TxDOT contract A00199639 bid tabulation

Seal Coat, FM 713 (FM 20 to FM 86). Let by Texas DOT on September 4, 2025, Caldwell, Austin District. 6 bids received; low bid $2,233,729 by Lone Star Paving Company, -21% against the engineer's estimate of $2,839,355.

Owner
Texas DOT
Letting
04 SEP 2025
Pay items
44
Data through
19 NOV 2026

Bidders

RankBidderTotal bidAgainst the low bidAgainst the estimate
1Lone Star Paving Company$2,233,729Low-21%
2Hunter Industries, LTD.$2,266,960+1.0%-20%
3Dean Word Company, LTD.$2,499,719+12%-12%
4Texas Materials Group, Inc.$2,594,501+16%-9.0%
5LCR Total Transport LLC$2,795,642+25%-2.0%
6Grey Sky Construction LLC$4,056,970+82%+43%
TxDOT contract A00199639: bids by rank

Engineer's estimate: $2,839,355.

Bid tabulation

LinePay itemUnitQuantityEstimate1. Lone Star Paving Company2. Hunter Industries, LTD.3. Dean Word Company, LTD.4. Texas Materials Group, Inc.5. LCR Total Transport LLC6. Grey Sky Construction LLC
1Backfill (type A) (134-7001)STA550$159.76$54.75$115.50$129.00$150.00$205.00$250.00
2Asphalt (AC-15P, AC-20-5TR or AC-20XP) (316-7071)GAL61,227$4.75$3.25$4.01$4.05$4.82$4.40$5.00
3Aggregate (type-PD, GR-4)(sac-B) (316-7224)CY1,501$110.00$62.75$102.95$111.00$108.00$150.00$250.00
4HMCL ACP type-D AC-1.5 (334-7033)TON169$145.00$88.25$111.10$106.00$115.00$281.00$250.00
5D-GR HMA type D PG76-22 (level-UP) (341-7059)TON6,438$123.36$109.00$91.30$106.00$112.00$110.00$180.00
6Flexible pavement structure repair(4") (351-7003)SY18,000$30.83$27.00$24.93$27.75$31.00$34.25$40.00
7Flexible pavement structure repair(6") (351-7005)SY4,000$44.71$43.75$37.39$44.00$44.50$47.00$60.00
8Mobilization (500-7001)LS1$211,563$51,000$138,581$95,000$70,000$113,000$300,000
9Barricades, signs and traffic handling (502-7001)MO3$5,251.16$9,250.00$4,614.15$16,000$15,000$2,460.00$15,000
10Portable changeable message sign (503-7002)EACH4$5,741.00$5,850.00$7,602.96$5,000.00$3,500.00$4,000.00$20,000
11TMA (stationary) (505-7001)DAY46$108.89$300.00$152.06$350.00$200.00$290.00$250.00
12TMA (mobile operation) (505-7003)DAY56$190.22$100.00$253.43$400.00$10.00$300.00$55.00
13Biodegradable erosion control logs (install) (6") (506-7042)LF100$2.25$4.50$12.50$5.00$5.00$6.50$10.00
14Biodegradable erosion control logs (remove) (506-7046)LF100$1.26$0.35$7.50$0.50$5.00$2.00$5.00
15Mill rumble strips (asphalt) (centerline) (533-7002)LF54,897$0.69$0.25$0.23$0.10$0.12$0.20$0.50
16Metal W-beam guard fence (timber post) (540-7001)LF2,650$30.75$21.55$21.00$23.25$28.00$27.50$30.00
17Metal beam guard fence trans (thrie-beam) (540-7005)EACH2$2,300.00$1,565.00$2,025.00$2,800.50$3,250.00$2,370.00$1,850.00
18Metal beam guard fence trans (T6) (540-7008)EACH6$645.00$625.00$695.50$1,500.00$842.00$1,850.00
19TL-3 31" short radius (complete) (540-7039)EACH1$8,766.43$24,875$24,250$26,982$25,000$27,400$30,000
20Remove metal beam guard fence (542-7001)LF2,825$4.41$2.05$2.00$2.25$3.00$2.75$5.00
21Guardrail end treatment (install) (544-7001)EACH25$3,641.00$2,975.00$2,900.00$3,226.75$3,000.00$3,260.00$3,850.00
22Guardrail end treatment (remove) (544-7003)EACH25$268.00$360.00$350.00$389.50$300.00$263.00$1,500.00
