TxDOT contract A00191311 bid tabulation
Hazard Elimination & Safety, Various (various locations in to the Lubbock District). Let by Texas DOT on March 5, 2026, Lubbock, Lubbock District. 5 bids received; low bid $1,984,573 by L&L Company, +14% against the engineer's estimate of $1,736,849.
- Owner
- Texas DOT
- Letting
- 05 MAR 2026
- Pay items
- 56
- Data through
- 19 NOV 2026
Bidders
| Rank | Bidder | Total bid | Against the low bid | Against the estimate |
|---|---|---|---|---|
| 1 | L&L Company | $1,984,573 | Low | +14% |
| 2 | Centerline Technologies, LLC | $2,289,373 | +15% | +32% |
| 3 | The Confidence Group, Inc | $2,649,266 | +33% | +53% |
| 4 | TRP Infrastructure Services, LLC | $2,962,319 | +49% | +71% |
| 5 | Stripe-A-Zone, LLC | $3,251,106 | +64% | +87% |
Engineer's estimate: $1,736,849.
Bid tabulation
| Line | Pay item | Unit | Quantity | Estimate | 1. L&L Company | 2. Centerline Technologies, LLC | 3. The Confidence Group, Inc | 4. TRP Infrastructure Services, LLC | 5. Stripe-A-Zone, LLC |
|---|---|---|---|---|---|---|---|---|---|
| 1 | Mobilization (500-7001) | LS | 1 | $5,000.00 | $1.00 | $7,500.00 | $50,000 | $250,000 | $50,000 |
| 2 | Barricades, signs and traffic handling (502-7001) | MO | 6 | $1,000.00 | $1.00 | $1.00 | $1.00 | $500.00 | $2,500.00 |
| 3 | TMA (mobile operation) (505-7003) | DAY | 540 | $10.00 | $1.00 | $1.00 | $1.00 | $10.00 | $1.00 |
| 4 | Reflectorized pavement marking type I(Y)(med nose)(100MIL) (666-7132) | EACH | 43 | $75.00 | $500.00 | $300.00 | $200.00 | $191.00 | $600.00 |
| 5 | Reflectorized pavement marking type III (W)(6")(solid) (666-7236) | LF | 282,980 | $0.60 | $0.75 | $0.73 | $1.50 | $0.63 | $0.85 |
| 6 | Reflectorized pavement marking type III (W)(6")(broken) (666-7237) | LF | 620 | $0.80 | $0.75 | $2.00 | $5.00 | $0.69 | $0.90 |
| 7 | Reflectorized pavement marking type III (W)(8")(solid) (666-7239) | LF | 53,310 | $0.85 | $0.90 | $1.01 | $0.95 | $1.10 | $1.00 |
| 8 | Reflectorized pavement marking type III (W)(12")(DOT) (666-7243) | LF | 2,570 | $2.00 | $3.00 | $2.90 | $2.50 | $2.00 | $2.50 |
| 9 | Reflectorized pavement marking type III (Y)(6")(solid) (666-7248) | LF | 285,950 | $0.60 | $0.75 | $0.73 | $1.50 | $0.63 | $0.85 |
| 10 | Prefabricated PM type B (W)(6")(solid) (668-7009) | LF | 1,020 | $9.50 | $7.00 | $0.70 | $10.00 | $5.55 | $9.25 |
| 11 | Prefabricated PM type B (W)(6")(broken)contrast (668-7012) | LF | 2,400 | $12.00 | $12.00 | $13.00 | $15.00 | $10.75 | $14.50 |
| 12 | Prefabricated PM type B (W)(8")(solid) (668-7014) | LF | 6,970 | $11.00 | $8.00 | $8.25 | $12.00 | $7.15 | $11.00 |
| 13 | Prefabricated PM type B (W)(8")(DOT) (668-7015) | LF | 606 | $10.00 | $10.00 | $10.00 | $11.00 | $10.75 | $11.95 |
| 14 | Prefabricated PM type B (W)(24")(solid) (668-7021) | LF | 2,348 | $21.00 | $21.00 | $20.00 | $28.00 | $25.00 | $22.50 |
| 15 | Prefabricated PM type B (W)(24")(solid)contrast (668-7022) | LF | 1,806 | $24.00 | $32.00 | $29.00 | $25.00 | $39.00 | $30.50 |
