TxDOT contract A00131524 bid tabulation

Construct Ramps, SH 9 (Old Georgetown Road to BNSF Railway). Let by Texas DOT on September 4, 2025, Coryell, Waco District. 3 bids received; low bid $7,187,653 by Big Creek Construction, LTD., -42% against the engineer's estimate of $12,372,592.

Owner
Texas DOT
Letting
04 SEP 2025
Pay items
123
Data through
19 NOV 2026

Bidders

RankBidderTotal bidAgainst the low bidAgainst the estimate
1Big Creek Construction, LTD.$7,187,653Low-42%
2Texas Materials Group, Inc.$8,249,567+15%-33%
3Jordan Foster Construction, LLC$8,415,415+17%-32%
TxDOT contract A00131524: bids by rank

Engineer's estimate: $12,372,592.

Bid tabulation

LinePay itemUnitQuantityEstimate1. Big Creek Construction, LTD.2. Texas Materials Group, Inc.3. Jordan Foster Construction, LLC
1Preparing row (100-7002)STA28.40$7,000.00$5,000.00$1,345.00$19,000
2Removing concrete (pavement) (104-7001)SY236$40.00$40.00$65.00$40.00
3Remove (9"-13") TRT/untrt base & asphalt pavement (105-7009)SY1,305$15.00$12.00$11.75$11.00
4Remove (14"-18") TRT/untrt base & asphalt pavement (105-7014)SY3,182$20.00$20.00$15.00$13.00
5Remove (0"-8") TRT/untrt base & asphalt pavement (105-7048)SY205$10.00$35.00$26.00$10.00
6Excavation (roadway) (110-7001)CY79,850$48.00$16.00$30.00$10.50
7Embankment (final)(OC)(type B) (132-7003)CY178$43.00$40.00$38.00$17.25
8Embankment (final)(DC)(type B) (132-7004)CY28,269$42.00$14.00$6.10$17.25
9Furn & place topsoil (4") (160-7002)SY138,384$4.00$1.50$3.75$3.10
10Broadcast seed (temporary_warm_cool) (164-7007)SY138,384$0.50$0.27$0.12$0.20
11Hydro mulch seed (permanent_rural_clay) (164-7018)SY138,384$1.50$0.45$0.42$0.70
12Vegetative watering (168-7001)TGL2,247$60.00$35.00$64.88$55.00
13Soil ret BLKT(SL_mod_clay_long) (169-7002)SY33,678$2.50$1.50$0.66$2.00
14Soil ret BLKT(chan_permanent_6 PSF) (169-7033)SY5,633$4.50$3.00$7.73$5.35
15Proof rolling (216-7001)HR6$115.00$125.00$130.00$120.00
16FL BS (compacted in place)(tyd GR1-2)(final pos) (247-7188)CY7,321$80.00$72.00$62.00$75.00
17Lime (com or QK)(slurry) (260-7005)TON30$350.00$350.00$285.00$335.00
18Lime TRT (existing material)(12") (260-7009)SY916$6.00$15.00$27.00$25.00
19Emuls asphalt (BS or subgr TRT)(CSS-1H) (314-7004)GAL52,726$5.00$3.40$3.40$7.50
20Fog seal (CSS-1H) (315-7004)GAL2,637$5.00$6.00$4.50$4.00
21Asphalt (CRS-2) (316-7011)GAL11,863$4.75$3.80$3.50$4.15
22Aggregate (type-D or L, GR-4) (316-7253)CY194$250.00$200.00$248.00$260.00
23D-GR HMA type-B PG64-22 (341-7001)TON7,089$135.00$95.00$120.00$120.00
24SP mixes SP-C sac-B PG70-22 (344-7021)TON4,056$140.00$102.00$140.00$138.00
25Tack coat (344-7077)GAL2,352$5.30$3.60$3.05$4.15
26Tom-C PG76-22 sac-B (347-7002)TON1,148$140.00$150.00$173.00$178.00
27Tack coat (347-7011)GAL2,664$5.00$3.70$3.05$4.15
28Plan asphalt concrete pavement (0.75") (354-7079)SY26,638$2.25$1.80$1.35$1.00
29Concrete pavement (CRCP) (9") (360-7003)SY844$180.00$150.00$140.00$155.00
