TxDOT contract A00210034 bid tabulation
Signal Improvements,Leds & Gps Clocks, Various (Various locations Districwide to .). Let by Texas DOT on July 1, 2026, Travis, Austin District. 5 bids received; low bid $2,047,797 by E-Z Bel Construction, LLC, -14% against the engineer's estimate of $2,376,788.
- Owner
- Texas DOT
- Letting
- 01 JUL 2026
- Pay items
- 151
- Data through
- 19 NOV 2026
Bidders
| Rank | Bidder | Total bid | Against the low bid | Against the estimate |
|---|---|---|---|---|
| 1 | E-Z Bel Construction, LLC | $2,047,797 | Low | -14% |
| 2 | Elecnor Belco Electric, Inc. | $2,415,474 | +18% | +2.0% |
| 3 | The Levy Company, Inc. | $2,418,229 | +18% | +2.0% |
| 4 | Austin Traffic Signal Construction Co., Inc. | $2,562,107 | +25% | +8.0% |
| 5 | Jasco | $2,771,448 | +35% | +17% |
Engineer's estimate: $2,376,788.
Bid tabulation
| Line | Pay item | Unit | Quantity | Estimate | 1. E-Z Bel Construction, LLC | 2. Elecnor Belco Electric, Inc. | 3. The Levy Company, Inc. | 4. Austin Traffic Signal Construction Co., Inc. | 5. Jasco |
|---|---|---|---|---|---|---|---|---|---|
| 1 | Removing concrete (medians) (104-7008) | SY | 97 | $16.00 | $5.00 | $29.00 | $101.00 | $250.00 | $50.00 |
| 2 | Removing concrete (curb or curb & gutter) (104-7018) | LF | 31 | $15.00 | $5.00 | $4.00 | $110.00 | $220.00 | $30.00 |
| 3 | Remove (12"-16") TRT/untrt base & asphalt pavement (105-7012) | SY | 120 | $15.00 | $25.00 | $83.00 | $56.00 | $265.00 | $30.00 |
| 4 | Remove (19") TRT/untrt base & asphalt pavement (105-7039) | SY | 470 | $10.00 | $30.00 | $101.00 | $43.00 | $255.00 | $30.00 |
| 5 | Embankment (final)(OC)(type B) (132-7003) | CY | 27 | $10.00 | $250.00 | $88.00 | $145.00 | $900.00 | $60.00 |
| 6 | Furn & place topsoil (4") (160-7002) | SY | 95 | $2.00 | $20.00 | $13.00 | $34.00 | $34.00 | $30.00 |
| 7 | Block sodding (162-7002) | SY | 381 | $10.00 | $15.00 | $8.30 | $15.00 | $15.00 | $10.00 |
| 8 | Flexible pavement structure repair(19") (351-7018) | SY | 31 | $130.00 | $300.00 | $621.00 | $379.00 | $500.00 | $2,500.00 |
| 9 | Drilled shaft (roadway illumination pole) (30 in) (416-7040) | LF | 10 | $300.00 | $250.00 | $385.00 | $351.22 | $185.00 | $350.00 |
| 10 | Drilled shaft (traffic signal pole) (30 in) (416-7043) | LF | 55 | $300.00 | $350.00 | $390.00 | $305.23 | $185.00 | $350.00 |
| 11 | Drilled shaft (traffic signal pole) (36 in) (416-7044) | LF | 208 | $375.00 | $375.00 | $414.00 | $351.74 | $350.00 | $430.00 |
| 12 | Drilled shaft (traffic signal pole) (42 in) (416-7045) | LF | 16 | $500.00 | $525.00 | $455.00 | $545.52 | $583.00 | $450.00 |
