TxDOT contract A00193765 bid tabulation
Traffic Signal Improvements, SH 352 (at Galloway Ave to in the City of Mesquite). Let by Texas DOT on March 5, 2026, Dallas, Dallas District. 8 bids received; low bid $1,590,456 by Elecnor Belco Electric, Inc., -31% against the engineer's estimate of $2,316,555.
- Owner
- Texas DOT
- Letting
- 05 MAR 2026
- Pay items
- 122
- Data through
- 19 NOV 2026
Bidders
| Rank | Bidder | Total bid | Against the low bid | Against the estimate |
|---|---|---|---|---|
| 1 | Elecnor Belco Electric, Inc. | $1,590,456 | Low | -31% |
| 2 | Sice, Inc. | $1,986,243 | +25% | -14% |
| 3 | American Lighting and Signalization, LLC | $2,200,000 | +38% | -5.0% |
| 4 | Highway Intelligent Traffic Solutions, Inc. | $2,234,447 | +40% | -4.0% |
| 5 | Durable Specialties, Inc. | $2,256,981 | +42% | -3.0% |
| 6 | WG Engineering & Construction, LLC | $2,489,233 | +57% | +7.0% |
| 7 | Select Maintenance, L.L.C. | $2,783,646 | +75% | +20% |
| 8 | Yunex LLC | $2,793,908 | +76% | +21% |
Engineer's estimate: $2,316,555.
Bid tabulation
| Line | Pay item | Unit | Quantity | Estimate | 1. Elecnor Belco Electric, Inc. | 2. Sice, Inc. | 3. American Lighting and Signalization, LLC | 4. Highway Intelligent Traffic Solutions, Inc. | 5. Durable Specialties, Inc. | 6. WG Engineering & Construction, LLC |
|---|---|---|---|---|---|---|---|---|---|---|
| 1 | Removing concrete (pavement) (104-7001) | SY | 90 | $159.00 | $108.59 | $115.00 | $160.55 | $94.00 | $100.00 | |
| 2 | Removing concrete (sidewalk, ramp or shared use path) (104-7013) | SY | 36 | $131.00 | $83.04 | $88.00 | $132.27 | $72.00 | $75.00 | |
| 3 | Removing concrete (curb & gutter) (104-7017) | LF | 232 | $28.00 | $45.00 | $44.71 | $47.00 | $45.27 | $39.00 | $40.00 |
| 4 | Excavation (roadway) (110-7001) | CY | 56.30 | $76.00 | $89.43 | $94.00 | $76.73 | $77.00 | $80.00 | |
| 5 | Block sodding (162-7002) | SY | 85 | $21.00 | $15.33 | $30.00 | $28.42 | $45.00 | $15.00 | |
| 6 | Loose aggregate GRND cover (type II) (192-7025) | CY | 3.30 | $48.00 | $533.00 | $287.44 | $1,078.00 | $952.00 | $880.00 | $945.00 |
| 7 | Rework BS metal (type C)(8")(ord comp) (251-7051) | SY | 56 | $44.00 | $83.04 | $88.00 | $44.27 | $72.00 | $75.00 | |
| 8 | Concrete pavement (CRCP)(fast TRK) (12") (360-7076) | SY | 140 | $306.00 | $304.05 | $321.00 | $310.47 | $262.00 | $280.00 | |
| 9 | Drilled shaft (roadway illumination pole) (30 in) (416-7040) | LF | 16 | $356.00 | $194.50 | $350.00 | $385.61 | $590.00 | $465.00 | |
| 10 | Drilled shaft (traffic signal pole) (30 in) (416-7043) | LF | 66 | $525.00 | $356.00 | $249.87 | $396.00 | $523.60 | $650.00 | $510.00 |
