TxDOT contract A00209977 bid tabulation

Install Traffic Signal, WILLIAM D. FITCH PKWY (At Pebble Creek Parkway to .). Let by Texas DOT on March 5, 2026, Brazos, Bryan District. 9 bids received; low bid $421,790 by Larry Young Paving, Inc., +14% against the engineer's estimate of $368,585.

Owner
Texas DOT
Letting
05 MAR 2026
Pay items
89
Data through
19 NOV 2026

Bidders

RankBidderTotal bidAgainst the low bidAgainst the estimate
1Larry Young Paving, Inc.$421,790Low+14%
2Professional Traffic Control LLC$434,520+3.0%+18%
3Third Coast Services LLC$458,794+9.0%+24%
4Allstate Signal & Construction, LLC$477,452+13%+30%
5Deco Contractors, Inc.$484,829+15%+32%
6Traf-Tex, Inc.$558,627+32%+52%
7E-Z Bel Construction, LLC$573,525+36%+56%
8Florida Traffic Control Devices, Inc.$673,673+60%+83%
9Select Maintenance, L.L.C.$703,108+67%+91%
TxDOT contract A00209977: bids by rank

Engineer's estimate: $368,585.

Bid tabulation

LinePay itemUnitQuantityEstimate1. Larry Young Paving, Inc.2. Professional Traffic Control LLC3. Third Coast Services LLC4. Allstate Signal & Construction, LLC5. Deco Contractors, Inc.6. Traf-Tex, Inc.
1Preparing row (100-7001)ACRE0.25$2,000.00$5,000.00$10,000$45,655$13,750$20,000$12,942
2Removing concrete (pavement) (104-7001)SY17$40.00$24.00$12.64$22.83$64.35$21.00$50.00
3Removing concrete (medians) (104-7008)SY14$50.00$30.00$35.00$22.83$64.35$21.00$55.00
4Removing concrete (driveways) (104-7011)SY164$25.00$27.00$17.54$22.83$49.50$21.00$30.00
5Removing concrete (sidewalk, ramp or shared use path) (104-7013)SY15$75.00$31.00$20.00$22.83$57.20$21.00$53.00
6Furn & place topsoil (4") (160-7002)SY530$1.50$9.00$5.00$9.72$6.60$12.00$3.45
7Block sodding (162-7002)SY160$10.00$8.00$7.85$14.37$8.80$11.00$17.00
8Hydro mulch seed (temporary_warm_cool) (164-7023)SY370$0.50$0.75$0.39$7.99$2.20$2.40$1.20
9Vegetative watering (168-7001)TGL0.53$500.00$1,000.00$50.00$1,136.49$1,100.00$10.00$3,086.00
10Full-depth repair CRCP (var depth) (361-7044)CY4$2,000.00$10.00$680.00$2,282.75$4,400.00$2,100.00$1,151.00
11Cem stabil BKFL (400-7010)CY74$150.00$260.00$190.00$79.90$217.80$74.00$255.00
12Drilled shaft (traffic signal pole) (24 in) (416-7042)LF6$225.00$290.00$380.00$187.09$188.44$210.00$159.00
13Drilled shaft (traffic signal pole) (30 in) (416-7043)LF11$300.00$310.00$450.00$181.52$285.00$325.00$455.00
14Drilled shaft (traffic signal pole) (36 in) (416-7044)LF26$375.00$300.00$605.85$204.05$320.00$395.00$435.00
15Mobilization (500-7001)LS1$17,500$29,000$32,000$45,879$40,500$46,500$43,075
16Barricades, signs and traffic handling (502-7001)MO4$5,000.00$3,200.00$4,000.00$2,874.35$3,150.00$4,900.00$919.00
17Portable changeable message sign (503-7002)EACH2$1,000.00$500.00$1,000.00$257.05$300.00$2,500.00$4,004.00
18TMA (stationary) (505-7001)DAY29$200.00$200.00$500.00$359.88$575.00$115.00$322.00
19TMA (mobile operation) (505-7003)DAY1$300.00$690.00$500.00$476.72$575.00$115.00$880.00
20Temporary sediment control fence (install) (506-7039)LF500$6.00$19.00$3.81$10.89$6.33$8.00$4.50
21Concrete curb & gutter (type II) (529-7009)LF159$50.00$66.00$34.72$57.07$38.50$52.50$167.00
22Concrete sidewalks (6") (531-7003)SY103$70.00$87.00$110.00$148.38$148.50$136.50$253.00
23Curb ramps (type 1) (531-7005)EACH1$3,000.00$1,900.00$2,315.50$9,701.70$3,135.00$8,925.00$6,483.00
24Concrete sidewalks (special) (531-7025)SY444$110.00$100.00$220.00$171.21$162.80$157.50$300.00
25Concrete median (nose) (536-7005)SY5$350.00$770.00$350.00$228.28$330.00$210.00$513.00
26Conduit (PVC) (schedule 40) (2") (618-7030)LF235$10.00$8.00$12.50$11.46$17.25$11.00$13.70
27Conduit (PVC) (schedule 40) (2") (bore) (618-7031)LF115$22.00$15.00$16.40$16.48$19.25$18.00$18.60
