TxDOT contract A00209977 bid tabulation
Install Traffic Signal, WILLIAM D. FITCH PKWY (At Pebble Creek Parkway to .). Let by Texas DOT on March 5, 2026, Brazos, Bryan District. 9 bids received; low bid $421,790 by Larry Young Paving, Inc., +14% against the engineer's estimate of $368,585.
- Owner
- Texas DOT
- Letting
- 05 MAR 2026
- Pay items
- 89
- Data through
- 19 NOV 2026
Bidders
| Rank | Bidder | Total bid | Against the low bid | Against the estimate |
|---|---|---|---|---|
| 1 | Larry Young Paving, Inc. | $421,790 | Low | +14% |
| 2 | Professional Traffic Control LLC | $434,520 | +3.0% | +18% |
| 3 | Third Coast Services LLC | $458,794 | +9.0% | +24% |
| 4 | Allstate Signal & Construction, LLC | $477,452 | +13% | +30% |
| 5 | Deco Contractors, Inc. | $484,829 | +15% | +32% |
| 6 | Traf-Tex, Inc. | $558,627 | +32% | +52% |
| 7 | E-Z Bel Construction, LLC | $573,525 | +36% | +56% |
| 8 | Florida Traffic Control Devices, Inc. | $673,673 | +60% | +83% |
| 9 | Select Maintenance, L.L.C. | $703,108 | +67% | +91% |
Engineer's estimate: $368,585.
Bid tabulation
| Line | Pay item | Unit | Quantity | Estimate | 1. Larry Young Paving, Inc. | 2. Professional Traffic Control LLC | 3. Third Coast Services LLC | 4. Allstate Signal & Construction, LLC | 5. Deco Contractors, Inc. | 6. Traf-Tex, Inc. |
|---|---|---|---|---|---|---|---|---|---|---|
| 1 | Preparing row (100-7001) | ACRE | 0.25 | $2,000.00 | $5,000.00 | $10,000 | $45,655 | $13,750 | $20,000 | $12,942 |
| 2 | Removing concrete (pavement) (104-7001) | SY | 17 | $40.00 | $24.00 | $12.64 | $22.83 | $64.35 | $21.00 | $50.00 |
| 3 | Removing concrete (medians) (104-7008) | SY | 14 | $50.00 | $30.00 | $35.00 | $22.83 | $64.35 | $21.00 | $55.00 |
| 4 | Removing concrete (driveways) (104-7011) | SY | 164 | $25.00 | $27.00 | $17.54 | $22.83 | $49.50 | $21.00 | $30.00 |
| 5 | Removing concrete (sidewalk, ramp or shared use path) (104-7013) | SY | 15 | $75.00 | $31.00 | $20.00 | $22.83 | $57.20 | $21.00 | $53.00 |
| 6 | Furn & place topsoil (4") (160-7002) | SY | 530 | $1.50 | $9.00 | $5.00 | $9.72 | $6.60 | $12.00 | $3.45 |
| 7 | Block sodding (162-7002) | SY | 160 | $10.00 | $8.00 | $7.85 | $14.37 | $8.80 | $11.00 | $17.00 |
| 8 | Hydro mulch seed (temporary_warm_cool) (164-7023) | SY | 370 | $0.50 | $0.75 | $0.39 | $7.99 | $2.20 | $2.40 | $1.20 |
| 9 | Vegetative watering (168-7001) | TGL | 0.53 | $500.00 | $1,000.00 | $50.00 | $1,136.49 | $1,100.00 | $10.00 | $3,086.00 |
| 10 | Full-depth repair CRCP (var depth) (361-7044) | CY | 4 | $2,000.00 | $10.00 | $680.00 | $2,282.75 | $4,400.00 | $2,100.00 | $1,151.00 |
| 11 | Cem stabil BKFL (400-7010) | CY | 74 | $150.00 | $260.00 | $190.00 | $79.90 | $217.80 | $74.00 | $255.00 |
| 12 | Drilled shaft (traffic signal pole) (24 in) (416-7042) | LF | 6 | $225.00 | $290.00 | $380.00 | $187.09 | $188.44 | $210.00 | $159.00 |