| 13 | Drilled shaft (traffic signal pole) (48 in) (416-7046) | LF | 130 | $550.00 | $525.00 | $479.00 | $576.15 | $650.00 | $650.00 |
| 14 | Mobilization (500-7001) | LS | 1 | $176,000 | $99,600 | $127,300 | $241,823 | $136,000 | $100,000 |
| 15 | Barricades, signs and traffic handling (502-7001) | MO | 16 | $5,000.00 | $2,500.00 | $4,568.00 | $5,406.52 | $2,500.00 | $2,500.00 |
| 16 | Portable changeable message sign (503-7001) | DAY | 336 | $125.00 | $50.00 | $94.00 | $57.77 | $75.00 | $135.00 |
| 17 | TMA (stationary) (505-7001) | DAY | 25 | $275.00 | $600.00 | $84.00 | $59.10 | $300.00 | $250.00 |
| 18 | TMA (mobile operation) (505-7002) | HR | 64 | $250.00 | $0.01 | $3.50 | $7.39 | $68.00 | $85.00 |
| 19 | Biodegradable erosion control logs (install) (12") (506-7044) | LF | 700 | $10.00 | $2.00 | $5.30 | $5.96 | $8.00 | $7.00 |
| 20 | Biodegradable erosion control logs (remove) (506-7046) | LF | 700 | $2.00 | $1.00 | $1.10 | $2.20 | $1.00 | $2.00 |
| 21 | Concrete curb & gutter (type II) (529-7009) | LF | 171 | $30.00 | $50.00 | $29.00 | $52.00 | $72.00 | $45.00 |
| 22 | Concrete curb (ribbon) (529-7028) | LF | 654 | $35.00 | $50.00 | $29.00 | $33.00 | $46.00 | $10.00 |
| 23 | Concrete sidewalks (5") (531-7002) | SY | 875 | $80.00 | $75.00 | $74.00 | $102.00 | $125.00 | $135.00 |
| 24 | Curb ramps (type 7) (531-7010) | EACH | 2 | $2,100.00 | $3,000.00 | $2,364.00 | $2,463.00 | $3,000.00 | $2,765.00 |
| 25 | Curb ramps (type 22) (531-7014) | EACH | 1 | $3,800.00 | $4,000.00 | $3,310.00 | $3,917.00 | $4,500.00 | $4,444.00 |
| 26 | Curb ramps (type 5) (531-7018) | SY | 22 | $250.00 | $400.00 | $213.00 | $336.00 | $400.00 | $550.00 |
| 27 | Curb ramps (type 7) (sup) (531-7032) | EACH | 12 | $3,500.00 | $4,000.00 | $2,364.00 | $2,501.00 | $3,000.00 | $2,500.00 |
| 28 | Relocate RD IL asm (trans-base) (610-7004) | EACH | 1 | $3,300.00 | $2,500.00 | $2,548.00 | $2,507.94 | $2,300.00 | $3,100.00 |
| 29 | Conduit (PVC) (schedule 40) (2") (618-7030) | LF | 1,955 | $11.00 | $15.00 | $18.00 | $9.68 | $10.00 | $17.50 |
| 30 | Conduit (PVC) (schedule 40) (2") (bore) (618-7031) | LF | 40 | $30.00 | $30.00 | $23.00 | $42.75 | $40.00 | $26.75 |
| 31 | Conduit (PVC) (schedule 40) (3") (618-7036) | LF | 5,355 | $15.50 | $17.00 | $21.00 | $14.00 | $15.00 | $21.00 |
| 32 | Conduit (PVC) (schedule 40) (3") (bore) (618-7037) | LF | 1,365 | $33.00 | $30.00 | $25.00 | $24.95 | $43.00 | $29.60 |
| 33 | Conduit (PVC) (schedule 40) (4") (618-7040) | LF | 270 | $25.00 | $20.00 | $28.00 | $30.46 | $35.00 | $26.75 |
| 34 | Conduit (PVC) (schedule 80) (3") (bore) (618-7061) | LF | 5,145 | $30.00 | $30.00 | $27.00 | $24.51 | $45.00 | $29.60 |
