TxDOT contract A00193278 bid tabulation
Traffic Signal Improvements, IH 30 (at Cockrell Hill to in the City of Dallas). Let by Texas DOT on June 2, 2026, Dallas, Dallas District. 9 bids received; low bid $1,547,641 by Sice, Inc., -36% against the engineer's estimate of $2,403,467.
- Owner
- Texas DOT
- Letting
- 02 JUN 2026
- Pay items
- 121
- Data through
- 19 NOV 2026
Bidders
| Rank | Bidder | Total bid | Against the low bid | Against the estimate |
|---|---|---|---|---|
| 1 | Sice, Inc. | $1,547,641 | Low | -36% |
| 2 | Albatross Construction LLC | $1,922,000 | +24% | -20% |
| 3 | Highway Intelligent Traffic Solutions, Inc. | $1,937,419 | +25% | -19% |
| 4 | American Lighting and Signalization, LLC | $2,075,000 | +34% | -14% |
| 5 | Durable Specialties, Inc. | $2,112,750 | +37% | -12% |
| 6 | Yunex LLC | $2,137,748 | +38% | -11% |
| 7 | Elecnor Belco Electric, Inc. | $2,157,605 | +39% | -10% |
| 8 | WG Engineering & Construction, LLC | $2,232,056 | +44% | -7.0% |
| 9 | Select Maintenance, L.L.C. | $2,754,476 | +78% | +15% |
Engineer's estimate: $2,403,467.
Bid tabulation
| Line | Pay item | Unit | Quantity | Estimate | 1. Sice, Inc. | 2. Albatross Construction LLC | 3. Highway Intelligent Traffic Solutions, Inc. | 4. American Lighting and Signalization, LLC | 5. Durable Specialties, Inc. | 6. Yunex LLC |
|---|---|---|---|---|---|---|---|---|---|---|
| 1 | Removing concrete (sidewalk, ramp or shared use path) (104-7013) | SY | 376 | $75.00 | $55.06 | $55.13 | $53.10 | $65.00 | $50.00 | $47.90 |
| 2 | Removing concrete (curb) (104-7016) | LF | 333 | $30.00 | $22.02 | $22.05 | $21.24 | $26.00 | $20.00 | $19.20 |
| 3 | Furn & place topsoil (4") (160-7002) | SY | 21.40 | $10.65 | $183.75 | $118.00 | $5.00 | $30.00 | $215.00 | |
| 4 | Block sodding (162-7002) | SY | 21.40 | $42.82 | $183.75 | $46.39 | $18.00 | $115.00 | $227.70 | |
| 5 | Vegetative watering (168-7001) | TGL | 0.80 | $611.77 | $3,062.50 | $590.00 | $3.00 | $750.00 | $4.30 | |
| 6 | Drilled shaft (roadway illumination pole) (30 in) (416-7040) | LF | 12 | $375.00 | $285.04 | $264.58 | $455.48 | $300.00 | $610.00 | $867.00 |
| 7 | Drilled shaft (traffic signal pole) (30 in) (416-7043) | LF | 22 | $316.74 | $270.59 | $521.56 | $390.00 | $640.00 | $572.00 | |
| 8 | Drilled shaft (traffic signal pole) (36 in) (416-7044) | LF | 119 | $500.00 | $369.77 | $420.89 | $553.42 | $420.00 | $705.00 | $559.00 |
| 9 | Drilled shaft (traffic signal pole) (48 in) (416-7046) | LF | 66 | $750.00 | $551.06 | $622.80 | $625.40 | $863.00 | $815.00 | $911.00 |
| 10 | Mobilization (500-7001) | LS | 1 | $225,000 | $148,071 | $134,968 | $134,385 | $93,981 | $100,000 | $188,112 |