| 13 | Drilled shaft (traffic signal pole) (30 in) (416-7043) | LF | 11 | $300.00 | $310.00 | $450.00 | $181.52 | $285.00 | $325.00 | $455.00 |
| 14 | Drilled shaft (traffic signal pole) (36 in) (416-7044) | LF | 26 | $375.00 | $300.00 | $605.85 | $204.05 | $320.00 | $395.00 | $435.00 |
| 15 | Mobilization (500-7001) | LS | 1 | $17,500 | $29,000 | $32,000 | $45,879 | $40,500 | $46,500 | $43,075 |
| 16 | Barricades, signs and traffic handling (502-7001) | MO | 4 | $5,000.00 | $3,200.00 | $4,000.00 | $2,874.35 | $3,150.00 | $4,900.00 | $919.00 |
| 17 | Portable changeable message sign (503-7002) | EACH | 2 | $1,000.00 | $500.00 | $1,000.00 | $257.05 | $300.00 | $2,500.00 | $4,004.00 |
| 18 | TMA (stationary) (505-7001) | DAY | 29 | $200.00 | $200.00 | $500.00 | $359.88 | $575.00 | $115.00 | $322.00 |
| 19 | TMA (mobile operation) (505-7003) | DAY | 1 | $300.00 | $690.00 | $500.00 | $476.72 | $575.00 | $115.00 | $880.00 |
| 20 | Temporary sediment control fence (install) (506-7039) | LF | 500 | $6.00 | $19.00 | $3.81 | $10.89 | $6.33 | $8.00 | $4.50 |
| 21 | Concrete curb & gutter (type II) (529-7009) | LF | 159 | $50.00 | $66.00 | $34.72 | $57.07 | $38.50 | $52.50 | $167.00 |
| 22 | Concrete sidewalks (6") (531-7003) | SY | 103 | $70.00 | $87.00 | $110.00 | $148.38 | $148.50 | $136.50 | $253.00 |
| 23 | Curb ramps (type 1) (531-7005) | EACH | 1 | $3,000.00 | $1,900.00 | $2,315.50 | $9,701.70 | $3,135.00 | $8,925.00 | $6,483.00 |
| 24 | Concrete sidewalks (special) (531-7025) | SY | 444 | $110.00 | $100.00 | $220.00 | $171.21 | $162.80 | $157.50 | $300.00 |
| 25 | Concrete median (nose) (536-7005) | SY | 5 | $350.00 | $770.00 | $350.00 | $228.28 | $330.00 | $210.00 | $513.00 |
| 26 | Conduit (PVC) (schedule 40) (2") (618-7030) | LF | 235 | $10.00 | $8.00 | $12.50 | $11.46 | $17.25 | $11.00 | $13.70 |
| 27 | Conduit (PVC) (schedule 40) (2") (bore) (618-7031) | LF | 115 | $22.00 | $15.00 | $16.40 | $16.48 | $19.25 | $18.00 | $18.60 |
| 28 | Conduit (PVC) (schedule 40) (4") (618-7040) | LF | 170 | $20.00 | $13.00 | $23.60 | $13.83 | $20.65 | $22.00 | $19.75 |
| 29 | Conduit (PVC) (schedule 40) (4") (bore) (618-7041) | LF | 335 | $30.00 | $24.00 | $32.30 | $18.85 | $23.65 | $31.00 | $26.65 |
| 30 | Conduit (RM) (4") (618-7086) | LF | 20 | $30.00 | $110.00 | $100.00 | $55.53 | $78.00 | $55.00 | $76.60 |
| 31 | Electrical conductor (no.8) insulated (620-7008) | LF | 820 | $2.00 | $1.00 | $2.30 | $2.25 | $2.80 | $2.35 | $2.00 |
| 32 | Electrical conductor (no.6) insulated (620-7010) | LF | 120 | $2.25 | $2.00 | $2.12 | $2.84 | $3.20 | $3.00 | $2.55 |
| 33 | Tray cable (3 conductor) (12 AWG) (621-7002) | LF | 240 | $4.00 | $3.00 | $2.80 | $3.10 | $3.35 | $3.25 | $3.35 |