23Install delineator assembly (D-SW)SZ 1(BRF)GF2 (658-7018)EACH49$41.22$29.75$28.95$32.25$35.00$23.00$100.00
24Work zone pavement marking non-removing (W)6"(solid) (662-7008)LF190,495$0.24$0.14$0.20$0.25$0.14$0.15$0.50
25Work zone pavement marking non-removing (W)8"(solid) (662-7012)LF210$0.40$0.50$0.50$0.40$0.45$3.00
26Work zone pavement marking non-removing (W)24"(solid) (662-7017)LF175$2.58$2.00$3.00$3.25$2.00$2.10$20.00
27Work zone pavement marking non-removing (W)(arrow) (662-7018)EACH2$40.00$50.00$55.75$40.00$42.00$250.00
28Work zone pavement marking non-removing(W)(word) (662-7030)EACH2$40.00$50.00$55.75$40.00$42.00$500.00
29Work zone pavement marking non-removing(W)36"(yld tri) (662-7032)EACH14$35.00$10.00$25.00$27.75$10.00$11.00$150.00
30Work zone pavement marking non-removing (Y)6"(broken) (662-7036)LF12,633$0.30$0.20$0.25$0.25$0.20$0.25$1.00
31Work zone pavement marking non-removing (Y)6"(solid) (662-7038)LF129,101$0.30$0.18$0.20$0.25$0.18$0.20$0.50
32Work zone pavement marking SHT terminal (tab)type Y (662-7113)EACH3,781$1.63$1.00$1.63$2.25$1.75$2.40$6.00
33Reflectorized pavement marking type I (W)8"(solid)(100MIL) (666-7024)LF105$1.10$1.25$1.50$1.10$1.15$6.00
34Reflectorized pavement marking type I (W)24"(solid)(100MIL) (666-7036)LF145$8.50$20.00$11.00$12.25$20.00$21.00$20.00
35Reflectorized pavement marking type I (W)(arrow)(100MIL) (666-7042)EACH1$300.00$200.00$222.50$300.00$316.00$250.00
36Reflectorized pavement marking type I (W)(word)(100MIL) (666-7066)EACH1$350.00$250.00$278.25$350.00$370.00$500.00
37Ref pavement marking type I(W)36"(yld tri)(100MIL) (666-7090)EACH7$51.56$45.00$55.00$61.25$45.00$47.00$150.00
38Reflectorized profile pavement marking type I(W)6"(solid)(100MIL) (666-7266)LF108,637$0.70$0.94$0.66$0.75$0.94$1.00$0.50
39Reflectorized pavement marking type I (Y)6"(broken)(100MIL) (666-7420)LF7,332$0.50$0.56$0.59$0.75$0.56$0.60$0.50
40Reflectorized pavement marking type I (Y)6"(solid)(100MIL) (666-7423)LF73,724$0.50$0.51$0.54$0.54$0.51$0.55$0.50
41PRFB rumble strip (BLK)(4')(transverse) (668-7001)LF88$18.48$21.50$15.00$27.50$21.50$23.00$50.00
42Reflectorized pavement marker type I-C (672-7002)EACH5$12.50$3.89$4.25$12.50$13.00$6.00
43Reflectorized pavement marker type II-A-A (672-7004)EACH1,288$4.10$4.10$3.79$0.50$4.10$4.50$6.00
44Bonding course (3007-7001)GAL1,621$3.37$3.35$2.97$5.25$6.00$6.00$10.00
TxDOT contract A00199639: unit prices by line

The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.

Source

Read from TxDOT's tabulation for this contract. TxDOT Bid Tabulations open-data export (data.texas.gov) from September 2024, read 21 November 2026, and TxDOT's legacy Tabulation of Bids pages for January 2020 to August 2024. The legacy pages are a large sample, not every contract: their file names were reused from year to year. Their district is the one TxDOT gives the county. Bids that did not match their published total are left out.

Every contract let that day: TxDOT letting of September 4, 2025. Compiled by Mirage Metrics.

Your own bid history, read the same way

Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.

We use your email to reply to you and, now and then, to tell you about Mirage. You can opt out at any time. Privacy policy