| 11 | Barricades, signs and traffic handling (502-7001) | MO | 5 | $7,500.00 | $5,501.30 | $24,500 | $9,241.34 | $2,160.00 | $10,000 | $7,006.00 |
| 12 | TMA (stationary) (505-7001) | DAY | 100 | $300.00 | $275.70 | $276.96 | $194.70 | $225.00 | $350.00 | $192.00 |
| 13 | Biodegradable erosion control logs (install) (18") (506-7045) | LF | 150 | $6.00 | $11.01 | $12.25 | $10.05 | $10.00 | $2.00 | $7.24 |
| 14 | Biodegradable erosion control logs (remove) (506-7046) | LF | 150 | $3.00 | $4.28 | $12.25 | $5.43 | $3.00 | $1.00 | $1.92 |
| 15 | Concrete curb (type II) (529-7002) | LF | 355 | $60.00 | $64.85 | $79.63 | $76.70 | $75.00 | $55.00 | $56.40 |
| 16 | Concrete curb (type C1) (529-7016) | LF | 36 | $140.71 | $91.88 | $88.50 | $165.00 | $125.00 | $122.40 | |
| 17 | Concrete sidewalks (4") (531-7001) | SY | 165.30 | $150.00 | $119.91 | $140.88 | $135.70 | $140.00 | $105.00 | $104.30 |
| 18 | Concrete sidewalks (6") (531-7003) | SY | 20.30 | $128.47 | $171.50 | $165.20 | $150.00 | $112.00 | $111.80 | |
| 19 | Curb ramps (type 1) (531-7005) | EACH | 14 | $3,000.00 | $3,181.19 | $3,920.00 | $3,776.00 | $3,700.00 | $2,800.00 | $2,766.00 |
| 20 | Curb ramps (type 2) (531-7006) | EACH | 2 | $4,000.00 | $3,425.90 | $4,655.00 | $4,484.00 | $4,000.00 | $3,000.00 | $2,978.80 |
| 21 | Curb ramps (type 5) (531-7008) | EACH | 3 | $5,261.20 | $5,145.00 | $4,956.00 | $6,200.00 | $4,700.00 | $4,574.50 | |
| 22 | Curb ramps (type 10) (531-7011) | EACH | 4 | $3,303.55 | $5,206.25 | $5,015.00 | $3,850.00 | $3,000.00 | $2,872.40 | |
| 23 | Curb ramps (type 21) (531-7013) | EACH | 7 | $5,750.62 | $5,206.25 | $5,015.00 | $6,750.00 | $5,200.00 | $5,000.00 | |
| 24 | Concrete median (536-7002) | SY | 11.70 | $318.12 | $165.38 | $159.30 | $374.00 | $285.00 | $276.60 | |
| 25 | Concrete directional island (536-7004) | SY | 56.50 | $232.47 | $165.38 | $159.30 | $274.00 | $210.00 | $202.20 | |
| 26 | In RD IL (type SA) 20T-4 (150W EQ) LED (610-7034) | EACH | 2 | $5,500.00 | $3,664.96 | $3,525.35 | $3,911.70 | $3,898.00 | $4,000.00 | $3,566.00 |
| 27 | Conduit (PVC) (schedule 80) (2") (618-7054) | LF | 740 | $20.00 | $13.10 | $11.10 | $13.45 | $25.00 | $26.00 | $31.00 |
| 28 | Conduit (PVC) (schedule 80) (2") (bore) (618-7055) | LF | 290 | $35.00 | $14.72 | $23.40 | $29.50 | $27.00 | $46.00 | $35.00 |
| 29 | Conduit (PVC) (schedule 80) (3") (618-7060) | LF | 3,300 | $32.00 | $16.54 | $13.61 | $21.95 | $27.00 | $27.00 | $32.00 |
| 30 | Conduit (PVC) (schedule 80) (3") (bore) (618-7061) | LF | 1,655 | $42.00 | $14.93 | $23.40 | $28.79 | $30.00 | $50.00 | $40.00 |