30Cut & restoring pavement (400-7006)SY132$240.00$160.00$160.00$265.00
31Cem stabil BKFL (400-7010)CY165$280.00$195.00$260.00$200.00
32Trench excavation protection (402-7001)LF366$22.00$35.00$1.00$15.00
33Temporary special shoring (403-7001)SF1,184$45.00$30.00$30.00$23.00
34Drilled shaft (sign mounts) (24 in) (416-7028)LF35$280.00$250.00$170.00$200.00
35Drilled shaft (roadway illumination pole) (30 in) (416-7040)LF88$360.00$300.00$210.00$245.00
36Riprap (concrete)(5 in) (432-7002)CY183$750.00$700.00$675.00$975.00
37Riprap (mow strip)(5 in) (432-7014)CY2$500.00$1,000.00$1,000.00$1,200.00
38Riprap (stone protection)(18 in) (432-7043)CY67$225.00$160.00$275.00$280.00
39Concrete box culvert (3 FT X 2 FT) (462-7001)LF65$420.00$275.00$280.00$500.00
40Concrete box culvert (7 FT X 7 FT) (462-7019)LF63$1,200.00$870.00$975.00$1,400.00
41RC pipe (CL III)(18 in) (464-7003)LF122$110.00$85.00$80.00$185.00
42RC pipe (CL III)(24 in) (464-7005)LF250$135.00$155.00$95.00$205.00
43RC pipe (CL III)(36 in) (464-7009)LF373$245.00$185.00$210.00$280.00
44RC pipe (CL IV)(30 in) (464-7023)LF96$195.00$150.00$150.00$290.00
45Manh (complete)(PRM)(72IN) (465-7004)EACH1$12,000$23,000$8,800.00$40,000
46Inlet(complete)(pazd)(FG)(5FTX5FT-4FTX4FT) (465-7162)EACH1$11,500$8,800.00$10,300$10,000
47Wingwall (PW - 2) (HW=8 FT) (466-7192)EACH2$35,000$26,900$27,900$45,000
48Set (type I)(S= 3 FT)(HW= 3 FT)(3:1)(C) (467-7040)EACH2$8,000.00$10,800$7,000.00$9,500.00
49Set (type II) (18 in) (RCP) (3: 1) (C) (467-7305)EACH2$1,950.00$875.00$900.00$2,000.00
50Set (type II) (18 in) (RCP) (6: 1) (P) (467-7308)EACH1$2,000.00$1,060.00$1,220.00$2,400.00
51Set (type II) (24 in) (RCP) (3: 1) (C) (467-7325)EACH1$2,000.00$1,350.00$1,100.00$2,000.00
52Set (type II) (24 in) (RCP) (4: 1) (C) (467-7326)EACH1$2,050.00$1,410.00$1,350.00$2,400.00
53Set (type II) (24 in) (RCP) (6: 1) (P) (467-7328)EACH1$2,200.00$1,600.00$1,600.00$3,111.00
54Set (type II) (30 in) (RCP) (6: 1) (P) (467-7348)EACH2$2,720.00$2,500.00$2,500.00$4,300.00
55Set (type II) (36 in) (RCP) (3: 1) (C) (467-7365)EACH5$4,500.00$3,400.00$3,000.00$6,600.00
56Removing structure (set) (496-7004)EACH1$700.00$350.00$300.00$500.00
57Removing structure (pipe) (496-7007)LF226$37.50$25.00$13.00$22.00
58Mobilization (500-7001)LS1$626,891$700,000$500,000$800,000
59Barricades, signs and traffic handling (502-7001)MO12$12,000$5,000.00$5,000.00$8,500.00
60Portable changeable message sign (503-7002)EACH4$10,000$9,750.00$6,000.00$11,000
61TMA (stationary) (505-7001)DAY193$300.00$400.00$275.00$30.00
62TMA (mobile operation) (505-7002)HR112$90.00$85.00$10.00$200.00
63Rock filter dams (install) (type 2) (506-7002)LF216$49.00$45.00$45.16$41.00
64Rock filter dams (remove) (506-7011)LF216$16.50$5.00$17.00$23.00
65Embankment (erosion & sediment control, in place) (506-7026)CY743$50.00$25.00$20.00$10.00
66Temporary sediment control fence (install) (506-7039)LF1,873$5.50$5.00$6.49$4.15
