TxDOT contract A00193451 bid tabulation

Install Traffic Signal, US 380 (at THOMAS J EGAN RD to in the City of Denton). Let by Texas DOT on October 9, 2025, Denton, Dallas District. 6 bids received; low bid $3,127,471 by Sice, Inc., -15% against the engineer's estimate of $3,685,758.

Owner
Texas DOT
Letting
09 OCT 2025
Pay items
104
Data through
19 NOV 2026

Bidders

RankBidderTotal bidAgainst the low bidAgainst the estimate
1Sice, Inc.$3,127,471Low-15%
2O. Trevino Construction, LLC$3,338,283+7.0%-9.0%
3Durable Specialties, Inc.$3,552,254+14%-4.0%
4Grey Sky Construction LLC$3,562,975+14%-3.0%
5American Lighting and Signalization, LLC$3,674,955+18%0.0%
6Yunex LLC$3,819,479+22%+4.0%
TxDOT contract A00193451: bids by rank

Engineer's estimate: $3,685,758.

Bid tabulation

LinePay itemUnitQuantityEstimate1. Sice, Inc.2. O. Trevino Construction, LLC3. Durable Specialties, Inc.4. Grey Sky Construction LLC5. American Lighting and Signalization, LLC6. Yunex LLC
1Removing concrete (pavement) (104-7001)SY444$30.67$90.00$55.00$20.00$74.00$57.00
2Removing concrete (medians) (104-7008)SY21$30.67$119.00$88.00$20.00$169.00$283.00
3Removing concrete (sidewalk, ramp or shared use path) (104-7013)SY147$100.00$30.67$79.00$88.00$20.00$169.00$57.00
4Removing concrete (curb & gutter) (104-7017)LF846$50.00$19.17$26.00$28.00$20.00$37.00$29.00
5Remove (4"-8") TRT/untrt base & asphalt pavement (105-7004)SY339$30.67$59.00$50.00$20.00$66.00$68.00
6Excavation (roadway) (110-7001)CY82$30.67$99.00$66.00$20.00$88.00$68.00
7Block sodding (162-7002)SY215$25.00$5.05$11.09$30.00$20.00$56.00$12.00
8Vegetative watering (168-7001)TGL7.53$250.00$31.55$379.35$200.00$50.00$3.00$12.00
9FL BS(compacted in place)(type A,B or D GR4)(10") (247-7111)SY200$63.90$83.00$99.00$30.00$132.00$102.00
10Concrete pavement (CRCP)(fast TRK) (12") (360-7076)SY200$287.56$230.00$231.00$200.00$441.00$238.00
11Drilled shaft (traffic signal pole) (30 in) (416-7043)LF55$566.10$315.26$885.00$385.00$425.00$802.00
12Drilled shaft (traffic signal pole) (36 in) (416-7044)LF91$689.82$342.96$940.00$450.00$534.00$747.00
13Drilled shaft (traffic signal pole) (48 in) (416-7046)LF176$950.00$809.44$778.46$1,205.00$650.00$831.00$848.00
14Riprap (concrete)(4 in) (432-7001)CY295$702.92$1,100.00$605.00$550.00$809.00$735.00
15Mobilization (500-7001)LS1$300,000$314,141$330,000$325,000$360,000$190,000$673,001
16Barricades, signs and traffic handling (502-7001)MO6$13,000$13,290$15,015$18,000$12,500$9,500.00$9,161.00
17Portable changeable message sign (503-7002)EACH10$200.00$15,201$20,000$75.00$20,000$47.00$20,758
18TMA (stationary) (505-7001)DAY120$300.00$309.34$180.00$250.00$250.00$308.00$217.00
19Biodegradable erosion control logs (install) (18") (506-7045)LF200$9.00$6.22$7.15$2.00$12.00$15.00$8.00
20Biodegradable erosion control logs (remove) (506-7046)LF200$5.00$0.63$1.59$1.00$9.00$1.70$2.00
21Colored textured concrete (6") (527-7003)SY14$786.00$470.00$242.00$150.00$324.00$255.00
22Concrete curb & gutter (type II) (529-7009)LF2,539$100.00$47.29$98.00$58.00$65.00$96.00$59.88