| 11 | Drilled shaft (traffic signal pole) (36 in) (416-7044) | LF | 117 | $600.00 | $404.00 | $507.07 | $485.00 | $552.16 | $720.00 | $635.00 |
| 12 | Drilled shaft (traffic signal pole) (48 in) (416-7046) | LF | 44 | $541.00 | $630.81 | $805.00 | $568.82 | $845.00 | $898.00 | |
| 13 | Riprap (concrete)(6 in) (432-7003) | CY | 3.10 | $1,100.00 | $1,758.00 | $1,533.02 | $1,617.00 | $1,785.00 | $1,320.00 | $1,400.00 |
| 14 | Adjusting manholes (water valve box) (479-7007) | EACH | 1 | $1,000.00 | $2,344.00 | $3,960.30 | $4,176.00 | $773.50 | $3,410.00 | $3,650.00 |
| 15 | Mobilization (500-7001) | LS | 1 | $205,000 | $58,000 | $168,021 | $91,657 | $218,464 | $82,000 | $163,850 |
| 16 | Barricades, signs and traffic handling (502-7001) | MO | 8 | $8,500.00 | $5,800.00 | $7,391.19 | $2,694.00 | $3,956.23 | $8,000.00 | $6,889.00 |
| 17 | Portable changeable message sign (503-7001) | DAY | 50 | $165.00 | $97.00 | $320.01 | $81.00 | $65.45 | $75.00 | $150.00 |
| 18 | TMA (stationary) (505-7001) | DAY | 160 | $234.00 | $268.00 | $470.72 | $255.00 | $339.77 | $185.00 | $285.00 |
| 19 | Biodegradable erosion control logs (install) (18") (506-7045) | LF | 530 | $8.00 | $19.00 | $10.22 | $1.00 | $9.52 | $1.00 | $8.00 |
| 20 | Biodegradable erosion control logs (remove) (506-7046) | LF | 530 | $2.00 | $4.00 | $2.56 | $1.00 | $2.38 | $0.50 | $3.00 |
| 21 | Colored textured concrete (6") (527-7003) | SY | 13 | $204.00 | $301.49 | $318.00 | $206.88 | $260.00 | $275.00 | |
| 22 | Concrete curb (type II) (529-7002) | LF | 126 | $55.00 | $42.00 | $102.20 | $108.00 | $42.59 | $88.00 | $90.00 |
| 23 | Concrete curb & gutter (type II) (529-7009) | LF | 285 | $66.00 | $80.00 | $121.36 | $128.00 | $81.25 | $105.00 | $110.00 |
| 24 | Concrete sidewalks (6") (531-7003) | SY | 195 | $120.00 | $119.00 | $153.30 | $162.00 | $120.00 | $132.00 | $145.00 |
| 25 | Curb ramps (type 2) (531-7006) | EACH | 2 | $4,000.00 | $2,930.00 | $3,960.30 | $4,176.00 | $2,975.00 | $3,410.00 | $3,680.00 |
| 26 | Curb ramps (type 5) (531-7008) | EACH | 4 | $3,516.00 | $5,365.56 | $5,658.00 | $3,570.00 | $4,620.00 | $5,000.00 | |
| 27 | Curb ramps (type 7) (531-7010) | EACH | 23 | $3,750.00 | $2,930.00 | $4,599.05 | $4,850.00 | $2,975.00 | $3,960.00 | $4,300.00 |
| 28 | Fixed bollard (531-7027) | EACH | 4 | $975.00 | $4,453.00 | $1,022.01 | $1,078.00 | $952.00 | $880.00 | $1,554.00 |
| 29 | Concrete median (mono nose) (536-7006) | SY | 47 | $189.00 | $249.12 | $263.00 | $190.97 | $215.00 | $235.00 | |
| 30 | In RD IL (type SA) 30T-8 (250W EQ) LED (610-7072) | EACH | 2 | $4,079.00 | $3,999.26 | $3,402.00 | $5,145.56 | $5,500.00 | $5,245.00 | |
