TxDOT contract A00207434 bid tabulation
Bridge Replacement, S HANCOCK ST (Hancock St to at Dry Fork Little Wichita River). Let by Texas DOT on October 8, 2025, Clay, Wichita Falls District. 8 bids received; low bid $1,149,814 by Hodges and Son Construction Company, Inc., -20% against the engineer's estimate of $1,434,272.
- Owner
- Texas DOT
- Letting
- 08 OCT 2025
- Pay items
- 44
- Data through
- 19 NOV 2026
Bidders
| Rank | Bidder | Total bid | Against the low bid | Against the estimate |
|---|---|---|---|---|
| 1 | Hodges and Son Construction Company, Inc. | $1,149,814 | Low | -20% |
| 2 | Skyline Bridge LLC | $1,155,641 | +1.0% | -19% |
| 3 | Altus Construction LLC | $1,183,936 | +3.0% | -17% |
| 4 | C & W Southern LLC | $1,220,291 | +6.0% | -15% |
| 5 | Texas Steel Industrial Placing, LLC | $1,257,506 | +9.0% | -12% |
| 6 | Coppell Construction Co., Inc. | $1,264,257 | +10% | -12% |
| 7 | STX Civil | $1,450,266 | +26% | +1.0% |
| 8 | Earth Builders, L.P. | $1,864,955 | +62% | +30% |
Engineer's estimate: $1,434,272.
Bid tabulation
| Line | Pay item | Unit | Quantity | Estimate | 1. Hodges and Son Construction Company, Inc. | 2. Skyline Bridge LLC | 3. Altus Construction LLC | 4. C & W Southern LLC | 5. Texas Steel Industrial Placing, LLC | 6. Coppell Construction Co., Inc. |
|---|---|---|---|---|---|---|---|---|---|---|
| 1 | Preparing row (100-7002) | STA | 5 | $7,000.00 | $6,000.00 | $2,500.00 | $23,442 | $3,500.00 | $2,000.00 | $5,000.00 |
| 2 | Remove (0"-4") TRT/untrt base & asphalt pavement (105-7001) | SY | 200 | $5.00 | $40.00 | $15.00 | $40.87 | $15.00 | $20.00 | $55.00 |
| 3 | Excavation (roadway & channel) (110-7004) | CY | 770 | $35.00 | $15.00 | $16.00 | $22.11 | $40.00 | $20.00 | $29.00 |
| 4 | Embankment (final)(OC)(type B) (132-7003) | CY | 1,800 | $45.00 | $30.00 | $30.00 | $19.16 | $30.00 | $20.00 | $40.00 |
| 5 | Broadcast seed (permanent_rural_sand) (164-7001) | SY | 1,225 | $2.00 | $3.00 | $2.50 | $1.02 | $2.18 | $1.00 | $2.20 |
| 6 | Vegetative watering (168-7001) | TGL | 10.30 | $80.00 | $1.00 | $1.00 | $39.71 | $1.00 | $10.00 | $50.00 |
| 7 | Proof rolling (216-7001) | HR | 8 | $128.00 | $10.00 | $100.00 | $124.64 | $100.00 | $125.00 | $90.00 |
| 8 | FL BS (compacted in place)(type A GR 1-2) (6") (247-7044) | SY | 2,027 | $36.00 | $35.00 | $40.00 | $17.15 | $45.00 | $45.00 | $25.00 |
| 9 | Drilled shaft (30 in) (416-7005) | LF | 645 | $230.00 | $265.00 | $260.00 | $214.04 | $260.00 | $372.32 | $300.00 |
| 10 | Class C concrete (abutment) (420-7012) | CY | 54.40 | $2,700.00 | $1,600.00 | $1,325.00 | $1,216.87 | $1,400.00 | $1,600.00 | $1,400.00 |
| 11 | Class C concrete (miscellaneous) (420-7067) | CY | 21.40 | $1,200.00 | $1,200.00 | $1,250.00 | $762.35 | $1,000.00 | $1,100.00 | $780.00 |
| 12 | Reinforced concrete slab (box beam) (422-7005) | SF | 3,402 | $40.00 | $28.00 | $25.00 | $21.99 | $35.00 | $23.00 | $23.00 |
| 13 | Shear key (422-7020) | CY | 17.20 | $880.00 | $800.00 | $900.00 | $799.96 | $500.00 | $150.00 | $620.00 |
| 14 | Prestressed concrete box beam (4B20) (425-7026) | LF | 516 | $365.00 | $300.00 | $325.00 | $323.68 | $330.00 | $328.46 | $310.00 |
| 15 | Prestressed concrete box beam (5B20) (425-7027) | LF | 258 | $365.00 | $300.00 | $400.00 | $344.94 | $350.00 | $400.24 | $305.00 |
| 16 | Riprap (mow strip)(4 in) (432-7013) | CY | 12.20 | $1,000.00 | $750.00 | $750.00 | $719.54 | $500.00 | $800.00 | $750.00 |
| 17 | Riprap (stone protection)(12 in) (432-7041) | CY | 420 | $200.00 | $200.00 | $160.00 | $172.38 | $250.00 | $200.00 | $175.00 |
| 18 | Rail (type T631LS) (450-7021) | LF | 324 | $105.00 | $70.00 | $42.00 | $106.01 | $65.00 | $100.00 | $60.00 |
| 19 | CMP (gal steel 18 in) (460-7003) | LF | 32 | $110.00 | $90.00 | $250.00 | $143.03 | $50.00 | $100.00 | $61.00 |
| 20 | Set (type II) (18 in) (CMP) (4: 1) (C) (467-7302) | EACH | 2 | $1,500.00 | $3,500.00 | $1,800.00 | $1,021.66 | $600.00 | $1,000.00 | $5,400.00 |
