.00$4,111.12$2,950.00
36Curb ramps (type 7) (531-7010)EACH2$2,500.00$4,703.54$3,424.00$4,968.00$4,000.00$2,950.00
37Curb ramps (type 22) (531-7014)EACH2$3,900.00$6,271.39$4,815.00$6,625.00$5,333.34$4,602.00
38Concrete median (mono nose) (536-7006)SY8$170.00$653.27$268.00$690.00$555.56$271.14
39Conduit (PVC) (schedule 80) (2") (618-7054)LF445$30.00$18.16$21.40$19.70$37.74$14.34
40Conduit (PVC) (schedule 80) (2") (bore) (618-7055)LF365$45.00$34.38$37.45$34.50$40.32$30.36
41Conduit (PVC) (schedule 80) (3") (618-7060)LF550$30.00$18.79$26.00$22.90$38.30$18.23
42Conduit (PVC) (schedule 80) (3") (bore) (618-7061)LF2,390$45.00$30.61$54.00$41.40$45.58$27.53
43Conduit (PVC) (schedule 80) (4") (618-7064)LF250$30.00$18.51$32.00$25.10$40.85$25.41
44Conduit (PVC) (schedule 80) (4") (bore) (618-7065)LF1,565$45.00$25.23$59.00$48.30$53.12$32.57
45Conduit (prepare) (618-7090)LF250$5.00$1.00$2.48$5.35$3.60$5.07$2.93
46Electrical conductor (no.12) insulated (620-7004)LF640$1.50$0.77$4.30$2.10$1.47$1.59
47Electrical conductor (no.8) insulated (620-7008)LF2,440$1.91$1.40$3.20$2.60$1.99$2.30
48Electrical conductor (no.6) bare (620-7009)LF4,555$2.00$1.56$2.15$2.80$2.11$2.40
49Electrical conductor (no.6) insulated (620-7010)LF690$2.40$2.04$3.20$3.20$2.50$2.66
50Electrical conductor (no.4) bare (620-7011)LF240$2.80$2.26$4.30$3.60$2.88$3.81
51Electrical conductor (no.4) insulated (620-7012)LF480$2.80$2.91$4.30$3.70$3.01$4.07
52ITS GND box (poly) type 1 (243624)W/aprn (623-7014)EACH4$3,750.00$2,919.24$2,782.00$4,378.00$4,083.34$3,052.37
53Ground box type A (122311)W/apron (624-7002)EACH8$2,500.00$1,787.63$1,177.00$1,456.00$2,550.00$1,456.71
54Ground box type D (162922)W/apron (624-7008)EACH25$2,500.00$2,098.36$1,391.00$1,664.00$2,805.56$1,531.05
55Remove ground box (624-7013)EACH15$100.00$783.92$428.00$276.00$400.00$680.57
56Elc SRV type D 120/240 070(NS)SS(E)PS(U) (628-7190)EACH4$24,000$8,958.38$9,630.00$8,591.00$8,863.34$9,086.30
57Aluminum signs (type A) (636-7001)SF339.70$40.00$51.66$43.00$50.00$33.75$43.13
58Install small roadside sign support and assembly type 10BWG(1)SA(P) (644-7001)EACH1$1,500.00$966.13$856.00$997.00$622.46$855.50
59Install small roadside sign support and assembly type 10BWG(1)SA(T) (644-7004)EACH2$1,500.00$1,044.52$856.00$997.00$796.14$926.30
60Install small roadside sign support and assembly type 10BWG(1)SB(P) (644-7009)EACH1$1,500.00$960.31$856.00$997.00$672.98$867.30
61Install small roadside sign support and assembly type 10BWG(1)SB(T) (644-7012)EACH1$1,500.00$1,090.96$963.00$997.00$846.65$985.30
62Install small roadside sign support and assembly TYS80(1)SA(P) (644-7025)EACH1$1,500.00$1,284.93$910.00$997.00$766.64$1,143.42
63Remove SM RD SN sup&AM (644-7073)EACH5$100.00$129.35$214.00$353.00$125.00$116.82
64Reflectorized pavement marking type I (W)6"(DOT)(100MIL) (666-7009)LF112$1.75$3.27$21.40$3.50$3.39$2.95