23Concrete sidewalks (4") (531-7001)SY878$175.00$104.80$156.00$110.00$65.00$191.00$113.00
24Curb ramps (type 2) (531-7006)EACH1$3,067.30$3,030.00$4,180.00$3,250.00$5,600.00$5,649.00
25Curb ramps (type 5) (531-7008)EACH1$4,500.00$3,067.30$2,650.00$5,390.00$3,250.00$7,000.00$6,778.00
26Curb ramps (type 7) (531-7010)EACH31$4,500.00$2,811.70$2,810.00$3,960.00$3,250.00$5,600.00$5,649.00
27Curb ramps (type 22) (531-7014)EACH6$4,217.54$10,250$5,280.00$3,250.00$7,000.00$5,649.00
28Conduit (PVC) (schedule 80) (2") (618-7054)LF120$30.00$28.14$20.62$32.00$25.00$35.00$38.06
29Conduit (PVC) (schedule 80) (3") (618-7060)LF1,150$35.00$36.13$24.40$34.00$35.00$38.00$35.25
30Conduit (PVC) (schedule 80) (4") (618-7064)LF1,290$40.00$31.14$25.37$36.00$40.00$41.00$40.97
31Conduit (PVC) (schedule 80) (4") (bore) (618-7065)LF2,245$50.00$54.60$38.43$76.00$60.00$59.00$61.95
32Electrical conductor (no.12) insulated (620-7004)LF4,340$3.00$1.19$2.54$2.00$3.00$4.50$2.88
33Electrical conductor (no.8) insulated (620-7008)LF12,790$3.50$1.66$3.29$3.00$3.00$5.80$3.53
34Electrical conductor (no.6) bare (620-7009)LF4,600$4.00$1.74$3.31$4.00$3.00$5.80$3.53
35Electrical conductor (no.6) insulated (620-7010)LF140$4.00$2.37$4.00$4.00$3.00$6.30$3.99
36Ground box type D (162922)W/apron (624-7008)EACH38$2,400.00$2,265.56$1,761.25$2,900.00$1,150.00$2,700.00$3,293.00
37Elc SRV type D 120/240 060(NS)SS(E)PS(U) (628-7147)EACH4$12,000$8,186.83$15,674$12,000$12,500$11,000$10,470
38Aluminum signs (type A) (636-7001)SF190$80.00$105.00$37.82$65.00$50.00$58.00$50.00
39Install small roadside sign support and assembly type 10BWG(1)SA(P) (644-7001)EACH8$653.87$712.88$1,100.00$1,150.00$947.00$814.00
40Install small roadside sign support and assembly TYS80(1)SA(U) (644-7031)EACH3$1,141.12$1,272.31$1,100.00$1,150.00$1,094.00$1,195.00
41Install small roadside sign support and assembly (inst sign only) (644-7064)EACH2$167.12$43.27$350.00$1,150.00$218.00$445.00
42Remove SM RD SN sup&AM (644-7073)EACH29$300.00$167.12$85.98$250.00$500.00$653.00$167.00
43Remove SM RD SN sup&AM (sign only) (644-7075)EACH11$200.00$167.12$27.21$75.00$500.00$163.00$167.00
44Reflectorized pavement marking type I (W)8"(solid)(100MIL) (666-7024)LF1,499$3.00$1.98$1.82$2.00$6.00$3.70$1.36
45Reflectorized pavement marking type I (W)24"(solid)(100MIL) (666-7036)LF2,517$12.00$7.67$8.81$15.00$12.00$11.00$8.65
46Reflectorized pavement marking type I (W)(arrow)(100MIL) (666-7042)EACH13$350.00$253.05$212.61$176.00$250.00$368.00$191.00
47Reflectorized pavement marking type I (W)(word)(100MIL) (666-7066)EACH13$400.00$287.56$253.37$182.00$250.00$404.00$235.00
48Reflectorized pavement marking type I (Y)18"(solid)(100MIL) (666-7120)LF178$6.39$5.51$9.00$12.00$5.90$8.00
49RE PV marking type I(black)6"(shadow)(100MIL) (666-7138)LF1,500$1.50$1.60$3.30$8.00$3.00$15.00$2.43
50Pavement sler 6" (666-7347)LF9,353$2.00$0.26$0.55$0.20$3.00$0.37$0.23
51Pavement sler 8" (666-7348)LF1,579$2.00$0.26$0.74$0.20$6.00$0.60$0.34
52Pavement sler 18" (666-7351)LF178$0.64$1.65$2.00$12.00$2.20$1.76
53Pavement sler 24" (666-7352)LF2,517$4.00$1.28$2.20$2.00$12.00$5.90$1.76