| 31 | Conduit (PVC) (schedule 40) (2") (bore) (618-7031) | LF | 55 | $45.00 | $40.00 | $33.46 | $27.00 | $43.79 | $52.00 | $30.00 |
| 32 | Conduit (PVC) (schedule 40) (3") (618-7036) | LF | 675 | $26.00 | $23.00 | $23.23 | $20.00 | $17.02 | $28.00 | $26.00 |
| 33 | Conduit (PVC) (schedule 40) (4") (618-7040) | LF | 190 | $32.00 | $33.00 | $10.28 | $31.00 | $19.64 | $29.00 | $30.00 |
| 34 | Conduit (PVC) (schedule 40) (4") (bore) (618-7041) | LF | 1,605 | $50.00 | $28.00 | $42.47 | $40.00 | $35.22 | $54.00 | $48.00 |
| 35 | Conduit (PVC) (schedule 80) (2") (618-7054) | LF | 640 | $24.00 | $22.00 | $19.61 | $19.00 | $14.04 | $27.00 | $26.00 |
| 36 | Conduit (prepare) (618-7090) | LF | 690 | $2.00 | $4.50 | $2.77 | $5.30 | $4.40 | $1.00 | $7.00 |
| 37 | Electrical conductor (no.12) insulated (620-7004) | LF | 960 | $1.40 | $0.81 | $3.20 | $1.67 | $2.00 | $2.50 | |
| 38 | Electrical conductor (no.8) insulated (620-7008) | LF | 3,130 | $2.00 | $1.41 | $3.70 | $2.38 | $3.00 | $3.00 | |
| 39 | Electrical conductor (no.6) bare (620-7009) | LF | 3,155 | $3.00 | $2.60 | $1.50 | $3.90 | $2.50 | $4.00 | $3.00 |
| 40 | Electrical conductor (no.6) insulated (620-7010) | LF | 330 | $3.00 | $2.60 | $2.01 | $4.40 | $2.74 | $4.00 | $3.35 |
| 41 | Tray cable (3 conductor) (12 AWG) (621-7002) | LF | 3,755 | $4.00 | $2.80 | $10.86 | $4.40 | $2.86 | $4.00 | $3.00 |
| 42 | Ground box type D (162922)W/apron (624-7008) | EACH | 23 | $2,215.00 | $1,758.00 | $2,040.65 | $2,668.00 | $1,586.27 | $2,280.00 | $2,355.00 |
| 43 | Remove ground box (624-7013) | EACH | 18 | $260.00 | $250.00 | $638.76 | $450.00 | $503.37 | $350.00 | $400.00 |
| 44 | Elc SRV type D 120/240 070(NS)SS(E)PS(U) (628-7190) | EACH | 4 | $10,250 | $4,298.00 | $8,680.73 | $9,769.00 | $11,791 | $10,000 | $9,889.00 |
| 45 | Aluminum signs (type A) (636-7001) | SF | 216 | $52.00 | $47.00 | $96.69 | $53.00 | $52.36 | $45.00 | $45.00 |
| 46 | Relocate SM RD SN sup&AM type 10BWG (644-7065) | EACH | 5 | $700.00 | $488.00 | $1,273.49 | $1,400.00 | $841.76 | $400.00 | $1,152.00 |
| 47 | Reflectorized pavement marking type I (W)8"(solid)(090MIL) (666-7023) | LF | 2,840 | $2.00 | $1.15 | $1.60 | $1.90 | $1.49 | $1.50 | $2.50 |
| 48 | Reflectorized pavement marking type I (W)24"(solid)(090MIL) (666-7035) | LF | 2,990 | $11.00 | $7.00 | $8.11 | $10.00 | $7.56 | $8.00 | $13.50 |
| 49 | Reflectorized pavement marking type I (W)(RR crossing)(090MIL) (666-7080) | EACH | 2 | $654.00 | $528.00 | $862.32 | $472.00 | $803.25 | $385.00 | $650.00 |
| 50 | Pavement sler 6" (666-7347) | LF | 6,910 | $0.37 | $0.30 | $0.23 | $0.20 | $0.21 | $1.50 | $0.30 |