65Reflectorized pavement marking type I (W)8"(DOT)(100MIL) (666-7018)LF32$2.35$3.92$21.40$4.10$3.62$2.95
66Reflectorized pavement marking type I (W)8"(solid)(100MIL) (666-7024)LF1,020$2.35$2.16$7.50$2.30$1.50$1.77
67Reflectorized pavement marking type I (W)18"(solid)(100MIL) (666-7033)LF398$5.25$6.86$6.40$7.30$8.89$6.20
68Reflectorized pavement marking type I (W)24"(solid)(100MIL) (666-7036)LF2,309$6.55$8.56$7.50$9.00$8.89$7.73
69Pavement sler 4" (666-7346)LF2,862$0.15$0.20$1.10$0.20$0.17$0.18
70Pavement sler 6" (666-7347)LF6,572$0.17$0.22$1.10$0.25$0.23$0.20
71Pavement sler 8" (666-7348)LF1,052$0.30$0.39$1.10$0.40$0.34$0.35
72Pavement sler 18" (666-7351)LF398$0.51$0.67$2.15$0.70$1.73$0.60
73Pavement sler 24" (666-7352)LF2,309$0.90$1.18$2.15$1.20$1.67$1.06
74Pavement sler (arrow) (666-7353)EACH33$15.00$19.60$21.40$20.70$32.23$17.70
75Pavement sler (word) (666-7354)EACH9$15.00$19.60$21.40$20.70$38.89$17.70
76Pavement sler (double arrow) (666-7356)EACH3$25.00$32.66$54.00$34.50$46.67$29.50
77Pavement sler (yld tri) (666-7365)EACH32$7.50$9.80$11.00$10.40$13.62$8.85
78Reflectorized pavement marking type I (W)4"(broken)(100MIL) (666-7402)LF1,122$0.75$1.24$2.15$1.00$0.82$0.89
79Reflectorized pavement marking type I (W)4"(solid)(100MIL) (666-7405)LF25$0.75$0.98$2.15$1.00$0.65$0.89
80Reflectorized pavement marking type I (W)6"(broken)(100MIL) (666-7408)LF570$1.10$1.44$2.15$1.50$1.02$1.30
81Reflectorized pavement marking type I (W)6"(solid)(100MIL) (666-7411)LF4,930$0.95$1.24$2.15$1.30$2.62$1.12
82Reflectorized pavement marking type I (Y)4"(solid)(100MIL) (666-7417)LF1,715$0.75$0.98$2.15$1.00$0.62$0.89
83Reflectorized pavement marking type I (Y)6"(solid)(100MIL) (666-7423)LF960$0.95$1.24$2.15$1.30$0.82$1.12
84Prefabricated PM type C (W)(arrow) (668-7091)EACH33$235.00$307.04$428.00$324.00$328.89$277.30
85Prefabricated PM type C (W)(double arrow) (668-7093)EACH3$385.00$503.02$428.00$531.00$494.45$454.30
86Prefabricated PM type C (W)(word) (668-7103)EACH9$255.00$333.17$321.00$352.00$416.67$300.90
87Prefabricated PM type C (W)(18")(yld tri) (668-7110)EACH22$29.50$38.54$37.50$40.70$111.12$34.81
88Prefabricated PM type C (W)(36")(yld tri) (668-7111)EACH10$35.00$45.73$43.00$48.30$111.12$41.30
89Reflectorized pavement marker type II-A-A (672-7004)EACH75$4.50$5.88$7.50$6.20$8.89$5.31
90Reflectorized pavement marker type II-C-R (672-7006)EACH786$3.75$4.90$5.35$5.20$7.78$4.43
91Eliminating existing PM & markers (4") (677-7001)LF2,915$0.55$0.72$2.15$0.80$1.28$0.65
92Eliminating existing PM & markers (6") (677-7002)LF5,843$0.55$0.72$2.15$0.80$1.28$0.65
93Eliminating existing PM & markers (8") (677-7004)LF1,050$0.75$0.98$2.15$1.00$1.28$0.89
94Eliminating existing PM & markers (12") (677-7006)LF654$1.50$1.96$2.15$2.10$3.39$1.77
95Eliminating existing PM & markers (18") (677-7007)LF274$2.65$3.46$4.30$3.70$3.39$3.13
96Eliminating existing PM & markers (24") (677-7008)LF979$3.00$3.92$4.30$4.10$6.78$3.54
