TxDOT contract A00216530 bid tabulation

BRIDGE RAIL REPAIR, US0080 (VARIOUS BRIDGES to IN THE TYLER DISTRICT). Let by Texas DOT on November 12, 2025, Wood, Tyler District. 7 bids received; low bid $143,287 by Red Baron Building Company, LLC, -6.2% against the engineer's estimate of $152,821.

Owner
Texas DOT
Letting
12 NOV 2025
Pay items
25
Data through
19 NOV 2026

Bidders

RankBidderTotal bidAgainst the low bidAgainst the estimate
1Red Baron Building Company, LLC$143,287Low-6.0%
2GHB Equipment Company, L.L.C.$159,836+12%+5.0%
3Structural Integrity Group LLC$168,812+18%+10%
4Aad Contracting Inc.$180,827+26%+18%
5BK Field Operations LLC$197,574+38%+29%
6Scout 5 Construction LLC$206,650+44%+35%
7Cross Plus Construction, LLC$215,137+50%+41%
TxDOT contract A00216530: bids by rank

Engineer's estimate: $152,821.

Bid tabulation

LinePay itemUnitQuantityEstimate1. Red Baron Building Company, LLC2. GHB Equipment Company, L.L.C.3. Structural Integrity Group LLC4. Aad Contracting Inc.5. BK Field Operations LLC6. Scout 5 Construction LLC
1Removing concrete (riprap) (104-7006)SY5$50.00$50.00$100.00$150.00$25.00$500.00$225.00
2Excavation (roadway) (110-7001)CY3$16.00$100.00$250.00$75.00$25.00$2,000.00$250.00
3Class C concrete (rac-R) (420-7055)CY3$1,940.00$650.00$1,000.00$6,135.00$3,000.00$3,000.00$1,000.00
4Concrete structure repair (vertical & overhead) (429-7007)SF2$200.00$165.00$150.00$1,700.00$200.00$800.00$125.00
5Riprap (mow strip)(4 in) (432-7013)CY15$750.00$650.00$600.00$875.00$600.00$1,000.00$500.00
6Retrofit rail (type T223) (451-7008)LF55$155.00$400.00$650.00$349.00$220.00$1,100.00$125.00
7Mobilization (500-7001)LS1$14,000$20,000$15,000$16,000$35,000$15,000$55,174
8Barricades, signs and traffic handling (502-7001)MO4$3,000.00$1,500.00$1,200.00$8,500.00$7,000.00$1.00$0.01
9Portable changeable message sign (503-7001)DAY42$200.00$125.00$200.00$50.00$350.00$1.00$0.01
10TMA (stationary) (505-7001)DAY42$300.00$250.00$450.00$1.00$350.00$1.00$0.01
11Temporary sediment control fence (install) (506-7039)LF450$5.00$2.00$20.00$2.00$4.00$1.00$20.00
12Temporary sediment control fence (remove) (506-7041)LF450$2.00$1.50$7.00$1.00$1.00$1.00$10.00
13Metal W-beam guard fence (timber post) (540-7001)LF132$25.00$30.00$40.00$30.00$36.00$40.00$200.00
14Metal thrie-beam guard fence (timber post) (540-7019)EACH2$2,220.00$2,500.00$2,500.00$2,500.00$1,900.00$2,500.00$1,500.00
15Remove metal beam guard fence (542-7001)LF180$16.00$7.00$13.00$8.00$4.00$10.00$130.00
16Guardrail end treatment (install) (544-7001)EACH1$3,200.00$4,000.00$2,500.00$3,300.00$4,000.00$4,500.00$2,500.00
17Guardrail end treatment (remove) (544-7003)EACH1$360.00$400.00$600.00$400.00$1,100.00$1,000.00$1,250.00
18Install delineator assembly (D-SW)SZ 1(BRF)CTB (658-7012)EACH6$30.00$12.00$13.00$25.00$90.00$200.00$125.00
19Install delineator assembly (D-SW)SZ 1(BRF)GF1 (658-7015)EACH1$35.00$15.00$13.00$100.00$90.00$100.00$125.00
20Repl rail elmnt(thrie-BM trans to W-BM) (770-7003)EACH1$70.00$200.00$1,500.00$300.00$1,200.00$1,200.00$225.00
21Repair (steel rail) (776-7001)LF125$34.50$75.00$75.00$30.00$55.00$180.00$150.00
22Concrete rail repair (in-kind) (778-7001)LF18$1,000.00$1,000.00$400.00$1,150.00$600.00$800.00$250.00
23Concrete rail repair (miscellaneous) (778-7002)LF33$1,000.00$500.00$400.00$390.00$500.00$800.00$1,000.00
24Concrete post repair (778-7003)EACH3$1,000.00$1,200.00$400.00$2,550.00$100.00$1,200.00$125.00
25Maintenance speed limit signing (7010-7001)EACH6$600.00$500.00$500.00$100.00$800.00$1.00$700.00
TxDOT contract A00216530: unit prices by line, the 6 lowest bidders (all in the CSV)

The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.

Source

Read from TxDOT's tabulation for this contract. TxDOT Bid Tabulations open-data export (data.texas.gov) from September 2024, read 21 November 2026, and TxDOT's legacy Tabulation of Bids pages for January 2020 to August 2024. The legacy pages are a large sample, not every contract: their file names were reused from year to year. Their district is the one TxDOT gives the county. Bids that did not match their published total are left out.

Every contract let that day: TxDOT letting of November 12, 2025. Compiled by Mirage Metrics.

Your own bid history, read the same way

Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.

We use your email to reply to you and, now and then, to tell you about Mirage. You can opt out at any time. Privacy policy