67Temporary sediment control fence (remove) (506-7041)LF1,873$2.45$1.00$0.88$1.35
68Portable concrete traffic barrier (des source)(single slope)(type 1) (512-7013)LF1,830$25.00$12.00$16.86$18.00
69Portable concrete traffic barrier (move)(single slope)(type 1) (512-7025)LF810$10.00$8.00$17.00$4.75
70Portable concrete traffic barrier (stockpile)(single slope)(type 1) (512-7037)LF1,830$16.50$11.00$16.50$17.00
71Concrete curb & gutter (type I) (529-7008)LF889$60.00$36.00$48.00$36.00
72Driveways (ACP) (530-7010)SY155$100.00$60.00$75.00$130.00
73Concrete median (536-7002)SY571$195.00$95.00$110.00$145.00
74Crash cushion attenuator (move & reset) (545-7002)EACH2$1,400.00$1,500.00$1,550.00$875.00
75Crash cushion attenuator (stockpile) (545-7003)EACH2$1,225.00$1,000.00$810.00$1,020.00
76Crash cushion attenuator (install)(S)(W)(TL3) (545-7016)EACH2$11,000$12,000$7,925.00$12,300
77Chain link fence (remove) (550-7007)LF5,706$19.00$8.00$10.52$6.00
78Chain link fence(install)(6 )(barb top) (550-7008)LF7,192$64.00$40.00$42.36$35.00
79Gate (remove) (550-7016)EACH2$400.00$2,500.00$539.65$2,000.00
80Gate (install)(6'X24') (550-7018)EACH2$2,500.00$10,000$2,914.08$10,000
81In RD IL (type SA) 40T-8 (250W EQ) LED (610-7124)EACH11$5,350.00$6,500.00$4,000.00$4,700.00
82Conduit (PVC) (schedule 40) (2") (618-7030)LF7,734$21.00$10.00$8.00$9.40
83Conduit (PVC) (schedule 80) (2") (bore) (618-7055)LF220$28.00$80.00$65.00$75.00
84Electrical conductor (no.10) bare (620-7005)LF10,399$2.00$1.50$1.00$1.20
85Ground box type A (122311)W/apron (624-7002)EACH11$1,500.00$2,000.00$1,200.00$1,400.00
86Remove ground box (624-7013)EACH5$500.00$150.00$92.00$110.00
87Remove electrical services (628-7002)EACH1$1,200.00$800.00$552.00$650.00
88Elc SRV type A 240/480 060(NS)SS(E)SP(O) (628-7048)EACH1$9,500.00$8,500.00$7,000.00$8,300.00
89Aluminum signs (type G) (636-7002)SF287$45.00$40.00$35.00$84.00
90Install small roadside sign support and assembly type 10BWG(1)SA(T) (644-7004)EACH2$1,000.00$1,200.00$955.00$1,315.00
91Install small roadside sign support and assembly type 10BWG(1)SA(U) (644-7007)EACH1$1,000.00$1,600.00$1,280.00$1,650.00
92Install small roadside sign support and assembly TYS80(1)SA(U-WC) (644-7035)EACH3$1,250.00$1,500.00$1,265.00$1,615.00
93Install small roadside sign support and assembly TYS80(1)SA(U-exal) (644-7036)EACH1$1,500.00$2,000.00$1,585.00$2,140.00
94Install small roadside sign support and assembly tytwt(1)WS(P) (644-7057)EACH42$730.00$750.00$485.00$690.00
95Remove SM RD SN sup&AM (644-7073)EACH2$165.00$150.00$110.00$200.00
96Relocate SM RD SN sup & AM type temporary (644-7077)EACH8$600.00$400.00$450.00$380.00
97Install LRSS (struct steel) (647-7001)LB1,720$9.50$7.00$6.00$8.00
98Install delineator assembly (D-SW)SZ 2(WC)GND (658-7009)EACH26$30.00$50.00$70.00$57.00
99Install delineator assembly (D-DW)SZ 2(WC)GND (658-7049)EACH24$30.00$60.00$71.00$60.00
100Install object marker assembly (OM-2Y)(WC)GND (658-7056)EACH21$100.00$200.00$63.00$195.00