| 35 | Electrical conductor (no.8) bare (620-7007) | LF | 9,075 | $2.10 | $1.25 | $1.80 | $1.92 | $1.30 | $1.75 |
| 36 | Electrical conductor (no.8) insulated (620-7008) | LF | 14,370 | $2.05 | $1.50 | $1.80 | $2.03 | $1.60 | $2.45 |
| 37 | Electrical conductor (no.6) bare (620-7009) | LF | 5,025 | $3.05 | $1.50 | $2.20 | $2.24 | $1.80 | $2.45 |
| 38 | Electrical conductor (no.6) insulated (620-7010) | LF | 2,250 | $3.60 | $1.75 | $2.20 | $2.51 | $2.00 | $2.45 |
| 39 | Electrical conductor (no.4) insulated (620-7012) | LF | 610 | $3.50 | $3.00 | $3.00 | $3.50 | $5.00 | $3.20 |
| 40 | ITS GND box type 2 (243636)W/apron (623-7033) | EACH | 2 | $5,000.00 | $3,500.00 | $5,893.00 | $6,650.35 | $5,500.00 | $4,200.00 |
| 41 | Ground box type D (162922)W/apron (624-7008) | EACH | 47 | $1,300.00 | $1,500.00 | $1,655.00 | $1,659.44 | $1,800.00 | $1,775.00 |
| 42 | Elc SRV type D 120/240 070(NS)AL(E)SP(O) (628-7169) | EACH | 5 | $7,000.00 | $8,000.00 | $7,574.00 | $7,746.08 | $6,000.00 | $5,500.00 |
| 43 | Elc SRV type D 120/240 070(NS)AL(E)SP(U) (628-7170) | EACH | 1 | $5,000.00 | $7,500.00 | $6,532.00 | $10,639 | $5,800.00 | $5,500.00 |
| 44 | Aluminum signs (type A) (636-7001) | SF | 625 | $50.00 | $35.00 | $30.00 | $36.18 | $40.00 | $45.30 |
| 45 | Install small roadside sign support and assembly type 10BWG(1)SA(P) (644-7001) | EACH | 10 | $800.00 | $850.00 | $1,004.00 | $1,011.14 | $1,000.00 | $775.00 |
| 46 | Install small roadside sign support and assembly type 10BWG(1)SA(T) (644-7004) | EACH | 4 | $800.00 | $950.00 | $1,123.00 | $1,130.10 | $1,100.00 | $875.00 |
| 47 | Relocate SM RD SN sup&AM type 10BWG (644-7065) | EACH | 4 | $650.00 | $450.00 | $532.00 | $535.31 | $600.00 | $660.00 |
| 48 | Remove SM RD SN sup&AM (644-7073) | EACH | 23 | $110.00 | $75.00 | $89.00 | $89.22 | $125.00 | $125.00 |
| 49 | Reflectorized pavement marking type I (W)4"(DOT)(100MIL) (666-7003) | LF | 24 | $1.00 | $1.00 | $5.00 | $1.00 | $2.00 | $1.75 |
| 50 | Reflectorized pavement marking type I (W)6"(DOT)(100MIL) (666-7009) | LF | 34 | $1.10 | $1.00 | $3.50 | $1.00 | $2.10 | $1.55 |
| 51 | Reflectorized pavement marking type I (W)8"(DOT)(100MIL) (666-7018) | LF | 94 | $1.30 | $2.00 | $2.40 | $2.00 | $2.60 | $2.15 |
| 52 | Reflectorized pavement marking type I (W)8"(solid)(100MIL) (666-7024) | LF | 3,003 | $1.00 | $1.00 | $1.20 | $1.00 | $2.00 | $1.50 |
| 53 | Reflectorized pavement marking type I (W)24"(solid)(100MIL) (666-7036) | LF | 1,861 | $8.75 | $6.75 | $8.00 | $6.75 | $10.00 | $9.25 |
| 54 | Reflectorized pavement marking type I (W)(arrow)(100MIL) (666-7042) | EACH | 29 | $170.00 | $150.00 | $178.00 | $150.00 | $95.00 | $191.00 |
