TxDOT contract A00198364 bid tabulation

Landscape Development, SH 242 (FM 1488 to East of IH 45). Let by Texas DOT on May 7, 2026, Montgomery, Houston District. 7 bids received; low bid $1,579,083 by Central North Construction, LLC, -29% against the engineer's estimate of $2,218,949.

Owner
Texas DOT
Letting
07 MAY 2026
Pay items
38
Data through
19 NOV 2026

Bidders

RankBidderTotal bidAgainst the low bidAgainst the estimate
1Central North Construction, LLC$1,579,083Low-29%
2Apex Landscape & Irrigation, LLC$1,684,152+7.0%-24%
3Tight Line Construction, LLC$1,685,692+7.0%-24%
4Yellowstone Landscape - Central, Inc.$1,753,926+11%-21%
5Green Sage Services LLC$1,762,560+12%-21%
6Abescape Landscaping, LLC$2,049,418+30%-8.0%
7Texas Wall & Landscape$2,052,617+30%-7.0%
TxDOT contract A00198364: bids by rank

Engineer's estimate: $2,218,949.

Bid tabulation

LinePay itemUnitQuantityEstimate1. Central North Construction, LLC2. Apex Landscape & Irrigation, LLC3. Tight Line Construction, LLC4. Yellowstone Landscape - Central, Inc.5. Green Sage Services LLC6. Abescape Landscaping, LLC
1Preparation row (tree remove) (0"-12" diameter) (100-7003)EACH5$500.00$100.00$150.00$550.00$1,159.86$400.00$300.00
2Preparation row (tree remove) (12"-24" diameter) (100-7004)EACH3$800.00$200.00$150.00$1,500.00$2,731.07$600.00$750.00
3Preparation row (tree remove) (24"-36" diameter) (100-7005)EACH2$1,300.00$300.00$150.00$3,000.00$4,096.60$1,000.00$90.00
4Furn & place topsoil (vehicle) (160-7007)CY240.38$66.00$29.00$50.00$52.00$59.61$44.00$30.00
5Erosion control compost (vehicle) (161-7008)CY1,325$40.00$19.00$20.00$21.00$24.17$28.00$28.00
6General use compost (vehicle) (161-7010)CY2,602$37.00$19.00$20.00$21.00$22.03$27.00$25.00
7Block sodding (162-7002)SY18,682$5.20$2.75$1.25$4.25$5.41$4.65$3.50
8Fertilizer (166-7001)ACRE3.86$1,300.00$500.00$500.00$1,150.00$1,310.24$1,000.00$900.00
9Vegetative watering (168-7001)TGL463.40$60.00$18.00$1.00$1.00$36.38$45.00$30.00
10Irrigation system (type I) (170-7002)EACH1$130,000$491,327$310,000$225,000$223,052$115,000$354,047
11Mulch (192-7001)CY3,895$60.00$30.00$28.00$28.00$24.00$56.00$30.00
12Soil amend (type I) (192-7008)SY46,772$0.90$0.75$0.40$0.75$0.40$0.45$0.50
13Plant bed preparation (type III) (192-7012)SY46,722$2.85$1.00$0.50$2.00$0.45$1.20$2.00
14Landscape edge (concrete) (192-7021)LF1,294$21.25$42.00$26.00$30.00$18.00$30.00$25.00
15Plant material (1 gal) (192-7026)EACH4,133$9.50$5.00$8.00$7.50$8.16$5.45$5.50
16Plant material (15 gal) (192-7030)EACH905$175.00$110.00$130.00$150.00$111.77$155.00$185.00
17Plant material (30 gal) (192-7031)EACH226$275.00$200.00$290.00$285.00$238.70$330.00$200.00
18Plant material (45 gal) (192-7032)EACH283$565.00$320.00$540.00$425.00$336.57$460.00$500.00
19Plant material (15 gal) (tree) (192-7037)EACH186$175.00$110.00$120.00$150.00$143.21$150.00$120.00
20Plant material (30 gal) (tree) (192-7039)EACH253$275.00$200.00$280.00$285.00$293.19$330.00$200.00
21Plant material (45 gal) (tree) (192-7040)EACH189$565.00$320.00$540.00$425.00$374.63$450.00$325.00
22Soil amend (type II) (192-7084)SY46,772$1.40$0.50$0.30$0.75$0.14$0.45$0.85
23Landscape establish (193-7002)CYC2$7,800.00$25,000$10,000$30,000$42,146$20,000$12,000
24Landscape treat (type I) (193-7023)EACH2,042$1.50$0.95$0.75$2.50$1.07$1.50$1.00
25Landscape treat (type II) (193-7024)EACH7,382$0.85$0.95$0.75$1.25$0.32$1.20$1.00
26Landscape treat (type III) (193-7028)EACH6,175$0.85$0.95$1.00$2.00$3.19$0.90$3.00
27Landscape treat (type VI) (193-7031)EACH136$750.00$75.00$90.00$75.00$156.19$200.00$185.00
28Landscape treat (type VII) (193-7032)EACH283$55.00$35.00$105.00$25.00$44.68$42.00$30.00
29Landscape treat (type VIII) (193-7033)EACH1,131$45.00$29.00$85.00$15.00$23.85$28.00$25.00
30Landscape treat (type X) (193-7035)EACH1,414$1.25$2.00$10.00$3.00$7.75$1.50$1.00
31Landscape treat (type III) (193-7036)CYC2$7,800.00$4,500.00$10,000$40,000$36,246$15,000$8,500.00
32Landscape treat (type VII) (193-7040)CYC148$308.00$300.00$450.00$150.00$136.69$680.00$750.00
33Mobilization (500-7001)LS1$212,719$75,000$165,000$150,000$158,842$80,000$218,016
34Barricades, signs and traffic handling (502-7001)MO6$5,750.00$4,500.00$9,000.00$3,000.00$4,456.25$5,000.00$10,000
35TMA (stationary) (505-7001)DAY100$900.00$5.00$5.00$250.00$1,196.95$680.00$950.00
36TMA (mobile operation) (505-7003)DAY65$750.00$15.00$5.00$1.00$1,193.06$690.00$950.00
37Biodegradable erosion control logs (install) (8") (506-7043)LF1,500$4.50$0.50$0.65$2.00$4.50$5.00$2.50
38Biodegradable erosion control logs (remove) (506-7046)LF1,500$1.00$0.50$0.25$1.00$0.33$1.20$0.35
TxDOT contract A00198364: unit prices by line, the 6 lowest bidders (all in the CSV)

The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.

Source

Read from TxDOT's tabulation for this contract. TxDOT Bid Tabulations open-data export (data.texas.gov) from September 2024, read 21 November 2026, and TxDOT's legacy Tabulation of Bids pages for January 2020 to August 2024. The legacy pages are a large sample, not every contract: their file names were reused from year to year. Their district is the one TxDOT gives the county. Bids that did not match their published total are left out.

Every contract let that day: TxDOT letting of May 7, 2026. Compiled by Mirage Metrics.

Your own bid history, read the same way

Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.

We use your email to reply to you and, now and then, to tell you about Mirage. You can opt out at any time. Privacy policy