97Eliminating existing PM & markers (arrow) (677-7009)EACH19$55.00$71.86$86.00$75.90$168.89$64.90
98Eliminating existing PM & markers (double arrow) (677-7010)EACH2$75.00$97.99$96.00$104.00$170.00$88.50
99Eliminating existing PM & markers (word) (677-7015)EACH8$55.00$71.86$86.00$75.90$168.89$64.90
100Pavement surface preparation for marking (4") (678-7001)LF2,862$0.05$0.07$0.50$0.10$0.03$0.06
101Pavement surface preparation for marking (6") (678-7002)LF6,572$0.05$0.07$0.50$0.10$0.03$0.06
102Pavement surface preparation for marking (8") (678-7004)LF1,052$0.05$0.07$0.50$0.10$0.08$0.06
103Pavement surface preparation for marking (18") (678-7007)LF398$0.15$0.20$0.50$0.20$0.60$0.18
104Pavement surface preparation for marking (24") (678-7008)LF2,309$0.20$0.26$0.50$0.30$0.60$0.24
105Pavement surface preparation for marking (arrow) (678-7009)EACH33$7.50$9.80$11.00$10.40$14.45$8.85
106Pavement surface preparation for marking (double arrow) (678-7010)EACH3$10.50$13.72$15.00$14.50$20.28$12.39
107Pavement surface preparation for marking (word) (678-7016)EACH9$7.50$9.80$11.00$10.40$16.95$8.85
108Pavement surface preparation for marking (18")(yld tri) (678-7022)EACH22$4.00$5.23$6.00$5.50$6.73$4.72
109Pavement surface preparation for marking (36")(yld tri) (678-7023)EACH10$5.00$6.53$8.00$6.90$6.67$5.90
110Pavement surface preparation for marking (RPM) (678-7033)EACH861$0.20$0.26$1.00$0.30$0.83$0.24
111Removing traffic signals (680-7004)EACH4$5,500.00$6,186.87$8,560.00$22,887$14,344$29,374
112Ins HY traffic signal (DPT sup CNT & cab)(iso) (680-7005)EACH4$25,000$11,400$21,400$30,159$24,528$30,927
113Vehicle signal section (12")LED(green) (682-7001)EACH489$300.00$280.00$274.01$332.00$392.00$300.00$272.88
114Vehicle signal section (12")LED(green arrow) (682-7002)EACH167$300.00$280.00$274.01$332.00$396.00$300.00$279.07
115Vehicle signal section (12")LED(yel) (682-7003)EACH552$300.00$280.00$274.09$332.00$396.00$300.00$272.88
116Vehicle signal section (12")LED(yel arrow) (682-7004)EACH126$300.00$280.00$273.13$342.00$396.00$300.00$279.07
117Vehicle signal section (12")LED(red) (682-7005)EACH552$300.00$280.00$274.08$332.00$396.00$300.00$272.88
118Vehicle signal section (12")LED(red arrow) (682-7006)EACH92$300.00$280.00$272.63$332.00$396.00$300.00$279.07
119Pedestrian signal section (LED)(countdown) (682-7018)EACH30$1,000.00$728.93$663.00$641.00$555.56$673.78
120Louver (12") (adjustable) (682-7035)EACH135$350.00$350.00$55.21$430.00$102.00$333.34$359.61
121Backplate W/reflectorized border(3 sec)aluminum (682-7039)EACH572$250.00$150.00$363.69$184.00$97.60$272.23$156.94
122Backplate W/reflectorized border(4 sec)aluminum (682-7040)EACH36$275.00$215.00$375.55$235.00$187.00$383.34$222.43
123Backplate W/reflectorized border(5 sec)aluminum (682-7041)EACH73$300.00$215.00$373.12$231.00$236.00$505.56$234.82