| 31 | Conduit (PVC) (schedule 80) (4") (618-7064) | LF | 1,725 | $40.00 | $17.20 | $17.81 | $23.72 | $30.00 | $28.00 | $34.00 |
| 32 | Conduit (PVC) (schedule 80) (4") (bore) (618-7065) | LF | 1,550 | $50.00 | $16.85 | $28.86 | $31.62 | $33.00 | $52.00 | $52.00 |
| 33 | Conduit (prepare) (618-7090) | LF | 1,070 | $5.00 | $1.58 | $7.69 | $2.83 | $3.00 | $1.00 | $5.00 |
| 34 | Electrical conductor (no.8) insulated (620-7008) | LF | 1,200 | $3.00 | $1.85 | $5.68 | $2.01 | $4.00 | $2.00 | $3.06 |
| 35 | Electrical conductor (no.6) bare (620-7009) | LF | 8,165 | $2.75 | $1.65 | $2.49 | $2.01 | $3.00 | $3.00 | $3.06 |
| 36 | Electrical conductor (no.6) insulated (620-7010) | LF | 8,340 | $3.25 | $2.01 | $2.49 | $2.36 | $4.00 | $3.00 | $3.68 |
| 37 | Electrical conductor (no.4) insulated (620-7012) | LF | 460 | $2.79 | $5.07 | $3.54 | $5.00 | $4.00 | $4.47 | |
| 38 | ITS GND box (poly) type 1 (243624)W/aprn (623-7014) | EACH | 3 | $5,000.00 | $2,381.35 | $3,461.44 | $3,125.82 | $4,000.00 | $4,000.00 | $3,969.00 |
| 39 | Ground box type A (122311)W/apron (624-7002) | EACH | 4 | $1,308.29 | $1,233.55 | $1,382.96 | $1,900.00 | $1,900.00 | $2,633.00 | |
| 40 | Ground box type D (162922)W/apron (624-7008) | EACH | 34 | $2,250.00 | $1,892.59 | $1,294.80 | $1,534.00 | $2,200.00 | $2,150.00 | $2,687.00 |
| 41 | Remove ground box (624-7013) | EACH | 30 | $400.00 | $305.88 | $322.47 | $463.74 | $456.00 | $315.00 | $336.00 |
| 42 | Elc SRV type D 120/240 070(NS)SS(E)PS(U) (628-7190) | EACH | 3 | $11,500 | $7,434.19 | $7,813.23 | $9,982.80 | $8,957.00 | $9,500.00 | $8,027.00 |
| 43 | Aluminum signs (type A) (636-7001) | SF | 769 | $50.00 | $28.85 | $54.94 | $52.92 | $45.00 | $40.00 | $33.30 |
| 44 | Replace existing aluminum signs(type A) (636-7004) | SF | 9 | $20.00 | $31.32 | $51.14 | $49.27 | $53.00 | $55.00 | $36.60 |
| 45 | Install small roadside sign support and assembly type 10BWG(1)SA(P) (644-7001) | EACH | 1 | $855.25 | $856.28 | $824.82 | $1,600.00 | $900.00 | $926.70 | |
| 46 | Install small roadside sign support and assembly type 10BWG(1)SA(T) (644-7004) | EACH | 6 | $1,250.00 | $1,009.42 | $1,010.63 | $973.50 | $1,600.00 | $900.00 | $1,133.00 |
| 47 | Install small roadside sign support and assembly TYS80(1)SA(T) (644-7028) | EACH | 1 | $1,566.13 | $1,568.00 | $1,510.40 | $1,600.00 | $900.00 | $1,406.00 | |
| 48 | Install small roadside sign support and assembly TYS80(1)SA(U) (644-7031) | EACH | 1 | $1,829.19 | $1,831.38 | $1,764.10 | $1,600.00 | $900.00 | $1,440.50 | |
| 49 | Relocate SM RD SN sup&AM type 10BWG (644-7065) | EACH | 1 | $740.24 | $741.13 | $713.90 | $550.00 | $650.00 | $622.50 | |
