TxDOT contract A00211470 bid tabulation
Hazard Elimination & Safety, Various (VARIOUS LOCATIONS to IN THE ABILENE DISTRICT). Let by Texas DOT on March 5, 2026, Taylor, Abilene District. 6 bids received; low bid $440,762 by Stripe Lines, Inc., -47% against the engineer's estimate of $838,690.
- Owner
- Texas DOT
- Letting
- 05 MAR 2026
- Pay items
- 32
- Data through
- 19 NOV 2026
Bidders
| Rank | Bidder | Total bid | Against the low bid | Against the estimate |
|---|---|---|---|---|
| 1 | Stripe Lines, Inc. | $440,762 | Low | -47% |
| 2 | L&L Company | $467,745 | +6.0% | -44% |
| 3 | The Confidence Group, Inc | $511,298 | +16% | -39% |
| 4 | Stripe-A-Zone, LLC | $632,691 | +44% | -25% |
| 5 | Flat Line, Inc. | $808,523 | +83% | -4.0% |
| 6 | TRP Infrastructure Services, LLC | $833,136 | +89% | -1.0% |
Engineer's estimate: $838,690.
Bid tabulation
| Line | Pay item | Unit | Quantity | Estimate | 1. Stripe Lines, Inc. | 2. L&L Company | 3. The Confidence Group, Inc | 4. Stripe-A-Zone, LLC | 5. Flat Line, Inc. | 6. TRP Infrastructure Services, LLC |
|---|---|---|---|---|---|---|---|---|---|---|
| 1 | Mobilization (500-7001) | LS | 1 | $30,000 | $20,000 | $200,000 | $10,000 | $55,000 | $30,000 | $75,000 |
| 2 | Barricades, signs and traffic handling (502-7001) | MO | 2 | $15,000 | $3,500.00 | $1.00 | $3,000.00 | $5,000.00 | $15,000 | $7,500.00 |
| 3 | TMA (stationary) (505-7001) | DAY | 15 | $200.00 | $250.00 | $1.00 | $1.00 | $250.00 | $1.00 | $500.00 |
| 4 | TMA (mobile operation) (505-7003) | DAY | 36 | $350.00 | $10.00 | $1.00 | $1.00 | $250.00 | $500.00 | $500.00 |
| 5 | Reflectorized pavement marking type II (W) (bike arrow) (666-7203) | EACH | 9 | $300.00 | $75.00 | $100.00 | $300.00 | $175.00 | $200.00 | $125.00 |
| 6 | Reflectorized pavement marking type II (W) (bike symbol) (666-7205) | EACH | 9 | $300.00 | $75.00 | $100.00 | $300.00 | $225.00 | $200.00 | $150.00 |
| 7 | Reflectorized pavement marking type II (W) (bike DOT) (666-7207) | EACH | 9 | $250.00 | $75.00 | $100.00 | $300.00 | $50.00 | $200.00 | $5.00 |
| 8 | Reflectorized pavement marking type II (W)(acc PRK)(symbol only) (666-7222) | EACH | 1 | $350.00 | $50.00 | $100.00 | $1,000.00 | $275.00 | $500.00 | $500.00 |
| 9 | Reflectorized pavement marking type III (W)(6")(solid) (666-7236) | LF | 63,750 | $3.30 | $0.76 | $0.70 | $1.20 | $1.35 | $0.81 | $1.65 |
| 10 | Reflectorized pavement marking type III (W)(6")(broken) (666-7237) | LF | 38,855 | $1.60 | $0.76 | $0.70 | $1.20 | $1.35 | $0.81 | $1.65 |
| 11 | Reflectorized pavement marking type III (W)(6")(DOT) (666-7238) | LF | 11,735 | $1.00 | $0.76 | $0.80 | $1.50 | $2.75 | $4.00 | $2.60 |
| 12 | Reflectorized pavement marking type III (W)(8")(solid) (666-7239) | LF | 8,570 | $3.00 | $1.06 | $0.90 | $1.65 | $1.75 | $2.00 | $2.25 |
| 13 | Reflectorized pavement marking type III (W)(8")(DOT) (666-7241) | LF | 400 | $2.00 | $1.06 | $1.00 | $4.00 | $2.00 | $5.00 | $3.00 |
| 14 | Reflectorized pavement marking type III (W)(24")(solid) (666-7244) | LF | 3,389 | $7.50 | $9.56 | $3.00 | $5.00 | $13.50 | $20.00 | $18.75 |
| 15 | Reflectorized pavement marking type III (Y)(6")(solid) (666-7248) | LF | 74,565 | $3.20 | $0.76 | $0.70 | $1.20 | $1.35 | $0.81 | $1.65 |
