TxDOT contract A00199263 bid tabulation
Landscape Development, IH 45 (Virginia Point Road to SH 87). Let by Texas DOT on April 8, 2026, Galveston, Houston District. 4 bids received; low bid $3,185,937 by Yellowstone Landscape - Central, Inc., -18% against the engineer's estimate of $3,887,385.
- Owner
- Texas DOT
- Letting
- 08 APR 2026
- Pay items
- 69
- Data through
- 19 NOV 2026
Bidders
| Rank | Bidder | Total bid | Against the low bid | Against the estimate |
|---|---|---|---|---|
| 1 | Yellowstone Landscape - Central, Inc. | $3,185,937 | Low | -18% |
| 2 | Central North Construction, LLC | $3,281,000 | +3.0% | -16% |
| 3 | Apex Landscape & Irrigation, LLC | $3,377,776 | +6.0% | -13% |
| 4 | Green Sage Services LLC | $3,708,062 | +16% | -5.0% |
Engineer's estimate: $3,887,385.
Bid tabulation
| Line | Pay item | Unit | Quantity | Estimate | 1. Yellowstone Landscape - Central, Inc. | 2. Central North Construction, LLC | 3. Apex Landscape & Irrigation, LLC | 4. Green Sage Services LLC |
|---|---|---|---|---|---|---|---|---|
| 1 | Preparing row (100-7001) | ACRE | 7.77 | $11,170 | $16,731 | $1,300.00 | $7,500.00 | $7,000.00 |
| 2 | Preparation row (tree remove) (12"-24" diameter) (100-7004) | EACH | 93 | $867.00 | $430.11 | $275.00 | $800.00 | $500.00 |
| 3 | Preparation row (tree prune and trim) (100-7009) | ACRE | 0.55 | $4,545.46 | $3,000.00 | $12,850 | $5,500.00 | |
| 4 | Preparation row (hand clearing) (100-7011) | ACRE | 0.20 | $12,500 | $2,500.00 | $10,000 | $8,500.00 | |
| 5 | Removing concrete (riprap) (104-7006) | SY | 261.65 | $17.84 | $12.00 | $20.00 | $36.80 | |
| 6 | Removing concrete (miscellaneous) (104-7046) | SY | 2,540 | $5.25 | $12.00 | $7.00 | $35.00 | |
| 7 | Spec excavation work (original) (158-7004) | CY | 500 | $183.33 | $12.00 | $20.00 | $40.00 | |
| 8 | Spec excavation work (vehicle) (158-7005) | CY | 101.30 | $193.32 | $12.00 | $50.00 | $40.00 | |
| 9 | Furn & place topsoil (vehicle) (160-7007) | CY | 1,494.34 | $57.00 | $54.65 | $35.00 | $70.00 | $44.00 |
| 10 | Erosion control compost (vehicle) (161-7008) | CY | 1,441 | $46.00 | $37.01 | $17.00 | $25.00 | $27.00 |
| 11 | General use compost (vehicle) (161-7010) | CY | 684 | $46.00 | $60.92 | $21.00 | $25.00 | $29.00 |
| 12 | Block sodding (162-7002) | SY | 22,178.20 | $5.25 | $5.34 | $3.75 | $5.40 | $4.70 |
| 13 | Fertilizer (166-7001) | ACRE | 4.58 | $446.25 | $1,163.72 | $550.00 | $850.00 | $950.00 |
| 14 | Vegetative watering (168-7001) | TGL | 549.80 | $45.00 | $39.41 | $18.00 | $35.00 | $50.00 |
| 15 | Irrigation system (type I) (170-7002) | EACH | 1 | $10,000 | $20,000 | $70,000 | $110,000 | |
| 16 | Irrigation system (type II) (170-7003) | EACH | 1 | $31,296 | $20,000 | $30,000 | $22,000 | |
| 17 | Irrigation system (type III) (170-7004) | EACH | 1 | $7,500.00 | $20,000 | $30,000 | $15,000 | |
| 18 | Soil amend (192-7007) | SY | 1,287 | $0.26 | $1.00 | $1.00 | $1.50 | |