101Work zone pavement marking non-removing (W)6"(solid) (662-7008)LF13,160$0.60$0.60$0.52$0.30
102Work zone pavement marking non-removing (Y)6"(solid) (662-7038)LF13,160$0.60$0.60$0.52$0.30
103Work zone pavement marking removing (reflectorized) type I-C (662-7049)EACH8$2.00$7.00$5.00$6.00
104Work zone pavement marking removing (reflectorized) type II-A-A (662-7051)EACH666$2.00$7.50$5.50$6.00
105Work zone pavement marking removing (traffic BTN) type W (662-7057)EACH20$4.25$7.00$4.00$6.00
106Work zone pavement marking removing (traffic BTN) type Y (662-7059)EACH20$4.25$7.00$4.00$6.00
107Work zone pavement marking SHT terminal (tab)type Y-2 (662-7114)EACH165$1.60$2.00$1.12$2.35
108Reflectorized pavement marking type I (W)8"(solid)(100MIL) (666-7024)LF3,855$1.20$1.50$1.10$1.25
109Reflectorized pavement marking type I (W)12"(solid)(100MIL) (666-7030)LF15$3.45$7.00$6.50$5.90
110Reflectorized pavement marking type I (W)24"(solid)(100MIL) (666-7036)LF25$12.00$15.00$13.00$11.80
111Type I high perf PM (W)6"(broken)(100MIL) (666-7290)LF990$1.00$1.10$0.90$0.85
112Type I high perf PM (W)6"(solid)(100MIL) (666-7293)LF14,370$1.00$1.00$0.87$0.70
113Type I high perf PM (Y)6"(solid)(100MIL) (666-7305)LF11,143$1.00$1.00$0.87$0.70
114Prefabricated PM type C (W)(arrow) (668-7091)EACH1$300.00$500.00$205.00$265.00
115Reflectorized pavement marker type I-C (672-7002)EACH266$7.20$8.00$7.00$6.90
116Reflectorized pavement marker type II-A-A (672-7004)EACH125$7.20$8.50$7.50$6.90
117Reflectorized pavement marker type II-C-R (672-7006)EACH2$7.20$7.00$6.00$6.90
118Eliminating existing PM & markers (4") (677-7001)LF26,320$0.65$0.40$0.30$0.65
119Removal of conduit (690-7001)LF693$10.00$3.00$2.00$2.35
120Removal of cables (690-7009)LF9,567$2.00$1.50$0.50$0.60
121Cleaning / sweeping (aggregate removal) (738-7103)MI1.64$100.00$1,000.00$2,500.00$2,400.00
122Preformed in-lane (trans) rumble strip (6024-7001)LF160$30.00$20.00$15.00$11.75
123Aluminum electrical cond (#8 XHHW) (6071-7004)LF27,936$1.80$2.50$2.00$2.30
TxDOT contract A00131524: unit prices by line

The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.

Source

Read from TxDOT's tabulation for this contract. TxDOT Bid Tabulations open-data export (data.texas.gov) from September 2024, read 21 November 2026, and TxDOT's legacy Tabulation of Bids pages for January 2020 to August 2024. The legacy pages are a large sample, not every contract: their file names were reused from year to year. Their district is the one TxDOT gives the county. Bids that did not match their published total are left out.

Every contract let that day: TxDOT letting of September 4, 2025. Compiled by Mirage Metrics.

Your own bid history, read the same way

Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.

We use your email to reply to you and, now and then, to tell you about Mirage. You can opt out at any time. Privacy policy