124Traffic signal CBL (type A)(14 AWG)(5 conductor) (684-7031)LF2,925$3.00$3.20$2.13$3.20$4.60$2.88$2.75
125Traffic signal CBL (type A)(14 AWG)(7 conductor) (684-7033)LF960$3.40$2.64$3.75$5.30$3.39$3.10
126Traffic signal CBL (type A)(14 AWG)(10 conductor) (684-7036)LF905$4.20$3.29$3.75$6.00$3.97$4.25
127Traffic signal CBL (type A)(14 AWG)(20 conductor) (684-7046)LF2,395$8.00$6.70$7.26$7.50$10.60$7.48$5.94
128Traffic signal CBL (type C)(12 AWG)(2 conductor) (684-7079)LF3,935$2.80$1.85$1.80$2.30$2.69$1.77
129Ins traffic signal PL AM(S)1 arm(32') (686-7033)EACH1$12,000$12,046$12,840$10,131$10,876$11,147
130Ins traffic signal PL AM(S)1 arm(32')lum (686-7035)EACH3$13,500$13,971$14,980$12,827$13,054$41,001
131Ins traffic signal PL AM(S)1 arm(36') (686-7037)EACH1$12,000$13,187$13,910$11,099$12,443$11,985
132Ins traffic signal PL AM(S)1 arm(36')lum (686-7039)EACH2$13,500$15,115$16,050$14,141$14,888$29,589
133Ins traffic signal PL AM(S)1 arm(48') (686-7049)EACH3$13,500$14,716$16,050$14,476$14,793$43,646
134Ins traffic signal PL AM(S)1 arm(48')lum (686-7051)EACH3$15,000$16,831$17,655$33,817$17,569$53,161
135Ins traffic signal PL AM(S)1 arm(65') (686-7065)EACH1$35,000$37,541$36,380$38,237$33,153$34,624
136Ins traffic signal PL AM(S)2 arm(65-44') (686-7277)EACH1$38,000$42,555$44,940$47,559$42,672$42,352
137Pedestrian pole assembly (687-7001)EACH8$2,050.00$3,820.37$2,675.00$1,897.00$3,700.00$2,743.50
138Pedestrian detect push button (APS) (688-7001)EACH30$850.00$846.74$1,605.00$1,131.00$808.89$987.66
139Pedestrian detector controller unit (688-7003)EACH4$5,000.00$4,007.05$5,029.00$4,764.00$3,942.23$3,999.32
140Stump removal (752-7004)EACH1$1,500.00$4,572.89$4,280.00$1,066.00$3,888.89$2,950.00
141RVDS (presence det)(install only) (6008-7004)EACH16$750.00$1,342.62$1,070.00$681.00$1,200.00$2,327.55
142RVDS (advance det)(install only) (6008-7005)EACH8$750.00$1,342.62$1,284.00$681.00$1,200.00$2,327.55
143Ground box (prepare) (6013-7006)EACH3$350.00$100.00$404.21$642.00$369.00$400.00$604.46
TxDOT contract A00193312: unit prices by line, the 6 lowest bidders (all in the CSV)

The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.

Source

Read from TxDOT's tabulation for this contract. TxDOT Bid Tabulations open-data export (data.texas.gov) from September 2024, read 21 November 2026, and TxDOT's legacy Tabulation of Bids pages for January 2020 to August 2024. The legacy pages are a large sample, not every contract: their file names were reused from year to year. Their district is the one TxDOT gives the county. Bids that did not match their published total are left out.

Every contract let that day: TxDOT letting of April 7, 2026. Compiled by Mirage Metrics.

Your own bid history, read the same way

Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.

We use your email to reply to you and, now and then, to tell you about Mirage. You can opt out at any time. Privacy policy