| 51 | Pavement sler 8" (666-7348) | LF | 2,840 | $0.60 | $0.35 | $0.26 | $0.27 | $0.24 | $0.20 | $0.50 |
| 52 | Pavement sler 24" (666-7352) | LF | 2,990 | $3.00 | $1.20 | $0.77 | $2.70 | $0.71 | $2.00 | $4.00 |
| 53 | Pavement sler (arrow) (666-7353) | EACH | 28 | $22.00 | $71.00 | $25.55 | $20.00 | $23.80 | $16.00 | $28.00 |
| 54 | Pavement sler (word) (666-7354) | EACH | 25 | $40.00 | $71.00 | $25.55 | $27.00 | $23.80 | $22.00 | $38.00 |
| 55 | Pavement sler (RR crossing) (666-7364) | EACH | 2 | $95.00 | $118.00 | $38.33 | $162.00 | $35.70 | $132.00 | $223.00 |
| 56 | Reflectorized pavement marking type I (W)6"(broken)(090MIL) (666-7407) | LF | 2,060 | $1.00 | $1.50 | $1.15 | $1.50 | $1.07 | $2.00 | $2.00 |
| 57 | Reflectorized pavement marking type I (W)6"(solid)(090MIL) (666-7410) | LF | 685 | $1.60 | $0.92 | $1.50 | $0.86 | $2.00 | $2.00 | |
| 58 | Reflectorized pavement marking type I (Y)6"(solid)(090MIL) (666-7422) | LF | 3,665 | $1.00 | $1.60 | $0.92 | $1.50 | $0.86 | $2.00 | $2.00 |
| 59 | Prefabricated PM type C (W)(arrow) (668-7091) | EACH | 28 | $255.00 | $241.00 | $287.44 | $296.00 | $267.75 | $242.00 | $410.00 |
| 60 | Prefabricated PM type C (W)(word) (668-7103) | EACH | 25 | $300.00 | $288.00 | $325.77 | $317.00 | $303.45 | $255.00 | $435.00 |
| 61 | Reflectorized pavement marker type I-C (672-7002) | EACH | 167 | $6.00 | $6.00 | $5.05 | $5.30 | $4.70 | $5.00 | $7.35 |
| 62 | Reflectorized pavement marker type II-A-A (672-7004) | EACH | 268 | $7.00 | $6.00 | $5.05 | $5.30 | $4.70 | $5.00 | $7.35 |
| 63 | Reflectorized pavement marker type II-C-R (672-7006) | EACH | 471 | $7.00 | $5.05 | $5.30 | $4.70 | $5.00 | $7.35 | |
| 64 | Eliminating existing PM & markers (4") (677-7001) | LF | 10,265 | $1.00 | $0.80 | $0.70 | $0.88 | $0.65 | $1.00 | $1.50 |
| 65 | Eliminating existing PM & markers (6") (677-7002) | LF | 400 | $0.80 | $0.70 | $1.40 | $0.65 | $1.00 | $2.00 | |
| 66 | Eliminating existing PM & markers (8") (677-7004) | LF | 2,670 | $2.00 | $0.90 | $0.83 | $1.80 | $0.77 | $1.00 | $3.00 |
| 67 | Eliminating existing PM & markers (12") (677-7006) | LF | 1,885 | $2.00 | $1.20 | $1.98 | $2.70 | $1.84 | $2.00 | $4.00 |
| 68 | Eliminating existing PM & markers (24") (677-7008) | LF | 730 | $5.00 | $2.40 | $3.83 | $5.40 | $3.57 | $4.00 | $8.00 |
| 69 | Eliminating existing PM & markers (arrow) (677-7009) | EACH | 16 | $65.00 | $94.00 | $61.32 | $61.00 | $57.12 | $50.00 | $85.00 |
| 70 | Eliminating existing PM & markers (word) (677-7015) | EACH | 7 | $65.00 | $94.00 | $61.32 | $74.00 | $57.12 | $60.00 | $105.00 |
