TxDOT contract A00198364 bid tabulation
Landscape Development, SH 242 (FM 1488 to East of IH 45). Let by Texas DOT on May 7, 2026, Montgomery, Houston District. 7 bids received; low bid $1,579,083 by Central North Construction, LLC, -29% against the engineer's estimate of $2,218,949.
- Owner
- Texas DOT
- Letting
- 07 MAY 2026
- Pay items
- 38
- Data through
- 19 NOV 2026
Bidders
| Rank | Bidder | Total bid | Against the low bid | Against the estimate |
|---|---|---|---|---|
| 1 | Central North Construction, LLC | $1,579,083 | Low | -29% |
| 2 | Apex Landscape & Irrigation, LLC | $1,684,152 | +7.0% | -24% |
| 3 | Tight Line Construction, LLC | $1,685,692 | +7.0% | -24% |
| 4 | Yellowstone Landscape - Central, Inc. | $1,753,926 | +11% | -21% |
| 5 | Green Sage Services LLC | $1,762,560 | +12% | -21% |
| 6 | Abescape Landscaping, LLC | $2,049,418 | +30% | -8.0% |
| 7 | Texas Wall & Landscape | $2,052,617 | +30% | -7.0% |
Engineer's estimate: $2,218,949.
Bid tabulation
| Line | Pay item | Unit | Quantity | Estimate | 1. Central North Construction, LLC | 2. Apex Landscape & Irrigation, LLC | 3. Tight Line Construction, LLC | 4. Yellowstone Landscape - Central, Inc. | 5. Green Sage Services LLC | 6. Abescape Landscaping, LLC |
|---|---|---|---|---|---|---|---|---|---|---|
| 1 | Preparation row (tree remove) (0"-12" diameter) (100-7003) | EACH | 5 | $500.00 | $100.00 | $150.00 | $550.00 | $1,159.86 | $400.00 | $300.00 |
| 2 | Preparation row (tree remove) (12"-24" diameter) (100-7004) | EACH | 3 | $800.00 | $200.00 | $150.00 | $1,500.00 | $2,731.07 | $600.00 | $750.00 |
| 3 | Preparation row (tree remove) (24"-36" diameter) (100-7005) | EACH | 2 | $1,300.00 | $300.00 | $150.00 | $3,000.00 | $4,096.60 | $1,000.00 | $90.00 |
| 4 | Furn & place topsoil (vehicle) (160-7007) | CY | 240.38 | $66.00 | $29.00 | $50.00 | $52.00 | $59.61 | $44.00 | $30.00 |
| 5 | Erosion control compost (vehicle) (161-7008) | CY | 1,325 | $40.00 | $19.00 | $20.00 | $21.00 | $24.17 | $28.00 | $28.00 |
| 6 | General use compost (vehicle) (161-7010) | CY | 2,602 | $37.00 | $19.00 | $20.00 | $21.00 | $22.03 | $27.00 | $25.00 |
| 7 | Block sodding (162-7002) | SY | 18,682 | $5.20 | $2.75 | $1.25 | $4.25 | $5.41 | $4.65 | $3.50 |
| 8 | Fertilizer (166-7001) | ACRE | 3.86 | $1,300.00 | $500.00 | $500.00 | $1,150.00 | $1,310.24 | $1,000.00 | $900.00 |
| 9 | Vegetative watering (168-7001) | TGL | 463.40 | $60.00 | $18.00 | $1.00 | $1.00 | $36.38 | $45.00 | $30.00 |
| 10 | Irrigation system (type I) (170-7002) | EACH | 1 | $130,000 | $491,327 | $310,000 | $225,000 | $223,052 | $115,000 | $354,047 |
| 11 | Mulch (192-7001) | CY | 3,895 | $60.00 | $30.00 | $28.00 | $28.00 | $24.00 | $56.00 | $30.00 |
| 12 | Soil amend (type I) (192-7008) | SY | 46,772 | $0.90 | $0.75 | $0.40 | $0.75 | $0.40 | $0.45 | $0.50 |
| 13 | Plant bed preparation (type III) (192-7012) | SY | 46,722 | $2.85 | $1.00 | $0.50 | $2.00 | $0.45 | $1.20 | $2.00 |
| 14 | Landscape edge (concrete) (192-7021) | LF | 1,294 | $21.25 | $42.00 | $26.00 | $30.00 | $18.00 | $30.00 | $25.00 |
| 15 | Plant material (1 gal) (192-7026) | EACH | 4,133 | $9.50 | $5.00 | $8.00 | $7.50 | $8.16 | $5.45 | $5.50 |
| 16 | Plant material (15 gal) (192-7030) | EACH | 905 | $175.00 | $110.00 | $130.00 | $150.00 | $111.77 | $155.00 | $185.00 |