| 50 | Remove SM RD SN sup&AM (644-7073) | EACH | 9 | $250.00 | $121.13 | $121.28 | $116.82 | $410.00 | $75.00 | $191.50 |
| 51 | Remove SM RD SN sup&AM (sign only) (644-7075) | EACH | 1 | $100.00 | $42.82 | $42.88 | $41.30 | $45.00 | $50.00 | $143.70 |
| 52 | Reflectorized pavement marking type I (W)8"(DOT)(100MIL) (666-7018) | LF | 98 | $1.25 | $3.06 | $3.06 | $1.65 | $4.00 | $1.50 | $2.13 |
| 53 | Reflectorized pavement marking type I (W)8"(solid)(100MIL) (666-7024) | LF | 3,753 | $1.50 | $1.53 | $1.53 | $1.65 | $2.00 | $1.50 | $1.06 |
| 54 | Reflectorized pavement marking type I (W)12"(solid)(100MIL) (666-7030) | LF | 33 | $3.00 | $4.90 | $4.90 | $4.37 | $6.00 | $4.00 | $4.42 |
| 55 | Reflectorized pavement marking type I (W)24"(solid)(100MIL) (666-7036) | LF | 2,727 | $7.50 | $8.87 | $8.88 | $8.73 | $10.00 | $8.00 | $7.93 |
| 56 | Reflectorized pavement marking type I (W)(arrow)(100MIL) (666-7042) | EACH | 36 | $300.00 | $220.24 | $220.50 | $188.80 | $259.00 | $175.00 | $155.32 |
| 57 | Reflectorized pavement marking type I(W)(double arrow)(100MIL) (666-7045) | EACH | 7 | $500.00 | $440.47 | $441.00 | $377.60 | $518.00 | $350.00 | $221.28 |
| 58 | Reflectorized pavement marking type I(W)(uturn arrow)(100MIL) (666-7051) | EACH | 1 | $520.00 | $520.63 | $448.40 | $612.00 | $420.00 | $226.60 | |
| 59 | Reflectorized pavement marking type I (W)(word)(100MIL) (666-7066) | EACH | 28 | $300.00 | $256.94 | $257.25 | $194.70 | $302.00 | $180.00 | $186.18 |
| 60 | Ref pavement marking type I(W)18"(yld tri)(100MIL) (666-7087) | EACH | 105 | $40.00 | $30.59 | $30.63 | $41.30 | $36.00 | $40.00 | $65.96 |
| 61 | Reflectorized pavement marking type I (Y)12"(solid)(100MIL) (666-7117) | LF | 267 | $40.00 | $4.90 | $4.90 | $4.37 | $6.00 | $4.00 | $4.42 |
| 62 | Pavement sler 6" (666-7347) | LF | 10,429 | $0.50 | $0.25 | $0.25 | $0.18 | $0.30 | $0.25 | $0.22 |
| 63 | Pavement sler 8" (666-7348) | LF | 3,851 | $0.75 | $0.28 | $0.28 | $0.24 | $0.30 | $0.25 | $0.32 |
| 64 | Pavement sler 12" (666-7350) | LF | 300 | $1.25 | $0.49 | $0.49 | $1.18 | $0.60 | $1.00 | $0.92 |
| 65 | Pavement sler 24" (666-7352) | LF | 2,727 | $2.25 | $0.98 | $0.98 | $2.36 | $1.00 | $2.00 | $1.65 |
| 66 | Pavement sler (arrow) (666-7353) | EACH | 36 | $55.00 | $18.35 | $18.38 | $17.70 | $22.00 | $16.00 | $30.86 |
| 67 | Pavement sler (word) (666-7354) | EACH | 28 | $50.00 | $18.35 | $18.38 | $23.60 | $22.00 | $22.00 | $37.24 |
| 68 | Pavement sler (double arrow) (666-7356) | EACH | 7 | $65.00 | $24.47 | $24.50 | $35.40 | $29.00 | $33.00 | $44.69 |
| 69 | Pavement sler (uturn arrow) (666-7358) | EACH | 1 | $24.47 | $24.50 | $88.50 | $29.00 | $83.00 | $45.75 | |