54Pavement sler (arrow) (666-7353)EACH13$100.00$21.73$49.57$17.00$250.00$44.00$33.00
55Pavement sler (word) (666-7354)EACH13$125.00$21.73$60.59$22.00$250.00$66.00$40.00
56Reflectorized pavement marking type I (W)6"(solid)(100MIL) (666-7411)LF4,892$1.50$1.09$1.87$1.00$3.00$2.90$0.91
57Reflectorized pavement marking type I (Y)6"(solid)(100MIL) (666-7423)LF3,062$2.50$1.09$1.87$1.00$3.00$2.90$0.91
58Reflectorized pavement marker type I-C (672-7002)EACH51$5.43$7.71$5.00$6.00$8.80$8.00
59Reflectorized pavement marker type II-A-A (672-7004)EACH58$10.00$5.43$7.71$5.00$6.00$9.60$8.00
60Reflectorized pavement marker type II-C-R (672-7006)EACH98$8.00$5.43$7.71$5.00$6.00$9.60$8.00
61Eliminating existing PM & markers (6") (677-7002)LF7,840$2.00$0.68$0.80$1.00$3.00$1.80$1.13
62Eliminating existing PM & markers (8") (677-7004)LF2,583$3.00$0.81$1.10$2.00$5.00$2.90$1.42
63Eliminating existing PM & markers (18") (677-7007)LF192$3.20$4.41$4.00$12.00$4.40$6.00
64Eliminating existing PM & markers (24") (677-7008)LF558$6.00$3.84$4.41$5.00$12.00$7.40$12.00
65Eliminating existing PM & markers (arrow) (677-7009)EACH8$120.00$63.90$110.16$44.00$250.00$147.00$113.00
66Eliminating existing PM & markers (double arrow) (677-7010)EACH2$95.85$176.26$83.00$500.00$221.00$170.00
67Eliminating existing PM & markers (word) (677-7015)EACH6$125.00$63.90$126.68$50.00$250.00$184.00$113.00
68Eliminating existing PM & markers (36")(yld tri) (677-7024)EACH23$12.78$66.10$11.00$50.00$74.00$80.00
69Pavement surface preparation for marking (6") (678-7002)LF9,353$0.50$0.09$0.22$0.10$3.00$0.50$0.03
70Pavement surface preparation for marking (8") (678-7004)LF1,579$0.75$0.09$0.30$0.10$6.00$1.00$0.08
71Pavement surface preparation for marking (18") (678-7007)LF178$0.27$1.10$0.50$12.00$1.50$0.45
72Pavement surface preparation for marking (24") (678-7008)LF2,517$2.00$0.38$3.30$1.00$12.00$5.90$0.61
73Pavement surface preparation for marking (arrow) (678-7009)EACH13$70.00$12.78$55.08$11.00$250.00$66.00$15.00
74Pavement surface preparation for marking (word) (678-7016)EACH13$75.00$12.78$60.59$17.00$250.00$88.00$18.00
75Pavement surface preparation for marking (RPM) (678-7033)EACH207$2.50$0.96$1.10$0.10$50.00$2.20$1.00
76Ins HY traffic signal (DPT sup CNT & cab)(iso) (680-7005)EACH4$50,000$34,680$26,018$40,000$50,000$40,000$47,466
77Vehicle signal section (12")LED(green) (682-7001)EACH35$450.00$413.32$334.93$800.00$350.00$469.00$403.00
78Vehicle signal section (12")LED(green arrow) (682-7002)EACH20$450.00$409.38$342.37$800.00$350.00$469.00$403.00
79Vehicle signal section (12")LED(yel) (682-7003)EACH43$450.00$410.67$334.92$800.00$350.00$469.00$403.00
80Vehicle signal section (12")LED(yel arrow) (682-7004)EACH20$450.00$413.88$342.37$800.00$350.00$469.00$403.00
81Vehicle signal section (12")LED(red) (682-7005)EACH43$450.00$410.67$334.92$800.00$350.00$469.00$403.00
82Vehicle signal section (12")LED(red arrow) (682-7006)EACH10$450.00$413.88$342.37$800.00$350.00$469.00$403.00
83Pedestrian signal section (LED)(countdown) (682-7018)EACH40$950.00$915.07$897.00$1,400.00$2,500.00$956.00$934.00