| 19 | Soil amend (type I) (192-7008) | SY | 1,707 | $0.41 | $1.00 | $0.40 | $1.00 | |
| 20 | Plant bed preparation (type I) (192-7010) | SY | 4,956.20 | $0.27 | $2.50 | $1.25 | $4.50 | |
| 21 | Plant bed preparation (type II) (192-7011) | SY | 14 | $1.19 | $5.00 | $0.75 | $8.00 | |
| 22 | Plant bed preparation (type III) (192-7012) | SY | 7,308 | $2.00 | $0.46 | $3.50 | $1.25 | $4.50 |
| 23 | Landscape edge (type I) (192-7017) | LF | 4,264 | $10.94 | $8.00 | $7.00 | $13.00 | |
| 24 | Loose aggregate GRND cover (type I) (192-7024) | CY | 166 | $652.61 | $275.00 | $950.00 | $300.00 | |
| 25 | Plant material (30 gal) (tree) (192-7039) | EACH | 6 | $168.06 | $275.00 | $230.00 | $350.00 | |
| 26 | Plant material (45 gal) (tree) (192-7040) | EACH | 57 | $438.60 | $600.00 | $550.00 | $380.00 | |
| 27 | Plant material (65 gal) (tree) (192-7041) | EACH | 42 | $672.62 | $700.00 | $720.00 | $590.00 | |
| 28 | Plant material (3 gal) (shrub) (192-7046) | EACH | 4,685 | $40.00 | $18.50 | $21.00 | $30.00 | $27.00 |
| 29 | Plant material (min 14' TRNK HT)(palm) (192-7068) | EACH | 275 | $1,270.00 | $1,278.79 | $2,000.00 | $680.00 | $650.00 |
| 30 | Soil amend (type II) (192-7084) | SY | 1,707 | $0.14 | $2.00 | $0.30 | $2.50 | |
| 31 | Landscape establish (193-7001) | MO | 12 | $10,400 | $6,652.78 | $5,800.00 | $4,000.00 | $12,000 |
| 32 | Landscape establish (193-7002) | CYC | 4 | $14,300 | $1,458.33 | $5,700.00 | $35,000 | $28,050 |
| 33 | Irrig sys oper and maintenance (193-7007) | MO | 12 | $5,200.00 | $2,638.89 | $5,000.00 | $5,000.00 | $2,500.00 |
| 34 | Landscape treat (193-7021) | EACH | 275 | $125.00 | $242.42 | $80.00 | $80.00 | $60.00 |
| 35 | Landscape treat (193-7022) | CYC | 1 | $26,000 | $3,833.33 | $8,000.00 | $30,000 | $8,000.00 |
| 36 | Landscape treat (type I) (193-7023) | EACH | 105 | $1.08 | $4.00 | $4.00 | $6.00 | |
| 37 | Landscape treat (type II) (193-7024) | EACH | 315 | $0.34 | $4.00 | $4.00 | $5.00 | |
| 38 | Landscape treat (type I) (193-7025) | CYC | 1 | $52,000 | $11,458 | $25,000 | $30,000 | $45,000 |
| 39 | Landscape treat (type II) (193-7026) | CYC | 2 | $11,700 | $5,145.83 | $4,000.00 | $22,500 | $21,000 |
| 40 | Landscape treat (type III) (193-7028) | EACH | 4,790 | $2.95 | $0.35 | $1.50 | $1.00 | $4.00 |
| 41 | Landscape treat (type IV) (193-7029) | EACH | 93 | $71.69 | $50.00 | $150.00 | $50.00 | |
| 42 | Landscape treat (type V) (193-7030) | EACH | 130 | $65.00 | $102.56 | $50.00 | $170.00 | $200.00 |
| 43 | Landscape treat (type VI) (193-7031) | EACH | 60 | $472.22 | $300.00 | $450.00 | $350.00 | |
| 44 | Landscape treat (type VII) (193-7032) | EACH | 63 | $29.10 | $50.00 | $45.00 | $40.00 | |
| 45 | Landscape treat (type VIII) (193-7033) | EACH | 42 | $47.62 | $60.00 | $50.00 | $55.00 | |
| 46 | Landscape treat (type IX) (193-7034) | EACH | 105 | $14.29 | $15.00 | $75.00 | $250.00 | |
| 47 | Landscape treat (type X) (193-7035) | EACH | 105 | $15.87 | $15.00 | $10.00 | $20.00 | |
