TxDOT contract A00214550 bid tabulation
Bridge Maintenance, US 90 (BEGIN PECOS RIVER BRIDGE to END PECOS RIVER BRIDGE). Let by Texas DOT on September 4, 2025, Val Verde, Laredo District. 3 bids received; low bid $138,550 by Taylor Bridge LLC, -44% against the engineer's estimate of $247,660.
- Owner
- Texas DOT
- Letting
- 04 SEP 2025
- Pay items
- 9
- Data through
- 19 NOV 2026
Bidders
| Rank | Bidder | Total bid | Against the low bid | Against the estimate |
|---|---|---|---|---|
| 1 | Taylor Bridge LLC | $138,550 | Low | -44% |
| 2 | Gibson & Associates, Inc. | $139,490 | +1.0% | -44% |
| 3 | Newton Diversified LLC | $267,000 | +93% | +8.0% |
Engineer's estimate: $247,660.
Bid tabulation
| Line | Pay item | Unit | Quantity | Estimate | 1. Taylor Bridge LLC | 2. Gibson & Associates, Inc. | 3. Newton Diversified LLC |
|---|---|---|---|---|---|---|---|
| 1 | STR steel (miscellaneous bridge) (442-7008) | LB | 930 | $50.00 | $35.00 | $18.00 | $70.00 |
| 2 | Adjust steel shoes (499-7001) | EACH | 2 | $55,000 | $25,000 | $31,500 | $45,750 |
| 3 | Mobilization (500-7001) | LS | 1 | $21,700 | $25,000 | $22,500 | $105,770 |
| 4 | Barricades, signs and traffic handling (502-7001) | MO | 1 | $10,000 | $8,000.00 | $15,000 | $1.00 |
| 5 | Portable changeable message sign (503-7002) | EACH | 4 | $12,000 | $2,500.00 | $2,400.00 | $1.00 |
| 6 | One-way traffic control (pilot car) (510-7002) | HR | 4 | $115.00 | $250.00 | $325.00 | $1.00 |
| 7 | One-way traffic control (port traffic signal) (510-7003) | MO | 1 | $8,500.00 | $5,000.00 | $5,500.00 | $1.00 |
| 8 | Concrete curb (type II) (529-7002) | LF | 10 | $100.00 | $500.00 | $285.00 | $162.00 |
| 9 | Bent cap/abutment cap cleaning (7001-7002) | EACH | 1 | $1,500.00 | $2,000.00 | $3,000.00 | $3,000.00 |
The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.
Source
Read from TxDOT's tabulation for this contract. TxDOT Bid Tabulations open-data export (data.texas.gov) from September 2024, read 21 November 2026, and TxDOT's legacy Tabulation of Bids pages for January 2020 to August 2024. The legacy pages are a large sample, not every contract: their file names were reused from year to year. Their district is the one TxDOT gives the county. Bids that did not match their published total are left out.
Every contract let that day: TxDOT letting of September 4, 2025. Compiled by Mirage Metrics.