| 70 | Pavement sler (yld tri) (666-7365) | EACH | 105 | $35.00 | $6.12 | $6.13 | $4.72 | $7.00 | $4.00 | $13.04 |
| 71 | Reflectorized pavement marking type I (W)6"(broken)(100MIL) (666-7408) | LF | 2,010 | $1.00 | $1.47 | $1.47 | $1.24 | $2.00 | $1.00 | $0.78 |
| 72 | Reflectorized pavement marking type I (W)6"(solid)(100MIL) (666-7411) | LF | 5,244 | $1.00 | $1.02 | $1.02 | $1.24 | $1.00 | $1.00 | $0.70 |
| 73 | Reflectorized pavement marking type I (Y)6"(solid)(100MIL) (666-7423) | LF | 3,175 | $1.00 | $1.02 | $1.02 | $1.24 | $1.00 | $1.00 | $0.70 |
| 74 | Reflectorized pavement marker type II-C-R (672-7006) | EACH | 291 | $7.50 | $5.20 | $5.21 | $4.72 | $6.00 | $4.00 | $4.79 |
| 75 | Eliminating existing PM & markers (6") (677-7002) | LF | 306 | $0.80 | $0.80 | $1.18 | $0.90 | $1.00 | $0.42 | |
| 76 | Eliminating existing PM & markers (8") (677-7004) | LF | 42 | $1.00 | $1.22 | $1.23 | $1.65 | $1.00 | $1.50 | $0.87 |
| 77 | Eliminating existing PM & markers (12") (677-7006) | LF | 1,109 | $2.00 | $1.84 | $1.84 | $2.36 | $2.00 | $2.00 | $1.97 |
| 78 | Eliminating existing PM & markers (24") (677-7008) | LF | 1,075 | $5.00 | $3.67 | $3.68 | $4.72 | $4.00 | $4.00 | $3.25 |
| 79 | Eliminating existing PM & markers (arrow) (677-7009) | EACH | 33 | $50.00 | $67.30 | $67.38 | $47.20 | $79.00 | $45.00 | $45.75 |
| 80 | Eliminating existing PM & markers (double arrow) (677-7010) | EACH | 7 | $75.00 | $91.77 | $91.88 | $88.50 | $108.00 | $83.00 | $64.90 |
| 81 | Eliminating existing PM & markers (uturn arrow) (677-7012) | EACH | 1 | $91.77 | $91.88 | $212.40 | $108.00 | $200.00 | $81.92 | |
| 82 | Eliminating existing PM & markers (word) (677-7015) | EACH | 20 | $100.00 | $67.30 | $67.38 | $53.10 | $79.00 | $50.00 | $54.26 |
| 83 | Eliminating existing PM & markers (18")(yld tri) (677-7023) | EACH | 39 | $9.24 | $9.25 | $17.70 | $11.00 | $16.00 | $27.66 | |
| 84 | Pavement surface preparation for marking (6") (678-7002) | LF | 757 | $0.50 | $0.09 | $0.09 | $0.08 | $0.10 | $0.10 | $0.03 |
| 85 | Pavement surface preparation for marking (8") (678-7004) | LF | 98 | $0.50 | $0.12 | $0.12 | $0.12 | $0.10 | $0.20 | $0.07 |
| 86 | Pavement surface preparation for marking (12") (678-7006) | LF | 145 | $0.75 | $0.17 | $0.17 | $0.35 | $0.20 | $0.50 | $0.33 |
| 87 | Pavement surface preparation for marking (24") (678-7008) | LF | 2,195 | $1.25 | $0.34 | $0.34 | $0.71 | $0.40 | $1.00 | $0.58 |
| 88 | Pavement surface preparation for marking (arrow) (678-7009) | EACH | 36 | $50.00 | $12.24 | $12.25 | $11.80 | $14.00 | $11.00 | $13.83 |