84Backplate W/ref border(3 sec)(vent)aluminum (682-7042)EACH41$300.00$720.80$242.57$250.00$250.00$285.00$277.00
85Backplate W/ref border(4 sec)(vent)aluminum (682-7043)EACH12$350.00$810.39$326.20$300.00$350.00$344.00$337.00
86Traffic signal CBL (type A)(14 AWG)(5 conductor) (684-7031)LF2,330$3.50$5.62$3.58$3.00$3.00$5.50$3.66
87Traffic signal CBL (type A)(14 AWG)(7 conductor) (684-7033)LF825$3.75$5.76$3.58$3.00$3.00$6.00$4.05
88Traffic signal CBL (type A)(14 AWG)(10 conductor) (684-7036)LF7,070$6.00$6.11$4.42$6.00$3.00$7.50$5.42
89Traffic signal CBL (type A)(14 AWG)(20 conductor) (684-7046)LF5,780$8.00$8.76$8.19$10.00$6.00$12.00$8.27
90Traffic signal CBL (type C)(12 AWG)(2 conductor) (684-7079)LF12,065$3.25$4.73$2.44$2.00$6.00$5.50$3.47
91Ins traffic signal PL AM(S)1 arm(28')lum&ilsn (686-7032)EACH1$18,378$16,255$16,600$16,500$17,200$15,607
92Ins traffic signal PL AM(S)1 arm(32')lum&ilsn (686-7036)EACH4$19,018$17,693$17,900$20,000$17,936$16,695
93Ins traffic signal PL AM(S)1 arm(36')lum&ilsn (686-7040)EACH5$20,410$19,034$19,200$22,500$20,878$17,709
94Ins traffic signal PL AM(S)1 arm(44')lum&ilsn (686-7048)EACH1$21,819$21,115$20,100$25,000$26,026$19,284
95Ins traffic signal PL AM(S)1 arm(48')lum&ilsn (686-7052)EACH1$21,836$22,353$22,600$26,500$29,253$21,109
96Ins traffic signal PL AM(S)1 arm(50')lum&ilsn (686-7056)EACH2$39,772$39,019$45,800$50,000$43,226$32,723
97Ins traffic signal PL AM(S)1 arm(55')lum&ilsn (686-7060)EACH1$50,000$41,189$40,264$47,400$50,000$44,697$35,441
98Ins traffic signal PL AM(S)1 arm(60')lum&ilsn (686-7064)EACH3$51,500$41,954$41,412$47,900$50,000$46,791$37,199
99Ins traffic signal PL AM(S)1 arm(65')lum&ilsn (686-7068)EACH2$53,000$43,018$42,167$48,400$50,000$49,733$37,770
100Pedestrian pole assembly (687-7001)EACH25$3,500.00$1,675.27$1,773.10$6,575.00$2,500.00$3,188.00$4,637.00
101Pedestrian detect push button (APS) (688-7001)EACH40$1,500.00$1,710.83$1,081.46$1,250.00$1,850.00$1,625.00$1,058.00
102Pedestrian detector controller unit (688-7003)EACH6$5,000.00$4,124.36$4,174.27$6,100.00$8,500.00$4,891.00$4,521.00
103VIVDS cam assy (install only) (6006-7010)EACH7$1,800.00$887.18$722.03$2,200.00$3,500.00$2,205.00$1,333.00
104VIVDS cabling (install only) (6006-7012)LF2,105$3.00$4.78$0.87$2.00$3.00$7.40$4.00
TxDOT contract A00193451: unit prices by line

The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.

Source

Read from TxDOT's tabulation for this contract. TxDOT Bid Tabulations open-data export (data.texas.gov) from September 2024, read 21 November 2026, and TxDOT's legacy Tabulation of Bids pages for January 2020 to August 2024. The legacy pages are a large sample, not every contract: their file names were reused from year to year. Their district is the one TxDOT gives the county. Bids that did not match their published total are left out.

Every contract let that day: TxDOT letting of October 9, 2025. Compiled by Mirage Metrics.

Your own bid history, read the same way

Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.

We use your email to reply to you and, now and then, to tell you about Mirage. You can opt out at any time. Privacy policy