| 71 | Eliminating existing PM & markers (RR crossing) (677-7019) | EACH | 2 | $185.00 | $176.00 | $249.12 | $242.00 | $232.05 | $200.00 | $335.00 |
| 72 | Pavement surface preparation for marking (6") (678-7002) | LF | 6,910 | $0.25 | $0.30 | $0.06 | $0.09 | $0.06 | $0.05 | $0.15 |
| 73 | Pavement surface preparation for marking (8") (678-7004) | LF | 2,840 | $0.50 | $0.30 | $0.10 | $0.13 | $0.10 | $0.10 | $0.20 |
| 74 | Pavement surface preparation for marking (24") (678-7008) | LF | 2,990 | $0.60 | $0.90 | $0.31 | $0.81 | $0.29 | $1.00 | $1.50 |
| 75 | Pavement surface preparation for marking (arrow) (678-7009) | EACH | 28 | $15.00 | $24.00 | $12.78 | $13.00 | $11.90 | $11.00 | $19.00 |
| 76 | Pavement surface preparation for marking (word) (678-7016) | EACH | 25 | $20.00 | $24.00 | $12.78 | $20.00 | $11.90 | $16.00 | $30.00 |
| 77 | Pavement surface preparation for marking (RR crossing) (678-7020) | EACH | 2 | $45.00 | $59.00 | $57.49 | $108.00 | $53.55 | $88.00 | $150.00 |
| 78 | Pavement surface preparation for marking (RPM) (678-7033) | EACH | 906 | $1.00 | $1.00 | $0.32 | $0.07 | $0.30 | $0.10 | $0.20 |
| 79 | Removing traffic signals (680-7004) | EACH | 4 | $10,000 | $5,000.00 | $5,470.76 | $24,039 | $22,719 | $5,000.00 | $12,858 |
| 80 | Ins HY traffic signal (DPT sup CNT & cab)(iso) (680-7005) | EACH | 4 | $35,000 | $13,600 | $11,761 | $25,446 | $56,899 | $30,000 | $60,525 |
| 81 | Install highway traffic signal (upgrade) (680-7011) | EACH | 1 | $3,900.00 | $3,581.46 | $43,428 | $13,288 | $8,000.00 | $28,582 | |
| 82 | Vehicle signal section (12")LED(green) (682-7001) | EACH | 40 | $350.00 | $224.00 | $312.37 | $450.00 | $334.39 | $700.00 | $403.00 |
| 83 | Vehicle signal section (12")LED(green arrow) (682-7002) | EACH | 20 | $350.00 | $224.00 | $286.42 | $450.00 | $340.34 | $700.00 | $403.00 |
| 84 | Vehicle signal section (12")LED(yel) (682-7003) | EACH | 44 | $350.00 | $224.00 | $287.28 | $450.00 | $334.39 | $700.00 | $403.00 |
| 85 | Vehicle signal section (12")LED(yel arrow) (682-7004) | EACH | 28 | $350.00 | $224.00 | $285.42 | $450.00 | $340.34 | $700.00 | $403.00 |
| 86 | Vehicle signal section (12")LED(red) (682-7005) | EACH | 44 | $350.00 | $224.00 | $287.28 | $450.00 | $334.39 | $700.00 | $403.00 |
| 87 | Vehicle signal section (12")LED(red arrow) (682-7006) | EACH | 20 | $350.00 | $224.00 | $285.79 | $450.00 | $340.34 | $700.00 | $403.00 |
| 88 | Pedestrian signal section (LED)(countdown) (682-7018) | EACH | 44 | $850.00 | $721.00 | $740.77 | $779.00 | $809.20 | $1,200.00 | $1,200.00 |
| 89 | Backplate W/reflectorized border(4 sec) (682-7037) | EACH | 2 | $121.00 | $400.28 | $316.00 | $159.46 | $230.00 | $245.00 | |