| 16 | Reflectorized pavement marking type III (Y)(24")(solid) (666-7253) | LF | 1,300 | $14.00 | $9.75 | $3.00 | $5.00 | $13.50 | $20.00 | $18.75 |
| 17 | Reflectorized pavement marking type III (W)(arrow) (666-7254) | EACH | 115 | $300.00 | $200.76 | $100.00 | $300.00 | $285.00 | $500.00 | $455.00 |
| 18 | Reflectorized pavement marking type III (W)(double arrow) (666-7255) | EACH | 12 | $425.00 | $250.00 | $150.00 | $400.00 | $400.00 | $750.00 | $581.00 |
| 19 | Reflectorized pavement marking type III (W)(U-turn arrow) (666-7256) | EACH | 8 | $475.00 | $275.00 | $150.00 | $400.00 | $400.00 | $750.00 | $581.00 |
| 20 | Reflectorized pavement marking type III (W)(word) (666-7257) | EACH | 103 | $340.00 | $210.00 | $200.00 | $300.00 | $285.00 | $500.00 | $485.00 |
| 21 | Reflectorized pavement marking type III (W)(36" yld tri) (666-7260) | EACH | 93 | $300.00 | $75.00 | $30.00 | $70.00 | $90.00 | $60.00 | $169.00 |
| 22 | Eliminating existing PM & markers (6") (677-7002) | LF | 49,605 | $0.50 | $1.53 | $0.50 | $1.00 | $1.35 | $2.00 | $1.50 |
| 23 | Eliminating existing PM & markers (8") (677-7004) | LF | 8,970 | $1.00 | $3.31 | $0.60 | $1.00 | $1.35 | $3.00 | $2.00 |
| 24 | Eliminating existing PM & markers (24") (677-7008) | LF | 4,410 | $2.00 | $4.60 | $4.00 | $5.00 | $4.00 | $20.00 | $6.75 |
| 25 | Eliminating existing PM & markers (arrow) (677-7009) | EACH | 109 | $37.00 | $85.10 | $70.00 | $180.00 | $90.00 | $300.00 | $101.00 |
| 26 | Eliminating existing PM & markers (double arrow) (677-7010) | EACH | 12 | $40.00 | $97.75 | $120.00 | $300.00 | $125.00 | $300.00 | $145.00 |
| 27 | Eliminating existing PM & markers (uturn arrow) (677-7012) | EACH | 8 | $52.00 | $120.75 | $100.00 | $400.00 | $125.00 | $300.00 | $169.00 |
| 28 | Eliminating existing PM & markers (word) (677-7015) | EACH | 97 | $45.00 | $97.75 | $100.00 | $100.00 | $90.00 | $300.00 | $113.00 |
| 29 | Eliminating existing PM & markers (36")(yld tri) (677-7024) | EACH | 93 | $15.00 | $42.55 | $20.00 | $100.00 | $25.00 | $30.00 | $51.00 |
| 30 | Eliminating existing PM & marks (bike arrow) (677-7025) | EACH | 9 | $100.00 | $62.94 | $80.00 | $400.00 | $80.00 | $250.00 | $68.00 |
| 31 | Eliminating existing PM & marks (bike symbol) (677-7027) | EACH | 9 | $100.00 | $72.45 | $80.00 | $400.00 | $80.00 | $250.00 | $68.00 |
| 32 | Eliminating existing PM & marks (bike DOT) (677-7029) | EACH | 9 | $75.00 | $65.55 | $80.00 | $400.00 | $5.00 | $250.00 | $68.00 |
The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.
Source
Read from TxDOT's tabulation for this contract. TxDOT Bid Tabulations open-data export (data.texas.gov) from September 2024, read 21 November 2026, and TxDOT's legacy Tabulation of Bids pages for January 2020 to August 2024. The legacy pages are a large sample, not every contract: their file names were reused from year to year. Their district is the one TxDOT gives the county. Bids that did not match their published total are left out.
Every contract let that day: TxDOT letting of March 5, 2026. Compiled by Mirage Metrics.
Your own bid history, read the same way
Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.