| 55 | Reflectorized pavement marking type I(W)(double arrow)(100MIL) (666-7045) | EACH | 15 | $270.00 | $250.00 | $296.00 | $250.00 | $110.00 | $2.75 |
| 56 | Reflectorized pavement marking type I(W)(uturn arrow)(100MIL) (666-7051) | EACH | 4 | $300.00 | $300.00 | $355.00 | $300.00 | $150.00 | $2.75 |
| 57 | Reflectorized pavement marking type I (W)(word)(100MIL) (666-7066) | EACH | 35 | $210.00 | $175.00 | $207.00 | $175.00 | $110.00 | $221.00 |
| 58 | Ref pavement marking type I(W)18"(yld tri)(100MIL) (666-7087) | EACH | 14 | $20.00 | $35.00 | $42.00 | $35.00 | $30.00 | $45.00 |
| 59 | Reflectorized pavement marking type I (W)(bike arrow)(100MIL) (666-7093) | EACH | 3 | $150.00 | $100.00 | $119.00 | $100.00 | $75.00 | $180.00 |
| 60 | Reflectorized pavement marking type I(W)(bike syml)(100MIL) (666-7099) | EACH | 3 | $300.00 | $150.00 | $178.00 | $150.00 | $95.00 | $205.00 |
| 61 | Reflectorized pavement marking type I (W)(bike DOT)(100MIL) (666-7105) | EACH | 49 | $25.00 | $1.00 | $1.20 | $1.00 | $10.00 | $6.50 |
| 62 | Reflectorized pavement marking type I (Y)12"(solid)(100MIL) (666-7117) | LF | 417 | $2.50 | $3.50 | $4.20 | $3.50 | $5.00 | $4.00 |
| 63 | Reflectorized pavement marking type I (Y)24"(solid)(100MIL) (666-7123) | LF | 916 | $9.00 | $6.75 | $8.00 | $6.75 | $10.00 | $1.25 |
| 64 | Pavement sler 4" (666-7346) | LF | 362 | $1.20 | $0.30 | $0.35 | $0.30 | $0.40 | $1.25 |
| 65 | Pavement sler 6" (666-7347) | LF | 17,664 | $0.50 | $0.40 | $0.48 | $0.40 | $0.50 | $0.75 |
| 66 | Pavement sler 8" (666-7348) | LF | 3,097 | $1.50 | $0.50 | $0.60 | $0.50 | $0.55 | $0.75 |
| 67 | Pavement sler 12" (666-7350) | LF | 417 | $2.00 | $1.00 | $1.19 | $1.00 | $1.00 | $4.00 |
| 68 | Pavement sler 24" (666-7352) | LF | 2,777 | $3.70 | $2.00 | $2.40 | $2.00 | $1.50 | $2.25 |
| 69 | Pavement sler (arrow) (666-7353) | EACH | 29 | $90.00 | $50.00 | $59.00 | $50.00 | $40.00 | $45.50 |
| 70 | Pavement sler (word) (666-7354) | EACH | 35 | $100.00 | $50.00 | $59.00 | $50.00 | $45.00 | $45.50 |
| 71 | Pavement sler (double arrow) (666-7356) | EACH | 15 | $90.00 | $75.00 | $89.00 | $75.00 | $45.00 | $45.50 |
| 72 | Pavement sler (uturn arrow) (666-7358) | EACH | 4 | $50.00 | $75.00 | $89.00 | $75.00 | $60.00 | $60.00 |
| 73 | Pavement sler (yld tri) (666-7365) | EACH | 14 | $50.00 | $10.00 | $12.00 | $10.00 | $15.00 | $20.00 |
| 74 | Pavement sler (bike arrow) (666-7368) | EACH | 3 | $55.00 | $25.00 | $30.00 | $25.00 | $15.00 | $40.00 |
| 75 | Pavement sler (bike symbol) (666-7369) | EACH | 3 | $80.00 | $25.00 | $30.00 | $25.00 | $15.00 | $40.00 |
