TxDOT contract A00219580 bid tabulation
BUNDLED BID, IH0635 (IH 30 to TI Blvd.). Let by Texas DOT on March 5, 2026, Dallas, Dallas District. 4 bids received; low bid $755,725 by Roy Jorgensen Associates, Inc., -37% against the engineer's estimate of $1,204,480.
- Owner
- Texas DOT
- Letting
- 05 MAR 2026
- Pay items
- 54
- Data through
- 19 NOV 2026
Bidders
| Rank | Bidder | Total bid | Against the low bid | Against the estimate |
|---|---|---|---|---|
| 1 | Roy Jorgensen Associates, Inc. | $755,725 | Low | -37% |
| 2 | Fireman Excavating, Inc. | $840,864 | +11% | -30% |
| 3 | BK Field Operations LLC | $2,210,086 | +192% | +83% |
| 4 | O. Trevino Construction, LLC | $2,452,776 | +225% | +104% |
Engineer's estimate: $1,204,480.
Bid tabulation
| Line | Pay item | Unit | Quantity | Estimate | 1. Roy Jorgensen Associates, Inc. | 2. Fireman Excavating, Inc. | 3. BK Field Operations LLC | 4. O. Trevino Construction, LLC |
|---|---|---|---|---|---|---|---|---|
| 1 | Full - depth repair CRCP (13") (361-7008) | CY | 50 | $1,200.00 | $1,400.00 | $100.00 | $1,500.00 | $1,500.00 |
| 2 | Opaque sealer finish (427-7003) | SF | 600 | $6.50 | $3.00 | $2.00 | $20.00 | $30.00 |
| 3 | Concrete structure repair(rapid deck rep(PRT DPT) (429-7004) | SF | 25 | $130.00 | $100.00 | $100.00 | $300.00 | $250.00 |
| 4 | Concrete structure repair(rapid deck rep(full DPT)) (429-7006) | SF | 12 | $75.00 | $150.00 | $200.00 | $500.00 | $400.00 |
| 5 | Concrete structure repair (vertical & overhead) (429-7007) | SF | 50 | $185.00 | $325.00 | $150.00 | $200.00 | $500.00 |
| 6 | Cleaning existing joints (438-7008) | LF | 6,594 | $15.00 | $10.00 | $5.00 | $50.00 | $45.00 |
| 7 | Mobilization (callout 1) (500-7003) | EACH | 3 | $600.00 | $250.00 | $7,500.00 | $2,000.00 | $4,000.00 |
| 8 | Mobilization (callout 2) (500-7004) | EACH | 5 | $600.00 | $2,500.00 | $2,500.00 | $1,000.00 | $2,200.00 |
| 9 | Mobilization (callout 3) (500-7005) | EACH | 10 | $600.00 | $250.00 | $2,000.00 | $1,000.00 | $550.00 |
| 10 | Mobilization (callout 4) (500-7006) | EACH | 5 | $600.00 | $250.00 | $2,500.00 | $1.00 | $550.00 |
| 11 | Mobilization (callout 5) (500-7007) | EACH | 2 | $600.00 | $250.00 | $2,500.00 | $1,000.00 | $2,200.00 |
| 12 | Mobilization (callout 6) (500-7008) | EACH | 4 | $600.00 | $10.00 | $5,000.00 | $2,000.00 | $1.00 |
| 13 | Mobilization (callout 7) (500-7009) | EACH | 2 | $600.00 | $500.00 | $7,500.00 | $2,000.00 | $3,200.00 |
| 14 | Mobilization (callout 8) (500-7010) | EACH | 4 | $600.00 | $500.00 | $500.00 | $1,000.00 | $2,200.00 |
| 15 | Mobilization (callout 9) (500-7011) | EACH | 80 | $600.00 | $50.00 | $1.00 | $1.00 | $2,200.00 |
| 16 | Mobilization (callout 10) (500-7012) | EACH | 12 | $600.00 | $250.00 | $1,000.00 | $1.00 | $2,200.00 |
| 17 | Mobilization (callout 11) (500-7013) | EACH | 60 | $600.00 | $10.00 | $3,000.00 | $1.00 | $4,001.00 |
| 18 | Mobilization (callout 12) (500-7014) | EACH | 25 | $600.00 | $250.00 | $1.00 | $800.00 | $550.00 |
| 19 | TMA (stationary) (505-7001) | DAY | 365 | $210.00 | $5.00 | $1.00 | $1.00 | $190.00 |
| 20 | TMA (mobile operation) (505-7003) | DAY | 25 | $325.00 | $750.00 | $300.00 | $1.00 | $750.00 |
| 21 | Replace existing aluminum signs(type A) (636-7004) | SF | 125 | $40.00 | $45.00 | $60.00 | $300.00 | $41.81 |
| 22 | Install small roadside sign support and assembly type 10BWG(1)SA(T) (644-7004) | EACH | 2 | $925.00 | $500.00 | $800.00 | $800.00 | $779.62 |
| 23 | Install small roadside sign support and assembly TYS80(1)SA(U-exal) (644-7036) | EACH | 2 | $1,400.00 | $500.00 | $1,000.00 | $900.00 | $2,014.46 |
| 24 | Install small roadside sign support and assembly (rail mount) (644-7063) | EACH | 5 | $4,500.00 | $750.00 | $300.00 | $800.00 | $7,220.65 |
| 25 | Relocate SM RD SN sup&AM type 10BWG (644-7065) | EACH | 2 | $630.00 | $750.00 | $200.00 | $900.00 | $821.48 |
