TxDOT contract A00065038 bid tabulation
Reconstruct Existing Roadway, FM 113 (OLD MILLSAP ROAD to NORTH OF OLD MILLSAP ROAD). Let by Texas DOT on September 4, 2025, Parker, Fort Worth District. 4 bids received; low bid $1,351,259 by Jay Mills Contracting, Incorporated, -1.6% against the engineer's estimate of $1,373,017.
- Owner
- Texas DOT
- Letting
- 04 SEP 2025
- Pay items
- 52
- Data through
- 19 NOV 2026
Bidders
| Rank | Bidder | Total bid | Against the low bid | Against the estimate |
|---|---|---|---|---|
| 1 | Jay Mills Contracting, Incorporated | $1,351,259 | Low | -2.0% |
| 2 | Prater Dirt Work LLC | $1,409,314 | +4.0% | +3.0% |
| 3 | Jagoe-Public Company | $1,698,688 | +26% | +24% |
| 4 | Texas Materials Group, Inc. | $1,768,181 | +31% | +29% |
Engineer's estimate: $1,373,017.
Bid tabulation
| Line | Pay item | Unit | Quantity | Estimate | 1. Jay Mills Contracting, Incorporated | 2. Prater Dirt Work LLC | 3. Jagoe-Public Company | 4. Texas Materials Group, Inc. |
|---|---|---|---|---|---|---|---|---|
| 1 | Preparing row (100-7002) | STA | 10 | $9,000.00 | $4,000.00 | $3,500.00 | $500.00 | $100.00 |
| 2 | Removing concrete (pavement) (104-7001) | SY | 620 | $16.00 | $18.00 | $22.50 | $5.00 | $25.00 |
| 3 | Removing concrete (traffic barrier) (104-7035) | LF | 50 | $125.00 | $32.00 | $40.00 | $50.00 | $25.00 |
| 4 | Remove (12"-16") TRT/untrt base & asphalt pavement (105-7012) | SY | 3,575 | $10.00 | $16.00 | $15.00 | $20.00 | $14.50 |
| 5 | Excavation (roadway) (110-7001) | CY | 900 | $60.00 | $20.00 | $28.00 | $60.00 | $25.00 |
| 6 | Embankment (final)(OC)(type C1) (132-7007) | CY | 5,000 | $31.00 | $30.00 | $32.00 | $60.00 | $45.00 |
| 7 | Compost manuf topsoil (4") (161-7002) | SY | 5,726 | $5.00 | $1.65 | $3.00 | $4.00 | $2.11 |
| 8 | Broadcast seed (permanent_rural_sand) (164-7001) | SY | 5,726 | $1.00 | $0.54 | $0.50 | $0.25 | $0.36 |
| 9 | Broadcast seed (temporary_warm) (164-7005) | SY | 5,726 | $1.00 | $0.32 | $0.50 | $0.15 | $0.33 |
| 10 | Vegetative watering (168-7001) | TGL | 202 | $70.00 | $25.00 | $115.00 | $95.00 | $50.00 |
| 11 | FL BS (compacted in place)(tya GR1-2)(final pos) (247-7176) | CY | 1,547 | $90.00 | $72.00 | $60.00 | $70.00 | $160.00 |
| 12 | Cement (275-7001) | TON | 55 | $420.00 | $390.00 | $250.00 | $325.00 | $220.00 |
| 13 | Cement TRT (existing material)(8") (275-7003) | SY | 3,843 | $10.00 | $5.50 | $15.00 | $12.00 | $8.00 |
| 14 | Prime coat(MC-30 or AE-P) (310-7013) | GAL | 1,370 | $10.00 | $8.00 | $13.00 | $2.00 | $5.00 |
| 15 | D-GR HMA type-B PG64-22 (341-7001) | TON | 1,200 | $147.00 | $154.00 | $175.00 | $170.00 | $220.00 |
| 16 | Tack coat (341-7082) | GAL | 840 | $6.00 | $0.01 | $13.00 | $1.00 | $4.25 |
| 17 | SP mixes SP-C sac-A PG70-28 (344-7024) | TON | 492 | $180.00 | $302.50 | $225.00 | $205.00 | $265.00 |
| 18 | Plane & text asphalt concrete pavement(0" to 2") (354-7002) | SY | 470 | $3.00 | $10.00 | $30.00 | $3.00 | $5.00 |
| 19 | Riprap (concrete)(4 in) (432-7001) | CY | 33 | $1,000.00 | $750.00 | $780.00 | $1,500.00 | $735.00 |
| 20 | RC pipe (CL III)(24 in) (464-7005) | LF | 140 | $106.00 | $95.00 | $128.00 | $180.00 | $120.00 |
| 21 | RC pipe (CL V)(24 in) (464-7034) | LF | 110 | $180.00 | $110.00 | $144.00 | $230.00 | $135.00 |
| 22 | Set (type II) (24 in) (RCP) (6: 1) (C) (467-7327) | EACH | 2 | $2,430.00 | $2,500.00 | $3,000.00 | $3,900.00 | $2,800.00 |
| 23 | Set (type II) (24 in) (RCP) (6: 1) (P) (467-7328) | EACH | 6 | $1,950.00 | $2,500.00 | $3,000.00 | $3,900.00 | $2,800.00 |
| 24 | Removing structure (box culvert) (496-7008) | LF | 90 | $200.00 | $40.00 | $128.00 | $42.00 | $120.00 |
| 25 | Mobilization (500-7001) | LS | 1 | $124,819 | $130,000 | $130,000 | $188,800 | $175,000 |
| 26 | Barricades, signs and traffic handling (502-7001) | MO | 7 | $8,000.00 | $12,000 | $6,500.00 | $20,000 | $25,000 |