28Conduit (PVC) (schedule 40) (4") (618-7040)LF170$20.00$13.00$23.60$13.83$20.65$22.00$19.75
29Conduit (PVC) (schedule 40) (4") (bore) (618-7041)LF335$30.00$24.00$32.30$18.85$23.65$31.00$26.65
30Conduit (RM) (4") (618-7086)LF20$30.00$110.00$100.00$55.53$78.00$55.00$76.60
31Electrical conductor (no.8) insulated (620-7008)LF820$2.00$1.00$2.30$2.25$2.80$2.35$2.00
32Electrical conductor (no.6) insulated (620-7010)LF120$2.25$2.00$2.12$2.84$3.20$3.00$2.55
33Tray cable (3 conductor) (12 AWG) (621-7002)LF240$4.00$3.00$2.80$3.10$3.35$3.25$3.35
34ITS GND box type 1 (304848)W/apron (623-7028)EACH1$2,000.00$3,500.00$10,000$2,467.57$6,380.00$3,400.00$3,564.00
35Ground box type D (162922)W/apron (624-7008)EACH4$1,500.00$1,500.00$1,350.00$1,185.62$1,180.00$1,610.00$1,276.00
36Elc SRV type D 120/240 060(NS)SS(E)PS(U) (628-7147)EACH1$9,000.00$8,500.00$8,000.00$7,090.00$7,479.00$6,475.00$10,767
37Aluminum signs (type A) (636-7001)SF64$45.00$74.00$30.00$28.84$62.03$30.00$32.15
38Install small roadside sign support and assembly type 10BWG(1)SB(P) (644-7009)EACH1$800.00$1,100.00$900.00$980.25$1,279.50$1,000.00$1,119.00
39Remove SM RD SN sup&AM (644-7073)EACH1$125.00$190.00$120.00$101.83$50.00$125.00$154.00
40Reflectorized pavement marking type I (W)8"(broken)(100MIL) (666-7015)LF126$2.50$1.00$2.88$2.85$3.30$4.00$3.33
41Reflectorized pavement marking type I (W)8"(solid)(100MIL) (666-7024)LF330$2.50$1.00$1.35$2.28$3.30$4.00$2.22
42Reflectorized pavement marking type I (W)24"(solid)(100MIL) (666-7036)LF207$12.00$6.00$8.50$10.27$9.90$11.50$7.22
43Reflectorized pavement marking type I (W)(arrow)(100MIL) (666-7042)EACH1$275.00$250.00$200.00$313.88$275.00$230.00$222.00
44Reflectorized pavement marking type I(W)(double arrow)(100MIL) (666-7045)EACH1$325.00$320.00$268.50$370.95$385.00$275.00$333.00
45Reflectorized pavement marking type I (W)(word)(100MIL) (666-7066)EACH1$300.00$250.00$218.00$336.71$275.00$275.00$222.00
46Reflectorized pavement marking type I (W)(bike arrow)(100MIL) (666-7093)EACH1$200.00$250.00$116.00$264.96$132.00$200.00$139.00
47Reflectorized pavement marking type I(W)(bike syml)(100MIL) (666-7099)EACH1$300.00$250.00$100.00$264.96$247.50$240.00$222.00
48Reflectorized pavement marking type I(Y)(med nose)(100MIL) (666-7132)EACH2$500.00$320.00$500.00$285.34$302.50$190.00$389.00
49Pavement sler 8" (666-7348)LF456$0.25$0.25$0.55$0.18$0.72$0.60$0.60
50Pavement sler 24" (666-7352)LF207$0.50$3.00$2.28$0.55$0.84$1.25$2.22
51Pavement sler (arrow) (666-7353)EACH1$15.00$19.00$38.00$5.71$22.00$21.00$55.55
52Pavement sler (word) (666-7354)EACH1$15.00$19.00$32.00$5.71$22.00$21.00$55.55
53Pavement sler (med nose) (666-7355)EACH2$50.00$190.00$250.00$5.70$49.50$6.00$84.00
54Pavement sler (double arrow) (666-7356)EACH1$15.00$32.00$21.23$5.71$55.00$28.00$84.00
55Pavement sler (bike arrow) (666-7368)EACH1$15.00$19.00$14.00$5.71$22.00$23.00$44.45
56Pavement sler (bike symbol) (666-7369)EACH1$15.00$19.00$30.00$5.71$22.00$23.00$44.45
57Eliminating existing PM & markers (8") (677-7004)LF200$2.50$0.75$0.90$25.68$0.32$1.15$2.22
58Pavement surface preparation for marking (8") (678-7004)LF456$0.25$0.75$0.11$0.05$0.22$0.15$0.11
59Pavement surface preparation for marking (24") (678-7008)LF207$0.50$3.00$0.55$0.13$0.44$0.60$0.60
60Pavement surface preparation for marking (arrow) (678-7009)EACH1$15.00$32.00$15.30$1.14$11.00$17.00$5.60
61Pavement surface preparation for marking (double arrow) (678-7010)EACH1$15.00$32.00$17.70$1.14$16.50$17.00$11.11
62Pavement surface preparation for marking (word) (678-7016)EACH1$15.00$32.00$15.00$1.14$11.00$17.00$5.60
63Pavement surface preparation for marking (med nose) (678-7024)EACH2$25.00$130.00$65.00$1.14$33.00$35.00$16.70