| 34 | ITS GND box type 1 (304848)W/apron (623-7028) | EACH | 1 | $2,000.00 | $3,500.00 | $10,000 | $2,467.57 | $6,380.00 | $3,400.00 | $3,564.00 |
| 35 | Ground box type D (162922)W/apron (624-7008) | EACH | 4 | $1,500.00 | $1,500.00 | $1,350.00 | $1,185.62 | $1,180.00 | $1,610.00 | $1,276.00 |
| 36 | Elc SRV type D 120/240 060(NS)SS(E)PS(U) (628-7147) | EACH | 1 | $9,000.00 | $8,500.00 | $8,000.00 | $7,090.00 | $7,479.00 | $6,475.00 | $10,767 |
| 37 | Aluminum signs (type A) (636-7001) | SF | 64 | $45.00 | $74.00 | $30.00 | $28.84 | $62.03 | $30.00 | $32.15 |
| 38 | Install small roadside sign support and assembly type 10BWG(1)SB(P) (644-7009) | EACH | 1 | $800.00 | $1,100.00 | $900.00 | $980.25 | $1,279.50 | $1,000.00 | $1,119.00 |
| 39 | Remove SM RD SN sup&AM (644-7073) | EACH | 1 | $125.00 | $190.00 | $120.00 | $101.83 | $50.00 | $125.00 | $154.00 |
| 40 | Reflectorized pavement marking type I (W)8"(broken)(100MIL) (666-7015) | LF | 126 | $2.50 | $1.00 | $2.88 | $2.85 | $3.30 | $4.00 | $3.33 |
| 41 | Reflectorized pavement marking type I (W)8"(solid)(100MIL) (666-7024) | LF | 330 | $2.50 | $1.00 | $1.35 | $2.28 | $3.30 | $4.00 | $2.22 |
| 42 | Reflectorized pavement marking type I (W)24"(solid)(100MIL) (666-7036) | LF | 207 | $12.00 | $6.00 | $8.50 | $10.27 | $9.90 | $11.50 | $7.22 |
| 43 | Reflectorized pavement marking type I (W)(arrow)(100MIL) (666-7042) | EACH | 1 | $275.00 | $250.00 | $200.00 | $313.88 | $275.00 | $230.00 | $222.00 |
| 44 | Reflectorized pavement marking type I(W)(double arrow)(100MIL) (666-7045) | EACH | 1 | $325.00 | $320.00 | $268.50 | $370.95 | $385.00 | $275.00 | $333.00 |
| 45 | Reflectorized pavement marking type I (W)(word)(100MIL) (666-7066) | EACH | 1 | $300.00 | $250.00 | $218.00 | $336.71 | $275.00 | $275.00 | $222.00 |
| 46 | Reflectorized pavement marking type I (W)(bike arrow)(100MIL) (666-7093) | EACH | 1 | $200.00 | $250.00 | $116.00 | $264.96 | $132.00 | $200.00 | $139.00 |
| 47 | Reflectorized pavement marking type I(W)(bike syml)(100MIL) (666-7099) | EACH | 1 | $300.00 | $250.00 | $100.00 | $264.96 | $247.50 | $240.00 | $222.00 |
| 48 | Reflectorized pavement marking type I(Y)(med nose)(100MIL) (666-7132) | EACH | 2 | $500.00 | $320.00 | $500.00 | $285.34 | $302.50 | $190.00 | $389.00 |
| 49 | Pavement sler 8" (666-7348) | LF | 456 | $0.25 | $0.25 | $0.55 | $0.18 | $0.72 | $0.60 | $0.60 |
| 50 | Pavement sler 24" (666-7352) | LF | 207 | $0.50 | $3.00 | $2.28 | $0.55 | $0.84 | $1.25 | $2.22 |
| 51 | Pavement sler (arrow) (666-7353) | EACH | 1 | $15.00 | $19.00 | $38.00 | $5.71 | $22.00 | $21.00 | $55.55 |
| 52 | Pavement sler (word) (666-7354) | EACH | 1 | $15.00 | $19.00 | $32.00 | $5.71 | $22.00 | $21.00 | $55.55 |
| 53 | Pavement sler (med nose) (666-7355) | EACH | 2 | $50.00 | $190.00 | $250.00 | $5.70 | $49.50 | $6.00 | $84.00 |