| 76 | Pavenent sler (bike DOT) (666-7372) | LF | 49 | $2.00 | $0.10 | $3.00 | $0.10 | $5.00 | $10.00 |
| 77 | Reflectorized pavement marking type I (W)4"(solid)(100MIL) (666-7405) | LF | 338 | $0.50 | $0.68 | $0.80 | $0.68 | $1.00 | $1.25 |
| 78 | Reflectorized pavement marking type I (W)6"(broken)(100MIL) (666-7408) | LF | 440 | $0.70 | $0.68 | $0.85 | $0.68 | $1.00 | $1.25 |
| 79 | Reflectorized pavement marking type I (W)6"(solid)(100MIL) (666-7411) | LF | 5,568 | $0.70 | $0.68 | $0.80 | $0.68 | $1.00 | $1.25 |
| 80 | Reflectorized pavement marking type I (Y)6"(solid)(100MIL) (666-7423) | LF | 11,622 | $0.70 | $0.68 | $0.80 | $0.68 | $1.00 | $1.25 |
| 81 | Reflectorized pavement marker type I-C (672-7002) | EACH | 171 | $4.50 | $3.50 | $4.15 | $3.50 | $7.00 | $6.50 |
| 82 | Reflectorized pavement marker type II-A-A (672-7004) | EACH | 517 | $4.50 | $3.50 | $4.15 | $3.50 | $6.00 | $8.00 |
| 83 | Reflectorized pavement marker type II-C-R (672-7006) | EACH | 130 | $5.00 | $3.50 | $4.12 | $3.50 | $7.00 | $8.00 |
| 84 | Eliminating existing PM & markers (4") (677-7001) | LF | 2,737 | $0.40 | $1.00 | $1.20 | $1.00 | $1.00 | $1.50 |
| 85 | Eliminating existing PM & markers (6") (677-7002) | LF | 3,636 | $0.50 | $1.00 | $1.20 | $1.00 | $1.00 | $1.50 |
| 86 | Eliminating existing PM & markers (8") (677-7004) | LF | 1,004 | $0.80 | $1.00 | $1.20 | $1.00 | $2.00 | $2.25 |
| 87 | Eliminating existing PM & markers (12") (677-7006) | LF | 205 | $3.00 | $3.00 | $3.60 | $3.00 | $3.00 | $2.50 |
| 88 | Eliminating existing PM & markers (24") (677-7008) | LF | 1,208 | $5.00 | $6.00 | $7.10 | $6.00 | $4.00 | $5.00 |
| 89 | Eliminating existing PM & markers (arrow) (677-7009) | EACH | 11 | $70.00 | $100.00 | $119.00 | $100.00 | $60.00 | $5.00 |
| 90 | Eliminating existing PM & markers (word) (677-7015) | EACH | 9 | $70.00 | $100.00 | $119.00 | $100.00 | $50.00 | $85.00 |
| 91 | Eliminating existing PM & markers (18")(yld tri) (677-7023) | EACH | 58 | $25.00 | $25.00 | $30.00 | $25.00 | $25.00 | $26.00 |
| 92 | Eliminating existing PM & marks (bike arrow) (677-7025) | EACH | 1 | $50.00 | $75.00 | $89.00 | $75.00 | $30.00 | $65.00 |
| 93 | Eliminating existing PM & marks (bike symbol) (677-7027) | EACH | 1 | $70.00 | $75.00 | $89.00 | $75.00 | $30.00 | $65.00 |
| 94 | Pavement surface preparation for marking (4") (678-7001) | LF | 362 | $0.25 | $0.02 | $0.40 | $0.02 | $0.20 | $0.55 |
| 95 | Pavement surface preparation for marking (6") (678-7002) | LF | 17,664 | $0.40 | $0.04 | $0.10 | $0.04 | $0.20 | $0.75 |
| 96 | Pavement surface preparation for marking (8") (678-7004) | LF | 3,097 | $0.60 | $0.06 | $0.10 | $0.06 | $0.30 | $0.75 |