| 17 | Plant material (30 gal) (192-7031) | EACH | 226 | $275.00 | $200.00 | $290.00 | $285.00 | $238.70 | $330.00 | $200.00 |
| 18 | Plant material (45 gal) (192-7032) | EACH | 283 | $565.00 | $320.00 | $540.00 | $425.00 | $336.57 | $460.00 | $500.00 |
| 19 | Plant material (15 gal) (tree) (192-7037) | EACH | 186 | $175.00 | $110.00 | $120.00 | $150.00 | $143.21 | $150.00 | $120.00 |
| 20 | Plant material (30 gal) (tree) (192-7039) | EACH | 253 | $275.00 | $200.00 | $280.00 | $285.00 | $293.19 | $330.00 | $200.00 |
| 21 | Plant material (45 gal) (tree) (192-7040) | EACH | 189 | $565.00 | $320.00 | $540.00 | $425.00 | $374.63 | $450.00 | $325.00 |
| 22 | Soil amend (type II) (192-7084) | SY | 46,772 | $1.40 | $0.50 | $0.30 | $0.75 | $0.14 | $0.45 | $0.85 |
| 23 | Landscape establish (193-7002) | CYC | 2 | $7,800.00 | $25,000 | $10,000 | $30,000 | $42,146 | $20,000 | $12,000 |
| 24 | Landscape treat (type I) (193-7023) | EACH | 2,042 | $1.50 | $0.95 | $0.75 | $2.50 | $1.07 | $1.50 | $1.00 |
| 25 | Landscape treat (type II) (193-7024) | EACH | 7,382 | $0.85 | $0.95 | $0.75 | $1.25 | $0.32 | $1.20 | $1.00 |
| 26 | Landscape treat (type III) (193-7028) | EACH | 6,175 | $0.85 | $0.95 | $1.00 | $2.00 | $3.19 | $0.90 | $3.00 |
| 27 | Landscape treat (type VI) (193-7031) | EACH | 136 | $750.00 | $75.00 | $90.00 | $75.00 | $156.19 | $200.00 | $185.00 |
| 28 | Landscape treat (type VII) (193-7032) | EACH | 283 | $55.00 | $35.00 | $105.00 | $25.00 | $44.68 | $42.00 | $30.00 |
| 29 | Landscape treat (type VIII) (193-7033) | EACH | 1,131 | $45.00 | $29.00 | $85.00 | $15.00 | $23.85 | $28.00 | $25.00 |
| 30 | Landscape treat (type X) (193-7035) | EACH | 1,414 | $1.25 | $2.00 | $10.00 | $3.00 | $7.75 | $1.50 | $1.00 |
| 31 | Landscape treat (type III) (193-7036) | CYC | 2 | $7,800.00 | $4,500.00 | $10,000 | $40,000 | $36,246 | $15,000 | $8,500.00 |
| 32 | Landscape treat (type VII) (193-7040) | CYC | 148 | $308.00 | $300.00 | $450.00 | $150.00 | $136.69 | $680.00 | $750.00 |
| 33 | Mobilization (500-7001) | LS | 1 | $212,719 | $75,000 | $165,000 | $150,000 | $158,842 | $80,000 | $218,016 |
| 34 | Barricades, signs and traffic handling (502-7001) | MO | 6 | $5,750.00 | $4,500.00 | $9,000.00 | $3,000.00 | $4,456.25 | $5,000.00 | $10,000 |
| 35 | TMA (stationary) (505-7001) | DAY | 100 | $900.00 | $5.00 | $5.00 | $250.00 | $1,196.95 | $680.00 | $950.00 |
| 36 | TMA (mobile operation) (505-7003) | DAY | 65 | $750.00 | $15.00 | $5.00 | $1.00 | $1,193.06 | $690.00 | $950.00 |
| 37 | Biodegradable erosion control logs (install) (8") (506-7043) | LF | 1,500 | $4.50 | $0.50 | $0.65 | $2.00 | $4.50 | $5.00 | $2.50 |
| 38 | Biodegradable erosion control logs (remove) (506-7046) | LF | 1,500 | $1.00 | $0.50 | $0.25 | $1.00 | $0.33 | $1.20 | $0.35 |
The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.
Source
Read from TxDOT's tabulation for this contract. TxDOT Bid Tabulations open-data export (data.texas.gov) from September 2024, read 21 November 2026, and TxDOT's legacy Tabulation of Bids pages for January 2020 to August 2024. The legacy pages are a large sample, not every contract: their file names were reused from year to year. Their district is the one TxDOT gives the county. Bids that did not match their published total are left out.
Every contract let that day: TxDOT letting of May 7, 2026. Compiled by Mirage Metrics.