| 21 | Removing structure (pipe) (496-7007) | LF | 24 | $60.00 | $50.00 | $100.00 | $41.40 | $45.00 | $20.00 | $30.00 |
| 22 | Removing structure (bridge 0 - 99 FT length) (496-7009) | EACH | 2 | $23,000 | $25,000 | $15,000 | $25,564 | $10,000 | $30,000 | $33,500 |
| 23 | Mobilization (500-7001) | LS | 1 | $123,843 | $100,000 | $100,000 | $117,803 | $140,000 | $125,637 | $125,000 |
| 24 | Barricades, signs and traffic handling (502-7001) | MO | 9 | $8,000.00 | $2,000.00 | $2,500.00 | $4,086.63 | $900.00 | $500.00 | $8,500.00 |
| 25 | Rock filter dams (install) (type 2) (506-7002) | LF | 160 | $55.00 | $1.00 | $45.00 | $54.71 | $10.00 | $50.00 | $27.00 |
| 26 | Rock filter dams (remove) (506-7011) | LF | 160 | $25.00 | $1.00 | $10.00 | $19.00 | $1.00 | $10.00 | $25.00 |
| 27 | Temporary sediment control fence (install) (506-7039) | LF | 750 | $3.85 | $1.00 | $3.75 | $4.88 | $4.00 | $4.00 | $5.00 |
| 28 | Temporary sediment control fence (remove) (506-7041) | LF | 750 | $1.35 | $1.00 | $1.50 | $1.22 | $2.00 | $1.00 | $1.50 |
| 29 | Biodegradable erosion control logs (install) (8") (506-7043) | LF | 150 | $11.00 | $1.00 | $12.00 | $10.22 | $8.00 | $8.00 | $5.50 |
| 30 | Biodegradable erosion control logs (remove) (506-7046) | LF | 150 | $1.25 | $1.00 | $6.00 | $2.04 | $1.00 | $2.00 | $2.00 |
| 31 | Metal W-beam guard fence (timber post) (540-7001) | LF | 100 | $30.00 | $32.00 | $34.00 | $30.34 | $29.25 | $35.00 | $31.00 |
| 32 | Short radius (28") (540-7013) | LF | 12.50 | $45.00 | $55.00 | $390.99 | $42.00 | $60.00 | $41.00 | |
| 33 | Driveway terminal anchor section (540-7014) | EACH | 1 | $1,500.00 | $1,650.00 | $689.62 | $1,125.00 | $1,500.00 | $1,250.00 | |
| 34 | Guardrail end treatment (install) (544-7001) | EACH | 7 | $2,600.00 | $3,100.00 | $3,400.00 | $3,422.55 | $2,900.00 | $3,100.00 | $2,950.00 |
| 35 | Remove and install existing gate (550-7017) | EACH | 1 | $2,500.00 | $800.00 | $2,000.00 | $2,298.73 | $1,000.00 | $1,500.00 | $3,500.00 |
| 36 | Wire fence (type C) (552-7003) | LF | 360 | $16.00 | $20.00 | $30.00 | $30.65 | $15.00 | $30.00 | $50.00 |
| 37 | Wire fence (water gap) (552-7010) | LF | 65 | $200.00 | $100.00 | $200.00 | $51.08 | $150.00 | $50.00 | $80.00 |
| 38 | Wire fence (remove) (552-7011) | LF | 425 | $4.00 | $5.00 | $5.00 | $11.14 | $5.00 | $1.00 | $5.00 |
| 39 | Remove SM RD SN sup&AM (644-7073) | EACH | 4 | $320.00 | $50.00 | $200.00 | $137.12 | $100.00 | $500.00 | $150.00 |
| 40 | Install delineator assembly (D-SW)SZ 1(BRF)GF2(BI) (658-7019) | EACH | 15 | $49.00 | $25.00 | $50.00 | $35.76 | $25.00 | $30.00 | $31.00 |
| 41 | Spot mowing (730-7021) | ACRE | 0.61 | $50.00 | $1.00 | $1.00 | $1.02 | $1,000.00 | $100.00 | $2,500.00 |
| 42 | Tree removal (12" - 18" diameter) (752-7006) | EACH | 5 | $1,000.00 | $200.00 | $1,500.00 | $178.79 | $500.00 | $800.00 | $1,200.00 |
| 43 | Tree removal (18" - 24" diameter) (752-7007) | EACH | 1 | $900.00 | $500.00 | $2,500.00 | $255.41 | $2,000.00 | $1,500.00 | $1,300.00 |
| 44 | Tree removal (30" - 36" diameter) (752-7009) | EACH | 2 | $1,500.00 | $2,000.00 | $5,000.00 | $612.99 | $3,000.00 | $3,000.00 | $1,400.00 |
The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.
Source
Read from TxDOT's tabulation for this contract. TxDOT Bid Tabulations open-data export (data.texas.gov) from September 2024, read 21 November 2026, and TxDOT's legacy Tabulation of Bids pages for January 2020 to August 2024. The legacy pages are a large sample, not every contract: their file names were reused from year to year. Their district is the one TxDOT gives the county. Bids that did not match their published total are left out.
Every contract let that day: TxDOT letting of October 8, 2025. Compiled by Mirage Metrics.
Your own bid history, read the same way
Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.