| 97 | Pavement surface preparation for marking (12") (678-7006) | LF | 417 | $0.75 | $0.25 | $4.00 | $0.25 | $0.60 | $0.75 |
| 98 | Pavement surface preparation for marking (24") (678-7008) | LF | 2,777 | $0.90 | $0.50 | $0.40 | $0.50 | $0.90 | $2.30 |
| 99 | Pavement surface preparation for marking (arrow) (678-7009) | EACH | 29 | $25.00 | $25.00 | $16.00 | $25.00 | $30.00 | $28.00 |
| 100 | Pavement surface preparation for marking (double arrow) (678-7010) | EACH | 15 | $30.00 | $25.00 | $7.90 | $25.00 | $30.00 | $28.00 |
| 101 | Pavement surface preparation for marking (uturn arr) (678-7012) | EACH | 4 | $25.00 | $25.00 | $259.00 | $25.00 | $50.00 | $28.00 |
| 102 | Pavement surface preparation for marking (word) (678-7016) | EACH | 35 | $25.00 | $25.00 | $3.40 | $25.00 | $25.00 | $30.00 |
| 103 | Pavement surface preparation for marking (18")(yld tri) (678-7022) | EACH | 14 | $30.00 | $5.00 | $8.50 | $5.00 | $10.00 | $25.00 |
| 104 | Pavement surface preparation for marking (bike arrow) (678-7026) | EACH | 3 | $32.00 | $10.00 | $40.00 | $10.00 | $10.00 | $30.00 |
| 105 | Pavement surface preparation for marking (bike symbol) (678-7028) | EACH | 3 | $33.00 | $10.00 | $40.00 | $10.00 | $10.00 | $30.00 |
| 106 | Pavement surface preparation for marking (bike DOT) (678-7030) | EACH | 49 | $2.00 | $0.02 | $3.00 | $0.02 | $2.00 | $10.00 |
| 107 | Pavement surface preparation for marking (RPM) (678-7033) | EACH | 748 | $0.70 | $2.50 | $3.00 | $2.50 | $0.50 | $1.00 |
| 108 | Install highway traffic signal (isolated) (680-7002) | EACH | 6 | $12,500 | $6,000.00 | $14,150 | $8,546.47 | $9,000.00 | $32,900 |
| 109 | Install highway traffic signal (system) (680-7003) | EACH | 1 | $20,000 | $6,000.00 | $10,804 | $16,430 | $10,000 | $41,900 |
| 110 | Vehicle signal section (12")LED(green) (682-7001) | EACH | 64 | $275.00 | $300.00 | $235.00 | $346.14 | $275.00 | $350.00 |
| 111 | Vehicle signal section (12")LED(green arrow) (682-7002) | EACH | 19 | $325.00 | $300.00 | $235.00 | $346.14 | $275.00 | $350.00 |
| 112 | Vehicle signal section (12")LED(yel) (682-7003) | EACH | 64 | $275.00 | $300.00 | $235.00 | $346.14 | $275.00 | $350.00 |
| 113 | Vehicle signal section (12")LED(yel arrow) (682-7004) | EACH | 20 | $325.00 | $300.00 | $235.00 | $346.14 | $275.00 | $350.00 |
| 114 | Vehicle signal section (12")LED(red) (682-7005) | EACH | 64 | $275.00 | $300.00 | $235.00 | $346.14 | $275.00 | $350.00 |
| 115 | Vehicle signal section (12")LED(red arrow) (682-7006) | EACH | 15 | $325.00 | $300.00 | $235.00 | $346.14 | $275.00 | $350.00 |
| 116 | Pedestrian signal section (LED)(countdown) (682-7018) | EACH | 24 | $750.00 | $625.00 | $683.00 | $742.01 | $500.00 | $840.00 |