| 54 | Pavement sler (double arrow) (666-7356) | EACH | 1 | $15.00 | $32.00 | $21.23 | $5.71 | $55.00 | $28.00 | $84.00 |
| 55 | Pavement sler (bike arrow) (666-7368) | EACH | 1 | $15.00 | $19.00 | $14.00 | $5.71 | $22.00 | $23.00 | $44.45 |
| 56 | Pavement sler (bike symbol) (666-7369) | EACH | 1 | $15.00 | $19.00 | $30.00 | $5.71 | $22.00 | $23.00 | $44.45 |
| 57 | Eliminating existing PM & markers (8") (677-7004) | LF | 200 | $2.50 | $0.75 | $0.90 | $25.68 | $0.32 | $1.15 | $2.22 |
| 58 | Pavement surface preparation for marking (8") (678-7004) | LF | 456 | $0.25 | $0.75 | $0.11 | $0.05 | $0.22 | $0.15 | $0.11 |
| 59 | Pavement surface preparation for marking (24") (678-7008) | LF | 207 | $0.50 | $3.00 | $0.55 | $0.13 | $0.44 | $0.60 | $0.60 |
| 60 | Pavement surface preparation for marking (arrow) (678-7009) | EACH | 1 | $15.00 | $32.00 | $15.30 | $1.14 | $11.00 | $17.00 | $5.60 |
| 61 | Pavement surface preparation for marking (double arrow) (678-7010) | EACH | 1 | $15.00 | $32.00 | $17.70 | $1.14 | $16.50 | $17.00 | $11.11 |
| 62 | Pavement surface preparation for marking (word) (678-7016) | EACH | 1 | $15.00 | $32.00 | $15.00 | $1.14 | $11.00 | $17.00 | $5.60 |
| 63 | Pavement surface preparation for marking (med nose) (678-7024) | EACH | 2 | $25.00 | $130.00 | $65.00 | $1.14 | $33.00 | $35.00 | $16.70 |
| 64 | Pavement surface preparation for marking (bike arrow) (678-7026) | EACH | 1 | $15.00 | $32.00 | $14.00 | $1.14 | $11.00 | $11.00 | $5.60 |
| 65 | Pavement surface preparation for marking (bike symbol) (678-7028) | EACH | 1 | $15.00 | $32.00 | $57.00 | $1.14 | $11.00 | $10.50 | $5.60 |
| 66 | Install highway traffic signal (isolated) (680-7002) | EACH | 1 | $35,000 | $58,000 | $37,500 | $42,417 | $46,293 | $65,000 | $56,372 |
| 67 | Vehicle signal section (12")LED(green) (682-7001) | EACH | 6 | $275.00 | $310.00 | $296.00 | $298.29 | $330.00 | $325.00 | $254.00 |
| 68 | Vehicle signal section (12")LED(green arrow) (682-7002) | EACH | 3 | $275.00 | $310.00 | $298.00 | $311.82 | $330.00 | $325.00 | $254.00 |
| 69 | Vehicle signal section (12")LED(yel) (682-7003) | EACH | 6 | $275.00 | $310.00 | $296.00 | $301.93 | $330.00 | $325.00 | $254.00 |
| 70 | Vehicle signal section (12")LED(yel arrow) (682-7004) | EACH | 4 | $275.00 | $310.00 | $310.00 | $303.15 | $330.00 | $325.00 | $254.00 |
| 71 | Vehicle signal section (12")LED(red) (682-7005) | EACH | 6 | $275.00 | $310.00 | $300.00 | $298.29 | $330.00 | $325.00 | $254.00 |
| 72 | Vehicle signal section (12")LED(red arrow) (682-7006) | EACH | 2 | $275.00 | $310.00 | $300.00 | $303.14 | $330.00 | $325.00 | $254.00 |
| 73 | Pedestrian signal section (LED)(countdown) (682-7018) | EACH | 4 | $650.00 | $840.00 | $808.00 | $1,031.17 | $700.00 | $650.00 | $603.00 |