| 90 | Backplate W/reflectorized border(3 sec)aluminum (682-7039) | EACH | 44 | $250.00 | $121.00 | $358.94 | $314.00 | $197.54 | $210.00 | $260.00 |
| 91 | Backplate W/reflectorized border(4 sec)aluminum (682-7040) | EACH | 14 | $350.00 | $187.00 | $424.48 | $395.00 | $266.56 | $230.00 | $270.00 |
| 92 | Traffic signal CBL (type A)(14 AWG)(5 conductor) (684-7031) | LF | 2,415 | $3.50 | $2.80 | $1.96 | $5.80 | $2.86 | $3.00 | $3.00 |
| 93 | Traffic signal CBL (type A)(14 AWG)(7 conductor) (684-7033) | LF | 1,945 | $4.00 | $2.80 | $2.30 | $6.30 | $3.21 | $3.00 | $3.50 |
| 94 | Traffic signal CBL (type A)(14 AWG)(10 conductor) (684-7036) | LF | 4,130 | $6.00 | $4.00 | $3.46 | $8.30 | $4.52 | $6.00 | $4.00 |
| 95 | Traffic signal CBL (type A)(14 AWG)(20 conductor) (684-7046) | LF | 2,865 | $8.00 | $7.60 | $6.51 | $12.00 | $6.55 | $8.00 | $6.00 |
| 96 | Traffic signal CBL (type C)(12 AWG)(2 conductor) (684-7079) | LF | 7,155 | $4.00 | $2.00 | $1.80 | $6.20 | $1.90 | $2.00 | $3.00 |
| 97 | Ins traffic signal PL AM(S)1 arm(32')ilsn (686-7034) | EACH | 2 | $17,510 | $9,941.00 | $11,393 | $14,289 | $13,499 | $15,300 | $10,349 |
| 98 | Ins traffic signal PL AM(S)1 arm(32')lum&ilsn (686-7036) | EACH | 4 | $12,026 | $14,416 | $15,848 | $15,808 | $17,100 | $12,536 | |
| 99 | Ins traffic signal PL AM(S)1 arm(40')lum&ilsn (686-7044) | EACH | 1 | $13,265 | $15,914 | $18,082 | $17,344 | $19,300 | $14,424 | |
| 100 | Ins traffic signal PL AM(S)1 arm(44')ilsn (686-7046) | EACH | 1 | $12,288 | $14,321 | $16,839 | $15,932 | $17,900 | $14,070 | |
| 101 | Ins traffic signal PL AM(S)1 arm(44')lum&ilsn (686-7048) | EACH | 1 | $13,946 | $16,378 | $19,570 | $17,798 | $19,600 | $15,903 | |
| 102 | Ins traffic signal PL AM(S)1 arm(48')ilsn (686-7050) | EACH | 3 | $20,800 | $13,915 | $16,207 | $18,388 | $17,617 | $18,600 | $16,535 |
| 103 | Ins traffic signal PL AM(S)1 arm(48')lum&ilsn (686-7052) | EACH | 2 | $16,011 | $18,657 | $20,043 | $19,938 | $20,300 | $18,732 | |
| 104 | Ins traffic signal PL AM(S)1 arm(55')lum&ilsn (686-7060) | EACH | 1 | $35,402 | $39,297 | $44,726 | $40,436 | $38,200 | $35,275 | |
| 105 | Ins traffic signal PL AM(S)1 arm(60')ilsn (686-7062) | EACH | 1 | $33,543 | $36,880 | $43,336 | $37,962 | $35,300 | $34,191 | |
| 106 | Ins traffic signal PL AM(S)2 arm(40-28')ilsn (686-7138) | EACH | 1 | $30,500 | $16,654 | $19,705 | $20,408 | $22,861 | $21,200 | $20,639 |
| 107 | Pedestrian pole assembly (687-7001) | EACH | 30 | $2,550.00 | $2,110.00 | $3,571.96 | $2,103.00 | $3,772.30 | $6,000.00 | $4,125.00 |