| 89 | Pavement surface preparation for marking (double arrow) (678-7010) | EACH | 7 | $75.00 | $18.35 | $18.38 | $23.60 | $22.00 | $22.00 | $19.42 |
| 90 | Pavement surface preparation for marking (uturn arr) (678-7012) | EACH | 1 | $18.35 | $18.38 | $41.30 | $22.00 | $40.00 | $19.42 | |
| 91 | Pavement surface preparation for marking (word) (678-7016) | EACH | 28 | $30.00 | $12.24 | $12.25 | $17.70 | $14.00 | $16.00 | $16.23 |
| 92 | Pavement surface preparation for marking (18")(yld tri) (678-7022) | EACH | 105 | $20.00 | $3.67 | $3.68 | $2.36 | $4.00 | $3.00 | $6.49 |
| 93 | Ins HY traffic signal (DPT sup CNT & cab)(iso) (680-7005) | EACH | 3 | $40,000 | $8,271.17 | $13,434 | $25,300 | $28,250 | $24,000 | $37,691 |
| 94 | Removing traffic signals (diamond) (680-7012) | EACH | 3 | $20,000 | $10,230 | $8,861.90 | $18,443 | $11,500 | $5,000.00 | $22,898 |
| 95 | Vehicle signal section (12")LED(green) (682-7001) | EACH | 37 | $400.00 | $234.51 | $382.72 | $284.38 | $385.00 | $600.00 | $272.00 |
| 96 | Vehicle signal section (12")LED(green arrow) (682-7002) | EACH | 22 | $400.00 | $234.32 | $382.72 | $284.38 | $385.00 | $600.00 | $272.00 |
| 97 | Vehicle signal section (12")LED(yel) (682-7003) | EACH | 52 | $400.00 | $234.34 | $382.72 | $284.38 | $385.00 | $600.00 | $272.00 |
| 98 | Vehicle signal section (12")LED(yel arrow) (682-7004) | EACH | 14 | $400.00 | $235.16 | $382.72 | $284.38 | $385.00 | $600.00 | $272.00 |
| 99 | Vehicle signal section (12")LED(red) (682-7005) | EACH | 54 | $400.00 | $234.41 | $382.72 | $284.38 | $385.00 | $600.00 | $272.00 |
| 100 | Vehicle signal section (12")LED(red arrow) (682-7006) | EACH | 10 | $400.00 | $234.79 | $382.72 | $284.38 | $385.00 | $600.00 | $272.00 |
| 101 | Pedestrian signal section (LED)(countdown) (682-7018) | EACH | 44 | $750.00 | $536.76 | $744.87 | $778.80 | $728.00 | $1,000.00 | $532.00 |
| 102 | Backplate W/reflectorized border(3 sec)aluminum (682-7039) | EACH | 52 | $250.00 | $172.41 | $303.09 | $214.76 | $252.00 | $155.00 | $155.00 |
| 103 | Backplate W/reflectorized border(4 sec)aluminum (682-7040) | EACH | 2 | $242.39 | $370.47 | $227.74 | $324.00 | $175.00 | $213.00 | |
| 104 | Backplate W/reflectorized border(5 sec)aluminum (682-7041) | EACH | 5 | $400.00 | $252.63 | $382.72 | $245.44 | $338.00 | $185.00 | $224.00 |
| 105 | Traffic signal CBL (type A)(14 AWG)(5 conductor) (684-7031) | LF | 2,327 | $3.00 | $1.57 | $3.65 | $2.95 | $5.00 | $3.00 | $3.00 |
| 106 | Traffic signal CBL (type A)(14 AWG)(7 conductor) (684-7033) | LF | 12,426 | $4.00 | $1.97 | $3.28 | $3.54 | $5.00 | $3.00 | $3.55 |
| 107 | Traffic signal CBL (type A)(14 AWG)(20 conductor) (684-7046) | LF | 6,055 | $7.50 | $5.28 | $7.57 | $6.14 | $10.00 | $8.00 | $7.83 |