| 16 | Prefabricated PM type B (W)(36")(yld tri) (668-7038) | EACH | 152 | $60.00 | $60.00 | $30.00 | $100.00 | $122.00 | $95.00 |
| 17 | Prefabricated PM type B (Y)(6")(solid) (668-7051) | LF | 5,540 | $7.00 | $7.00 | $8.00 | $10.00 | $5.60 | $9.25 |
| 18 | Prefabricated PM type B (Y)(24")(solid) (668-7056) | LF | 200 | $21.00 | $22.00 | $20.00 | $23.00 | $25.00 | $22.50 |
| 19 | Prefabricated PM type B (W)(word)contrast (668-7060) | EACH | 52 | $700.00 | $1,500.00 | $3,000.00 | $500.00 | $4,200.00 | $4,100.00 |
| 20 | Prefabricated PM type B (W)(arrow)contrast (668-7061) | EACH | 223 | $625.00 | $1,000.00 | $1,500.00 | $500.00 | $2,800.00 | $2,800.00 |
| 21 | Prefabricated PM type B(W)(LN reduct arrw)CNTST (668-7062) | EACH | 7 | $900.00 | $1,500.00 | $2,600.00 | $1,100.00 | $4,500.00 | $3,500.00 |
| 22 | Prefabricated PM type B (W)(double arrw)CNTST (668-7063) | EACH | 78 | $800.00 | $1,400.00 | $2,400.00 | $700.00 | $3,540.00 | $3,500.00 |
| 23 | Prefabricated PM type B (W)(uturn arrow)CNTST (668-7064) | EACH | 11 | $700.00 | $1,700.00 | $2,400.00 | $800.00 | $3,700.00 | $2,500.00 |
| 24 | Prefabricated PM type B (multi)(shield) (668-7071) | EACH | 26 | $800.00 | $4,000.00 | $3,500.00 | $2,500.00 | $5,200.00 | $10,000 |
| 25 | Prefabricated PM type C (W)(6")(broken) (668-7077) | LF | 580 | $5.50 | $9.00 | $6.00 | $16.00 | $2.65 | $6.25 |
| 26 | Prefabricated PM type C (W)(6")(solid) (668-7080) | LF | 480 | $7.00 | $8.00 | $6.00 | $7.00 | $2.65 | $6.00 |
| 27 | Prefabricated PM type C (W)(8")(DOT) (668-7082) | LF | 36 | $10.00 | $8.00 | $6.00 | $12.00 | $3.60 | $7.50 |
| 28 | Prefabricated PM type C (W)(8")(solid) (668-7084) | LF | 2,625 | $10.00 | $7.00 | $6.00 | $8.00 | $3.60 | $7.25 |
| 29 | Prefabricated PM type C (W)(12")(solid) (668-7087) | LF | 290 | $14.00 | $8.00 | $12.00 | $10.00 | $5.65 | $8.00 |
| 30 | Prefabricated PM type C (W)(18")(solid) (668-7088) | LF | 646 | $10.00 | $11.00 | $12.00 | $15.00 | $8.05 | $10.00 |
| 31 | Prefabricated PM type C (W)(24")(solid) (668-7089) | LF | 9,822 | $10.00 | $12.00 | $13.00 | $13.00 | $10.75 | $11.25 |
| 32 | Prefabricated PM type C (W)(24")(solid)contrast (668-7090) | LF | 92 | $35.00 | $30.00 | $18.00 | $35.00 | $13.00 | $22.50 |
| 33 | Prefabricated PM type C (W)(arrow) (668-7091) | EACH | 464 | $210.00 | $150.00 | $190.00 | $200.00 | $222.00 | $210.00 |
| 34 | Prefabricated PM type C (W)(arrow)contrast (668-7092) | EACH | 4 | $550.00 | $500.00 | $250.00 | $400.00 | $334.00 | $275.00 |
| 35 | Prefabricated PM type C (W)(double arrow) (668-7093) | EACH | 15 | $350.00 | $350.00 | $225.00 | $358.00 | $426.00 | $325.00 |
| 36 | Prefabricated PM type C (W)(LN reduct arrow) (668-7100) | EACH | 8 | $250.00 | $500.00 | $350.00 | $521.00 | $408.00 | $425.00 |
| 37 | Prefabricated PM type C (W)(word) (668-7103) | EACH | 10 | $250.00 | $250.00 | $225.00 | $325.00 | $299.00 | $265.00 |