| 108 | Pedestrian detect push button (APS) (688-7001) | EACH | 44 | $1,200.00 | $1,205.00 | $1,026.32 | $1,031.00 | $1,066.24 | $975.00 | $1,354.00 |
| 109 | Pedestrian detector controller unit (688-7003) | EACH | 5 | $3,950.00 | $3,858.00 | $3,963.21 | $4,288.00 | $3,985.31 | $5,500.00 | $3,954.00 |
| 110 | VIVDS prosr sys (6006-7001) | EACH | 4 | $5,600.00 | $12,779 | $12,292 | $14,859 | $12,305 | $5,000.00 | $24,085 |
| 111 | VIVDS cam assy FXD LNS (6006-7002) | EACH | 14 | $7,500.00 | $2,610.00 | $2,463.71 | $2,680.00 | $3,215.38 | $7,400.00 | $7,500.00 |
| 112 | VIVDS cabling (6006-7007) | LF | 3,215 | $4.00 | $1.60 | $1.37 | $3.40 | $2.50 | $3.00 | $3.00 |
| 113 | VIVDS prosr sys (install only) (6006-7009) | EACH | 1 | $488.50 | $607.90 | $813.00 | $2.38 | $450.00 | $1,650.00 | |
| 114 | VIVDS cam assy (install only) (6006-7010) | EACH | 4 | $488.00 | $911.86 | $813.00 | $1,385.16 | $1,250.00 | $1,650.00 | |
| 115 | Bbu system (external battery cabinet) (6007-7001) | EACH | 4 | $9,215.00 | $9,173.00 | $10,367 | $10,450 | $10,246 | $8,600.00 | $8,255.00 |
| 116 | Ground box (prepare) (6013-7006) | EACH | 9 | $790.00 | $244.00 | $383.26 | $500.00 | $545.02 | $150.00 | $465.00 |
| 117 | ITS com CBL (ethernet) (6018-7004) | LF | 635 | $5.00 | $3.00 | $1.76 | $3.70 | $4.05 | $4.00 | $3.00 |
| 118 | Field hardened ethernet switch relocate (6023-7002) | EACH | 4 | $750.00 | $485.00 | $385.26 | $250.00 | $2,552.69 | $150.00 | $502.00 |
| 119 | Fiber optic CBL (single-mode)(12 fiber) (6027-7001) | LF | 380 | $3.50 | $1.60 | $2.37 | $5.40 | $7.02 | $12.00 | $6.00 |
| 120 | Fiber optic fusion splice (6027-7004) | EACH | 16 | $80.00 | $80.00 | $40.40 | $54.00 | $524.61 | $300.00 | $60.00 |
| 121 | Fiber optic patch panel (12 position) (6027-7005) | EACH | 4 | $1,950.00 | $1,548.00 | $945.36 | $2,627.00 | $3,380.61 | $1,550.00 | $2,350.00 |
| 122 | FO splice enclosure (type 1) (6027-7009) | EACH | 4 | $2,815.00 | $1,182.00 | $792.06 | $2,662.00 | $3,380.61 | $2,400.00 | $2,350.00 |
The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.
Source
Read from TxDOT's tabulation for this contract. TxDOT Bid Tabulations open-data export (data.texas.gov) from September 2024, read 21 November 2026, and TxDOT's legacy Tabulation of Bids pages for January 2020 to August 2024. The legacy pages are a large sample, not every contract: their file names were reused from year to year. Their district is the one TxDOT gives the county. Bids that did not match their published total are left out.
Every contract let that day: TxDOT letting of March 5, 2026. Compiled by Mirage Metrics.
Your own bid history, read the same way
Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.