64Pavement surface preparation for marking (bike arrow) (678-7026)EACH1$15.00$32.00$14.00$1.14$11.00$11.00$5.60
65Pavement surface preparation for marking (bike symbol) (678-7028)EACH1$15.00$32.00$57.00$1.14$11.00$10.50$5.60
66Install highway traffic signal (isolated) (680-7002)EACH1$35,000$58,000$37,500$42,417$46,293$65,000$56,372
67Vehicle signal section (12")LED(green) (682-7001)EACH6$275.00$310.00$296.00$298.29$330.00$325.00$254.00
68Vehicle signal section (12")LED(green arrow) (682-7002)EACH3$275.00$310.00$298.00$311.82$330.00$325.00$254.00
69Vehicle signal section (12")LED(yel) (682-7003)EACH6$275.00$310.00$296.00$301.93$330.00$325.00$254.00
70Vehicle signal section (12")LED(yel arrow) (682-7004)EACH4$275.00$310.00$310.00$303.15$330.00$325.00$254.00
71Vehicle signal section (12")LED(red) (682-7005)EACH6$275.00$310.00$300.00$298.29$330.00$325.00$254.00
72Vehicle signal section (12")LED(red arrow) (682-7006)EACH2$275.00$310.00$300.00$303.14$330.00$325.00$254.00
73Pedestrian signal section (LED)(countdown) (682-7018)EACH4$650.00$840.00$808.00$1,031.17$700.00$650.00$603.00
74Back plate (12")(3 sect) (682-7052)EACH5$200.00$210.00$177.00$184.28$150.00$175.00$193.00
75Back plate (12")(4 sect) (682-7053)EACH3$225.00$240.00$249.00$253.53$225.00$235.00$222.00
76Traffic signal CBL (type A)(12 AWG)(2 conductor) (684-7007)LF345$2.25$4.00$1.80$1.68$2.37$2.25$2.50
77Traffic signal CBL (type A)(12 AWG)(5 conductor) (684-7010)LF385$3.00$4.00$2.62$2.98$3.60$2.85$3.80
78Traffic signal CBL (type A)(12 AWG)(7 conductor) (684-7012)LF1,164$3.75$4.00$3.14$3.87$4.70$4.25$4.90
79Ins traffic signal PL AM(S)1 arm(32')lum (686-7035)EACH1$14,000$14,000$15,624$15,013$14,649$15,775$12,633
80Ins traffic signal PL AM(S)1 arm(48') (686-7049)EACH1$20,000$16,000$16,036$15,252$16,091$17,500$14,451
81Ins traffic signal PL AM(S)1 arm(48')lum (686-7051)EACH1$19,000$19,000$19,184$17,877$18,788$22,000$17,501
82Pedestrian pole assembly (687-7001)EACH1$2,500.00$1,600.00$2,974.00$2,523.24$1,615.00$2,000.00$3,582.00
83Pedestrian detect push button (APS) (688-7001)EACH4$1,100.00$910.00$1,033.00$882.12$801.00$850.00$1,086.00
84Pedestrian detector controller unit (688-7003)EACH1$4,000.00$3,900.00$3,810.00$3,994.50$3,715.00$4,000.00$4,640.00
85Bbu system (external battery cabinet) (6007-7001)EACH1$9,000.00$12,000$8,000.00$7,530.93$10,000$7,700.00$12,965
86Vid image and radar det processor sys (6017-7018)EACH1$25,000$41,000$10,500$35,882$41,610$41,000$31,617
87CCTV field equipment (digital) (6018-7002)EACH1$6,000.00$8,000.00$4,881.00$10,332$7,205.00$8,200.00$9,050.00
88CCTV mount (pole) (6018-7003)EACH1$500.00$320.00$347.00$2,311.93$110.00$175.00$1,109.00
89ITS com CBL (ethernet) (6018-7004)LF175$3.00$3.00$1.98$2.77$3.00$4.00$1.60
TxDOT contract A00209977: unit prices by line, the 6 lowest bidders (all in the CSV)

The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.

Source

Read from TxDOT's tabulation for this contract. TxDOT Bid Tabulations open-data export (data.texas.gov) from September 2024, read 21 November 2026, and TxDOT's legacy Tabulation of Bids pages for January 2020 to August 2024. The legacy pages are a large sample, not every contract: their file names were reused from year to year. Their district is the one TxDOT gives the county. Bids that did not match their published total are left out.

Every contract let that day: TxDOT letting of March 5, 2026. Compiled by Mirage Metrics.

Your own bid history, read the same way

Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.

We use your email to reply to you and, now and then, to tell you about Mirage. You can opt out at any time. Privacy policy