| 38 | Prefabricated PM type C (W)(RR crossing) (668-7108) | EACH | 52 | $250.00 | $500.00 | $650.00 | $550.00 | $732.00 | $595.00 |
| 39 | Prefabricated PM type C (W)(36")(yld tri) (668-7111) | EACH | 212 | $35.00 | $30.00 | $20.00 | $55.00 | $68.00 | $50.00 |
| 40 | Prefabricated PM type C (Y)(6")(solid) (668-7123) | LF | 2,775 | $8.00 | $7.00 | $6.00 | $12.00 | $2.75 | $6.00 |
| 41 | Prefabricated PM type C (Y)(12")(solid) (668-7125) | LF | 244 | $14.00 | $8.00 | $8.00 | $10.00 | $5.90 | $8.00 |
| 42 | Eliminating existing PM & markers (4") (677-7001) | LF | 578,830 | $0.50 | $0.35 | $0.45 | $0.60 | $0.37 | $0.65 |
| 43 | Eliminating existing PM & markers (6") (677-7002) | LF | 1,015 | $0.60 | $0.50 | $0.50 | $0.40 | $0.37 | $0.65 |
| 44 | Eliminating existing PM & markers (8") (677-7004) | LF | 62,927 | $0.80 | $0.70 | $0.60 | $0.65 | $0.74 | $0.75 |
| 45 | Eliminating existing PM & markers (10") (677-7005) | LF | 2,030 | $3.00 | $1.00 | $0.70 | $1.00 | $2.15 | $1.50 |
| 46 | Eliminating existing PM & markers (12") (677-7006) | LF | 9,250 | $0.95 | $2.00 | $0.80 | $1.00 | $1.75 | $1.95 |
| 47 | Eliminating existing PM & markers (18") (677-7007) | LF | 646 | $1.25 | $3.00 | $0.90 | $0.50 | $1.95 | $2.50 |
| 48 | Eliminating existing PM & markers (24") (677-7008) | LF | 10,990 | $1.75 | $4.00 | $2.00 | $2.00 | $2.90 | $3.00 |
| 49 | Eliminating existing PM & markers (arrow) (677-7009) | EACH | 557 | $100.00 | $70.00 | $75.00 | $170.00 | $41.00 | $90.00 |
| 50 | Eliminating existing PM & markers (double arrow) (677-7010) | EACH | 80 | $125.00 | $80.00 | $100.00 | $70.00 | $58.00 | $125.00 |
| 51 | Eliminating existing PM & markers (uturn arrow) (677-7012) | EACH | 11 | $200.00 | $80.00 | $150.00 | $140.00 | $72.00 | $125.00 |
| 52 | Eliminating existing PM & markers (word) (677-7015) | EACH | 30 | $200.00 | $80.00 | $100.00 | $180.00 | $48.00 | $60.00 |
| 53 | Eliminating existing PM & markers (RR crossing) (677-7019) | EACH | 57 | $300.00 | $150.00 | $250.00 | $400.00 | $181.00 | $150.00 |
| 54 | Eliminating existing PM & markers (med nose) (677-7021) | EACH | 42 | $200.00 | $150.00 | $150.00 | $170.00 | $87.00 | $150.00 |
| 55 | Eliminating existing PM & markers (shield) (677-7022) | EACH | 4 | $300.00 | $200.00 | $250.00 | $310.00 | $272.00 | $1,500.00 |
| 56 | Eliminating existing PM & markers (36")(yld tri) (677-7024) | EACH | 318 | $30.00 | $20.00 | $20.00 | $500.00 | $35.00 | $20.00 |
The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.
Source
Read from TxDOT's tabulation for this contract. TxDOT Bid Tabulations open-data export (data.texas.gov) from September 2024, read 21 November 2026, and TxDOT's legacy Tabulation of Bids pages for January 2020 to August 2024. The legacy pages are a large sample, not every contract: their file names were reused from year to year. Their district is the one TxDOT gives the county. Bids that did not match their published total are left out.
Every contract let that day: TxDOT letting of March 5, 2026. Compiled by Mirage Metrics.