| 74 | Back plate (12")(3 sect) (682-7052) | EACH | 5 | $200.00 | $210.00 | $177.00 | $184.28 | $150.00 | $175.00 | $193.00 |
| 75 | Back plate (12")(4 sect) (682-7053) | EACH | 3 | $225.00 | $240.00 | $249.00 | $253.53 | $225.00 | $235.00 | $222.00 |
| 76 | Traffic signal CBL (type A)(12 AWG)(2 conductor) (684-7007) | LF | 345 | $2.25 | $4.00 | $1.80 | $1.68 | $2.37 | $2.25 | $2.50 |
| 77 | Traffic signal CBL (type A)(12 AWG)(5 conductor) (684-7010) | LF | 385 | $3.00 | $4.00 | $2.62 | $2.98 | $3.60 | $2.85 | $3.80 |
| 78 | Traffic signal CBL (type A)(12 AWG)(7 conductor) (684-7012) | LF | 1,164 | $3.75 | $4.00 | $3.14 | $3.87 | $4.70 | $4.25 | $4.90 |
| 79 | Ins traffic signal PL AM(S)1 arm(32')lum (686-7035) | EACH | 1 | $14,000 | $14,000 | $15,624 | $15,013 | $14,649 | $15,775 | $12,633 |
| 80 | Ins traffic signal PL AM(S)1 arm(48') (686-7049) | EACH | 1 | $20,000 | $16,000 | $16,036 | $15,252 | $16,091 | $17,500 | $14,451 |
| 81 | Ins traffic signal PL AM(S)1 arm(48')lum (686-7051) | EACH | 1 | $19,000 | $19,000 | $19,184 | $17,877 | $18,788 | $22,000 | $17,501 |
| 82 | Pedestrian pole assembly (687-7001) | EACH | 1 | $2,500.00 | $1,600.00 | $2,974.00 | $2,523.24 | $1,615.00 | $2,000.00 | $3,582.00 |
| 83 | Pedestrian detect push button (APS) (688-7001) | EACH | 4 | $1,100.00 | $910.00 | $1,033.00 | $882.12 | $801.00 | $850.00 | $1,086.00 |
| 84 | Pedestrian detector controller unit (688-7003) | EACH | 1 | $4,000.00 | $3,900.00 | $3,810.00 | $3,994.50 | $3,715.00 | $4,000.00 | $4,640.00 |
| 85 | Bbu system (external battery cabinet) (6007-7001) | EACH | 1 | $9,000.00 | $12,000 | $8,000.00 | $7,530.93 | $10,000 | $7,700.00 | $12,965 |
| 86 | Vid image and radar det processor sys (6017-7018) | EACH | 1 | $25,000 | $41,000 | $10,500 | $35,882 | $41,610 | $41,000 | $31,617 |
| 87 | CCTV field equipment (digital) (6018-7002) | EACH | 1 | $6,000.00 | $8,000.00 | $4,881.00 | $10,332 | $7,205.00 | $8,200.00 | $9,050.00 |
| 88 | CCTV mount (pole) (6018-7003) | EACH | 1 | $500.00 | $320.00 | $347.00 | $2,311.93 | $110.00 | $175.00 | $1,109.00 |
| 89 | ITS com CBL (ethernet) (6018-7004) | LF | 175 | $3.00 | $3.00 | $1.98 | $2.77 | $3.00 | $4.00 | $1.60 |
The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.
Source
Read from TxDOT's tabulation for this contract. TxDOT Bid Tabulations open-data export (data.texas.gov) from September 2024, read 21 November 2026, and TxDOT's legacy Tabulation of Bids pages for January 2020 to August 2024. The legacy pages are a large sample, not every contract: their file names were reused from year to year. Their district is the one TxDOT gives the county. Bids that did not match their published total are left out.
Every contract let that day: TxDOT letting of March 5, 2026. Compiled by Mirage Metrics.