| 48 | Landscape treat (type III) (193-7036) | CYC | 3 | $26,000 | $3,888.89 | $18,000 | $50,000 | $11,000 |
| 49 | Landscape treat (type IV) (193-7037) | CYC | 1 | $13,000 | $21,625 | $42,000 | $7,500.00 | $18,000 |
| 50 | Landscape treat (type V) (193-7038) | CYC | 1 | $11,700 | $16,625 | $15,000 | $7,500.00 | $8,500.00 |
| 51 | Landscape treat (type VI) (193-7039) | CYC | 1 | $3,295.00 | $20,000 | $3,500.00 | $7,500.00 | |
| 52 | Landscape treat (type VII) (193-7040) | CYC | 96 | $850.00 | $625.00 | $500.00 | $700.00 | $1,200.00 |
| 53 | Rdside amenity (194-7011) | EACH | 25 | $133.33 | $150.00 | $750.00 | $400.00 | |
| 54 | Rdside amenity (removing & reset) (194-7020) | EACH | 1 | $5,833.33 | $250.00 | $2,000.00 | $2,500.00 | |
| 55 | Concrete paint finish (427-7002) | SF | 57,489 | $0.35 | $3.00 | $3.00 | $3.25 | |
| 56 | Exposed aggregate finish (427-7006) | SF | 57,489 | $1.70 | $4.00 | $4.00 | $4.15 | |
| 57 | Riprap (concrete)(5 in) (432-7002) | CY | 1,185 | $750.14 | $600.00 | $530.00 | $560.00 | |
| 58 | Riprap (concrete)(6 in) (432-7003) | CY | 8 | $803.33 | $600.00 | $500.00 | $1,550.00 | |
| 59 | Mobilization (500-7001) | LS | 1 | $344,130 | $190,876 | $135,000 | $143,350 | $180,000 |
| 60 | Barricades, signs and traffic handling (502-7001) | MO | 12 | $8,500.00 | $2,388.89 | $4,500.00 | $5,000.00 | $5,500.00 |
| 61 | TMA (stationary) (505-7001) | DAY | 260 | $900.00 | $384.62 | $200.00 | $10.00 | $660.00 |
| 62 | TMA (mobile operation) (505-7003) | DAY | 90 | $800.00 | $388.89 | $240.00 | $10.00 | $730.00 |
| 63 | Biodegradable erosion control logs (install) (8") (506-7043) | LF | 3,520 | $5.50 | $4.26 | $3.00 | $1.35 | $5.00 |
| 64 | Biodegradable erosion control logs (remove) (506-7046) | LF | 3,520 | $1.40 | $0.31 | $1.00 | $0.25 | $1.20 |
| 65 | Remove and relay pavers (528-7003) | SY | 2,540 | $29.53 | $105.00 | $75.00 | $92.00 | |
| 66 | Install small roadside sign support and assembly type 10BWG(1)SB(P) (644-7009) | EACH | 10 | $700.00 | $865.00 | $900.00 | $880.00 | |
| 67 | Install small roadside sign support and assembly type 10BWG(1)SB(T) (644-7012) | EACH | 1 | $858.33 | $859.00 | $1,000.00 | $1,050.00 | |
| 68 | Remove SM RD SN sup&AM (644-7073) | EACH | 10 | $103.33 | $130.00 | $900.00 | $125.00 | |
| 69 | Install OM SM RD sign (1-OM-type 1)Y (658-7088) | EACH | 1 | $98.33 | $99.86 | $150.00 | $150.00 |
The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.
Source
Read from TxDOT's tabulation for this contract. TxDOT Bid Tabulations open-data export (data.texas.gov) from September 2024, read 21 November 2026, and TxDOT's legacy Tabulation of Bids pages for January 2020 to August 2024. The legacy pages are a large sample, not every contract: their file names were reused from year to year. Their district is the one TxDOT gives the county. Bids that did not match their published total are left out.
Every contract let that day: TxDOT letting of April 8, 2026. Compiled by Mirage Metrics.