| 117 | Backplate W/ref border(3 sec)(vent)aluminum (682-7042) | EACH | 71 | $200.00 | $150.00 | $127.00 | $181.89 | $150.00 | $275.00 |
| 118 | Backplate W/ref border(4 sec)(vent)aluminum (682-7043) | EACH | 7 | $270.00 | $175.00 | $193.00 | $195.39 | $170.00 | $275.00 |
| 119 | Backplate W/ref border(5 sec)(vent)aluminum (682-7044) | EACH | 1 | $235.00 | $225.00 | $211.00 | $222.41 | $200.00 | $275.00 |
| 120 | Traffic signal CBL (type A)(10 AWG)(2 conductor) (684-7001) | LF | 1,275 | $3.50 | $4.00 | $3.60 | $4.38 | $1.00 | $3.50 |
| 121 | Traffic signal CBL (type A)(12 AWG)(2 conductor) (684-7007) | LF | 6,910 | $2.00 | $1.50 | $1.90 | $1.97 | $1.00 | $2.10 |
| 122 | Traffic signal CBL (type A)(14 AWG)(5 conductor) (684-7031) | LF | 14,521 | $2.10 | $1.75 | $2.50 | $2.51 | $2.00 | $3.10 |
| 123 | Traffic signal CBL (type A)(14 AWG)(7 conductor) (684-7033) | LF | 2,252 | $4.50 | $2.50 | $3.10 | $3.17 | $3.00 | $3.50 |
| 124 | Traffic signal CBL (type A)(14 AWG)(20 conductor) (684-7046) | LF | 1,690 | $7.50 | $6.00 | $7.10 | $8.16 | $6.00 | $7.50 |
| 125 | Install RDSD FLSH BCN assembly (solar PWRD) (685-7004) | EACH | 5 | $6,100.00 | $5,500.00 | $7,508.00 | $6,884.23 | $9,500.00 | $7,500.00 |
| 126 | Ins traffic signal PL AM(S)1 arm(28')lum (686-7031) | EACH | 1 | $11,000 | $10,250 | $11,139 | $10,174 | $12,000 | $18,700 |
| 127 | Ins traffic signal PL AM(S)1 arm(32')lum (686-7035) | EACH | 4 | $11,800 | $11,000 | $11,591 | $10,762 | $13,000 | $13,200 |
| 128 | Ins traffic signal PL AM(S)1 arm(36')lum (686-7039) | EACH | 4 | $14,000 | $11,750 | $12,712 | $12,095 | $14,000 | $15,225 |
| 129 | Ins traffic signal PL AM(S)1 arm(40')lum (686-7043) | EACH | 6 | $14,500 | $12,250 | $14,730 | $13,596 | $15,000 | $15,768 |
| 130 | Ins traffic signal PL AM(S)1 arm(44')lum (686-7047) | EACH | 2 | $15,500 | $12,750 | $13,760 | $13,675 | $16,000 | $16,100 |
| 131 | Ins traffic signal PL AM(S)1 arm(48')lum (686-7051) | EACH | 4 | $16,000 | $13,750 | $14,275 | $15,488 | $18,000 | $16,995 |
| 132 | Ins traffic signal PL AM(S)1 arm(55')lum (686-7059) | EACH | 1 | $35,000 | $35,000 | $36,033 | $45,263 | $43,000 | $35,567 |
| 133 | Ins traffic signal PL AM(S)1 arm(65')lum (686-7067) | EACH | 1 | $37,000 | $36,000 | $36,931 | $45,594 | $44,000 | $41,000 |
| 134 | Ins traffic signal PL AM (mast)(install only) (686-7292) | EACH | 6 | $2,100.00 | $1,500.00 | $370.00 | $1,669.86 | $1,000.00 | $5,001.00 |
| 135 | Pedestrian pole assembly (687-7001) | EACH | 16 | $2,500.00 | $2,200.00 | $3,425.00 | $2,800.19 | $3,500.00 | $2,750.00 |