| 26 | Relocate SM RD SN sup&AM type S80 (644-7067) | EACH | 2 | $650.00 | $750.00 | $200.00 | $900.00 | $894.73 |
| 27 | Relocate SM RD SN sup&AM(rail mount) (644-7071) | EACH | 2 | $1,500.00 | $500.00 | $200.00 | $700.00 | $2,087.71 |
| 28 | Remove SM RD SN sup&AM (644-7073) | EACH | 10 | $120.00 | $200.00 | $100.00 | $100.00 | $103.60 |
| 29 | Install delineator assembly (D-SW)SZ 1(BRF)CTB (658-7012) | EACH | 1,000 | $10.00 | $15.00 | $6.00 | $15.00 | $51.80 |
| 30 | Install delineator assembly (D-SY)SZ 1(BRF)CTB (658-7031) | EACH | 250 | $20.00 | $15.00 | $5.00 | $20.00 | $51.80 |
| 31 | Install delineator assembly (D-SY)SZ 1(BRF)CTB (BI) (658-7032) | EACH | 900 | $20.00 | $15.00 | $5.00 | $20.00 | $51.80 |
| 32 | Install delineator assembly (D-DW)SZ 1(WFLX)SRFHH (658-7143) | EACH | 85 | $70.00 | $75.00 | $190.00 | $20.00 | $256.39 |
| 33 | Replace delineator assembly (D-DW)SZ 1(WFLX)SRFHH (658-7225) | EACH | 40 | $60.00 | $150.00 | $100.00 | $20.00 | $256.39 |
| 34 | Reflectorized pavement marker type II-C-R (672-7006) | EACH | 1,806 | $6.50 | $7.00 | $6.00 | $40.00 | $10.00 |
| 35 | Emergency mobilization (700-7011) | EACH | 4 | $500.00 | $5,000.00 | $5,000.00 | $5,000.00 | $6,850.00 |
| 36 | Spalling repair (hydraulic cement) (720-7001) | CF | 100 | $175.00 | $165.00 | $100.00 | $1,000.00 | $354.66 |
| 37 | Fiber reinforced polymer patching materials (721-7001) | LB | 200 | $38.00 | $6.00 | $6.00 | $40.00 | $25.05 |
| 38 | Bulking aggregate (721-7002) | LB | 30 | $2.50 | $5.00 | $6.00 | $100.00 | $0.76 |
| 39 | Pavement edges, structures & fixtures (731-7003) | MI | 10.50 | $600.00 | $600.00 | $390.00 | $2,000.00 | $1,370.38 |
| 40 | Debris removal (CNTR medians/mainlanes) (735-7003) | MI | 520.31 | $127.00 | $100.00 | $60.00 | $300.00 | $164.44 |
| 41 | Debris removal (entrance/exit ramps) (735-7037) | MI | 367.80 | $115.00 | $100.00 | $60.00 | $300.00 | $164.45 |
| 42 | Debris removal (spot debris) (735-7072) | MI | 25 | $207.00 | $500.00 | $200.00 | $300.00 | $657.78 |
| 43 | Cleaning / sweeping (center median) (738-7001) | MI | 120.07 | $190.00 | $190.00 | $150.00 | $400.00 | $493.34 |
| 44 | Cleaning / sweeping (outside main lane) (738-7025) | MI | 120.07 | $197.00 | $190.00 | $150.00 | $400.00 | $493.34 |
| 45 | Cleaning / sweeping(entrance/exit ramp) (738-7070) | MI | 84.88 | $131.00 | $190.00 | $150.00 | $400.00 | $493.36 |
| 46 | Cleaning / sweeping (handwork) (738-7105) | SY | 5,000 | $5.00 | $1.25 | $0.25 | $30.00 | $1.64 |
| 47 | Handwork - drain slots, barrier slots (738-7130) | LF | 6,144 | $1.80 | $6.00 | $0.72 | $40.00 | $1.64 |
| 48 | Repair (SMTC) narrow (774-7003) | LF | 400 | $260.00 | $25.00 | $1.00 | $200.00 | $379.74 |
| 49 | Repair (quad - elite) narrow (774-7009) | LF | 400 | $150.00 | $25.00 | $1.00 | $300.00 | $379.74 |
| 50 | Repair (react)(M) (774-7015) | LF | 400 | $200.00 | $25.00 | $1.00 | $200.00 | $379.74 |
| 51 | Repair (tau-M) narrow (774-7037) | LF | 400 | $250.00 | $100.00 | $1.00 | $200.00 | $379.74 |
| 52 | Replace crash cushion attenuator (L)(N)(TL3) (774-7077) | EACH | 5 | $23,150 | $23,500 | $50,000 | $30,000 | $33,227 |
| 53 | Repair attenuator object marker (774-7083) | EACH | 10 | $1,100.00 | $500.00 | $1,000.00 | $1,000.00 | $142.40 |
| 54 | Lane closure(setup & rem)(typ 11) (790-7011) | EACH | 25 | $515.00 | $1,000.00 | $500.00 | $3,000.00 | $650.00 |
The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.
Source
Read from TxDOT's tabulation for this contract. TxDOT Bid Tabulations open-data export (data.texas.gov) from September 2024, read 21 November 2026, and TxDOT's legacy Tabulation of Bids pages for January 2020 to August 2024. The legacy pages are a large sample, not every contract: their file names were reused from year to year. Their district is the one TxDOT gives the county. Bids that did not match their published total are left out.
Every contract let that day: TxDOT letting of March 5, 2026. Compiled by Mirage Metrics.