| 108 | Traffic signal CBL (type C)(12 AWG)(2 conductor) (684-7079) | LF | 15,130 | $4.00 | $1.51 | $2.43 | $2.01 | $4.00 | $3.00 | $2.70 |
| 109 | Ins traffic signal PL AM(S)1 arm(32') (686-7033) | EACH | 2 | $11,347 | $10,872 | $13,690 | $13,400 | $13,200 | $9,965.00 | |
| 110 | Ins traffic signal PL AM(S)1 arm(36')lum (686-7039) | EACH | 2 | $14,457 | $14,564 | $16,708 | $16,800 | $16,400 | $13,938 | |
| 111 | Ins traffic signal PL AM(S)1 arm(44')lum (686-7047) | EACH | 2 | $15,582 | $15,849 | $17,831 | $18,500 | $17,700 | $14,599 | |
| 112 | Ins traffic signal PL AM(S)1 arm(48')lum (686-7051) | EACH | 4 | $16,238 | $18,198 | $18,377 | $28,500 | $18,400 | $16,640 | |
| 113 | Ins traffic signal PL AM(S)1 arm(55')lum (686-7059) | EACH | 2 | $33,048 | $38,475 | $33,387 | $40,250 | $38,000 | $33,639 | |
| 114 | Ins traffic signal PL AM(S)1 arm(60')lum (686-7063) | EACH | 1 | $35,000 | $33,750 | $38,958 | $34,038 | $41,000 | $39,000 | $34,058 |
| 115 | Ins traffic signal PL AM(S)2 arm(44-36')lum (686-7167) | EACH | 1 | $30,000 | $22,456 | $24,213 | $22,276 | $27,900 | $28,000 | $22,190 |
| 116 | Pedestrian pole assembly (687-7001) | EACH | 26 | $3,000.00 | $2,321.27 | $3,390.68 | $2,827.28 | $1,850.00 | $4,800.00 | $3,741.00 |
| 117 | Pedestrian detect push button (APS) (688-7001) | EACH | 40 | $1,300.00 | $726.73 | $1,196.97 | $1,157.58 | $1,100.00 | $1,000.00 | $831.00 |
| 118 | Pedestrian detector controller unit (688-7003) | EACH | 6 | $5,000.00 | $3,536.60 | $4,623.44 | $4,974.88 | $5,200.00 | $4,000.00 | $3,775.00 |
| 119 | RVDS (presence det)(install only) (6008-7004) | EACH | 6 | $2,000.00 | $592.93 | $1,474.51 | $2,545.26 | $1,000.00 | $1,450.00 | $1,479.00 |
| 120 | RVDS (pres and adv)(install only) (6008-7006) | EACH | 12 | $2,250.00 | $592.93 | $1,474.51 | $2,545.26 | $1,000.00 | $1,450.00 | $1,800.00 |
| 121 | Ground box (prepare) (6013-7006) | EACH | 10 | $500.00 | $244.71 | $462.51 | $612.42 | $300.00 | $250.00 | $490.00 |
The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.
Source
Read from TxDOT's tabulation for this contract. TxDOT Bid Tabulations open-data export (data.texas.gov) from September 2024, read 21 November 2026, and TxDOT's legacy Tabulation of Bids pages for January 2020 to August 2024. The legacy pages are a large sample, not every contract: their file names were reused from year to year. Their district is the one TxDOT gives the county. Bids that did not match their published total are left out.
Every contract let that day: TxDOT letting of June 2, 2026. Compiled by Mirage Metrics.