| 136 | Pedestrian detect push button (APS) (688-7001) | EACH | 24 | $1,000.00 | $850.00 | $1,110.00 | $912.59 | $900.00 | $999.00 |
| 137 | Pedestrian detector controller unit (688-7003) | EACH | 3 | $4,000.00 | $3,000.00 | $3,798.00 | $3,572.51 | $3,000.00 | $4,004.00 |
| 138 | Install fused disconnect (690-7203) | EACH | 1 | $1,200.00 | $1,500.00 | $944.00 | $3,196.20 | $3,800.00 | $2,500.00 |
| 139 | Subsurface util locate (non-paved area) (5061-7001) | EACH | 14 | $1,500.00 | $1,000.00 | $703.00 | $860.68 | $400.00 | $559.00 |
| 140 | ITS com CBL (ethernet) (6005-7001) | LF | 2,580 | $5.00 | $1.50 | $1.50 | $1.39 | $2.00 | $3.01 |
| 141 | VIVDS prosr sys (6006-7001) | EACH | 5 | $4,500.00 | $9,500.00 | $15,340 | $9,033.67 | $10,000 | $13,220 |
| 142 | VIVDS cam assy FXD LNS (6006-7002) | EACH | 17 | $2,500.00 | $2,500.00 | $3,542.00 | $6,355.91 | $3,000.00 | $4,407.45 |
| 143 | VIVDS CNTRL software (6006-7005) | EACH | 5 | $4,000.00 | $350.00 | $11,284 | $403.12 | $500.00 | $2,432.12 |
| 144 | VIVDS cabling (6006-7007) | LF | 3,710 | $2.00 | $1.50 | $1.50 | $1.97 | $2.00 | $3.53 |
| 145 | Bbu system (external battery cabinet) (6007-7001) | EACH | 6 | $8,250.00 | $6,500.00 | $7,940.00 | $8,275.56 | $7,500.00 | $9,200.00 |
| 146 | RVDS (presence detection only) (6008-7001) | EACH | 6 | $7,300.00 | $6,000.00 | $8,888.00 | $5,655.90 | $5,400.00 | $8,123.00 |
| 147 | RVDS (advance detection only) (6008-7002) | EACH | 4 | $8,500.00 | $6,500.00 | $9,278.00 | $5,655.89 | $5,400.00 | $8,125.00 |
| 148 | Ground box (prepare) (6013-7006) | EACH | 1 | $600.00 | $300.00 | $185.00 | $438.32 | $600.00 | $550.00 |
| 149 | Ground box (adjust) (6013-7007) | EACH | 1 | $750.00 | $500.00 | $554.00 | $879.59 | $835.00 | $700.00 |
| 150 | Installation of cellular modem (6015-7001) | EACH | 6 | $1,350.00 | $500.00 | $370.00 | $738.72 | $150.00 | $1,136.40 |
| 151 | CCTV mount (pole) (6018-7003) | EACH | 2 | $800.00 | $300.00 | $121.00 | $168.47 | $500.00 | $890.00 |
The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.
Source
Read from TxDOT's tabulation for this contract. TxDOT Bid Tabulations open-data export (data.texas.gov) from September 2024, read 21 November 2026, and TxDOT's legacy Tabulation of Bids pages for January 2020 to August 2024. The legacy pages are a large sample, not every contract: their file names were reused from year to year. Their district is the one TxDOT gives the county. Bids that did not match their published total are left out.
Every contract let that day: TxDOT letting of July 1, 2026. Compiled by Mirage Metrics.
Your own bid history, read the same way
Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.