| 27 | Portable changeable message sign (503-7002) | EACH | 2 | $10,650 | $13,000 | $8,000.00 | $10,000 | $18,000 |
| 28 | TMA (stationary) (505-7001) | DAY | 64 | $215.00 | $204.00 | $400.00 | $150.00 | $10.00 |
| 29 | Rock filter dams (install) (type 2) (506-7002) | LF | 45 | $50.00 | $67.00 | $59.00 | $50.00 | $55.02 |
| 30 | Rock filter dams (remove) (506-7011) | LF | 45 | $20.00 | $17.60 | $25.00 | $25.00 | $20.94 |
| 31 | Temporary sediment control fence (install) (506-7039) | LF | 440 | $4.00 | $3.85 | $6.10 | $5.00 | $5.72 |
| 32 | Temporary sediment control fence (remove) (506-7041) | LF | 440 | $1.00 | $1.10 | $1.00 | $1.50 | $0.90 |
| 33 | Concrete curb & gutter (type II) (529-7009) | LF | 200 | $68.00 | $37.50 | $57.00 | $145.00 | $53.00 |
| 34 | Driveways (ACP) (530-7010) | SY | 668 | $70.00 | $163.00 | $125.00 | $100.00 | $165.00 |
| 35 | Concrete sidewalks (4") (531-7001) | SY | 243 | $75.00 | $83.00 | $98.00 | $85.00 | $92.00 |
| 36 | Concrete sidewalks (5") (531-7002) | SY | 276 | $85.00 | $88.00 | $102.00 | $200.00 | $96.00 |
| 37 | Curb ramps (type 7) (531-7010) | EACH | 7 | $2,600.00 | $3,000.00 | $3,850.00 | $4,000.00 | $3,600.00 |
| 38 | Mailbox install-S (TWG-post) type 2 (560-7002) | EACH | 1 | $320.00 | $242.00 | $425.00 | $250.00 | $1,000.00 |
| 39 | Aluminum signs (type A) (636-7001) | SF | 4 | $50.00 | $33.00 | $350.00 | $40.00 | $1,000.00 |
| 40 | Install small roadside sign support and assembly type 10BWG(1)SA(P) (644-7001) | EACH | 14 | $720.00 | $825.00 | $900.00 | $800.00 | $800.00 |
| 41 | Remove SM RD SN sup&AM (644-7073) | EACH | 6 | $150.00 | $110.00 | $500.00 | $110.00 | $500.00 |
| 42 | Install object marker assembly (OM-2Y)(WC)GND (658-7056) | EACH | 14 | $75.00 | $82.50 | $110.00 | $100.00 | $150.00 |
| 43 | Reflectorized pavement marking type I (W)24"(solid)(100MIL) (666-7036) | LF | 94 | $10.00 | $11.00 | $16.00 | $12.00 | $10.00 |
| 44 | Reflectorized pavement marking type I (W)(RR crossing)(100MIL) (666-7081) | EACH | 4 | $540.00 | $660.00 | $810.00 | $625.00 | $600.00 |
| 45 | Reflectorized pavement marking type II (W) 6" (solid) (666-7175) | LF | 1,530 | $2.00 | $0.61 | $0.75 | $0.75 | $0.55 |
| 46 | Reflectorized pavement marking type II (W) 24" (solid) (666-7184) | LF | 94 | $5.00 | $1.10 | $2.35 | $1.25 | $1.00 |
| 47 | Reflectorized pavement marking type II (Y) 6" (solid) (666-7213) | LF | 1,970 | $2.00 | $0.61 | $0.75 | $0.75 | $0.55 |
| 48 | Reflectorized pavement marking type I (W)6"(solid)(100MIL) (666-7411) | LF | 1,530 | $2.00 | $1.10 | $2.85 | $1.25 | $1.00 |
| 49 | Reflectorized pavement marking type I (Y)6"(solid)(100MIL) (666-7423) | LF | 1,970 | $2.00 | $1.10 | $2.85 | $1.25 | $1.00 |
| 50 | Reflectorized pavement marker type II-A-A (672-7004) | EACH | 35 | $5.00 | $8.80 | $14.00 | $9.00 | $8.00 |
| 51 | Eliminating existing PM & markers (12") (677-7006) | LF | 12 | $3.00 | $5.50 | $150.00 | $6.00 | $5.00 |
| 52 | Solar powered LED roadside sign (6002-7001) | EACH | 2 | $4,000.00 | $6,050.00 | $7,000.00 | $6,000.00 | $10,000 |
The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.
Source
Read from TxDOT's tabulation for this contract. TxDOT Bid Tabulations open-data export (data.texas.gov) from September 2024, read 21 November 2026, and TxDOT's legacy Tabulation of Bids pages for January 2020 to August 2024. The legacy pages are a large sample, not every contract: their file names were reused from year to year. Their district is the one TxDOT gives the county. Bids that did not match their published total are left out.
Every contract let that day: TxDOT letting of September 4, 2025. Compiled by Mirage Metrics.
Your own bid history, read the same way
Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.