TxDOT contract A00211476 bid tabulation
Bridge Maintenance, SH 71 (At Oatman Creek to #14-150-0-0700-04-016.). Let by Texas DOT on July 1, 2026, Llano, Austin District. 11 bids received; low bid $526,435 by Taylor Bridge LLC, -34% against the engineer's estimate of $792,464.
- Owner
- Texas DOT
- Letting
- 01 JUL 2026
- Pay items
- 46
- Data through
- 19 NOV 2026
Bidders
| Rank | Bidder | Total bid | Against the low bid | Against the estimate |
|---|---|---|---|---|
| 1 | Taylor Bridge LLC | $526,435 | Low | -34% |
| 2 | Structural Integrity Group LLC | $601,218 | +14% | -24% |
| 3 | Gibson & Associates, Inc. | $714,684 | +36% | -10% |
| 4 | The Truesdell Corporation | $789,789 | +50% | 0.0% |
| 5 | Icos Management, LLC | $817,917 | +55% | +3.0% |
| 6 | Ragle Construction, Inc. | $819,672 | +56% | +3.0% |
| 7 | Built Right Construction of Oklahoma, LLC | $826,760 | +57% | +4.0% |
| 8 | Garret Shields Infrastructure | $868,875 | +65% | +10% |
| 9 | MPB, Inc. | $875,664 | +66% | +10% |
| 10 | Rear Contractors LLC | $1,073,257 | +104% | +35% |
| 11 | Structural Technologies, LLC | $1,614,480 | +207% | +104% |
Engineer's estimate: $792,464.
Bid tabulation
| Line | Pay item | Unit | Quantity | Estimate | 1. Taylor Bridge LLC | 2. Structural Integrity Group LLC | 3. Gibson & Associates, Inc. | 4. The Truesdell Corporation | 5. Icos Management, LLC | 6. Ragle Construction, Inc. |
|---|---|---|---|---|---|---|---|---|---|---|
| 1 | Planing asphalt concrete pavement (0" to 2" micro) (354-7046) | SY | 871 | $3.00 | $10.00 | $28.00 | $37.68 | $10.50 | $21.00 | $15.00 |
| 2 | Penetrating concrete surface treatment (428-7001) | SY | 195 | $11.00 | $30.00 | $74.00 | $79.00 | $41.00 | $21.00 | $20.00 |
| 3 | Concrete structure repair(clean & coat WTH epoxy) (429-7001) | SF | 173 | $250.00 | $50.00 | $133.00 | $74.00 | $68.00 | $84.00 | $150.00 |
| 4 | Concrete structure repair(rapid deck rep(PRT DPT) (429-7004) | SF | 392 | $180.00 | $45.00 | $1.00 | $40.00 | $84.00 | $189.00 | $55.00 |
| 5 | Concrete structure repair (vertical & overhead) (429-7007) | SF | 158 | $205.00 | $825.00 | $242.00 | $325.00 | $305.00 | $147.00 | $250.00 |
| 6 | Riprap (mow strip)(4 in) (432-7013) | CY | 19.80 | $720.00 | $400.00 | $585.00 | $643.50 | $525.00 | $735.00 | $640.00 |
| 7 | Cleaning and sealing existing joints (CL3) (438-7004) | LF | 416 | $42.00 | $20.00 | $48.00 | $60.50 | $40.00 | $42.00 | $18.00 |
| 8 | Cleaning and sealing existing joints (CL7) (438-7007) | LF | 108 | $36.00 | $20.00 | $34.00 | $75.00 | $42.00 | $63.00 | $23.00 |
| 9 | Polyester polymer concrete overlay (1") (439-7021) | SY | 871 | $200.00 | $180.00 | $200.00 | $152.00 | $214.00 | $189.00 | $265.00 |
| 10 | Retrofit rail (type SSTR) (451-7024) | LF | 320 | $250.00 | $100.00 | $250.00 | $222.00 | $140.00 | $315.00 | $175.00 |
| 11 | Mobilization (500-7001) | LS | 1 | $45,000 | $50,000 | $65,000 | $91,000 | $186,781 | $56,000 | $81,000 |
| 12 | Barricades, signs and traffic handling (502-7001) | MO | 7 | $9,000.00 | $1.00 | $3,375.00 | $8,500.00 | $2,100.00 | $1.10 | $9,500.00 |
| 13 | TMA (stationary) (505-7001) | DAY | 98 | $215.00 | $1.00 | $1.00 | $200.00 | $25.00 | $262.50 | $100.00 |
| 14 | TMA (mobile operation) (505-7003) | DAY | 2 | $300.00 | $500.00 | $1.00 | $750.00 | $1,900.00 | $525.00 | $550.00 |
| 15 | Rock filter dams (install) (type 2) (506-7002) | LF | 516 | $40.00 | $10.00 | $1.00 | $46.20 | $79.00 | $30.00 | $42.00 |
| 16 | Rock filter dams (remove) (506-7011) | LF | 516 | $14.00 | $1.00 | $1.00 | $24.20 | $54.00 | $5.25 | $22.00 |
| 17 | Temporary sediment control fence (install) (506-7039) | LF | 300 | $4.00 | $1.00 | $1.00 | $5.23 | $22.00 | $2.10 | $4.75 |
| 18 | Temporary sediment control fence (remove) (506-7041) | LF | 300 | $1.25 | $1.00 | $1.00 | $1.10 | $8.50 | $1.10 | $1.00 |
| 19 | Biodegradable erosion control logs (install) (12") (506-7044) | LF | 2,412 | $7.00 | $1.00 | $1.00 | $4.02 | $10.50 | $10.50 | $3.65 |
| 20 | Biodegradable erosion control logs (remove) (506-7046) | LF | 2,412 | $1.75 | $1.00 | $1.00 | $1.10 | $5.25 | $5.25 | $1.00 |
| 21 | Portable concrete traffic barrier (furnish and install)(F-shape)(type 1) (512-7005) | LF | 330 | $75.00 | $40.00 | $48.00 | $44.00 | $57.00 | $147.00 | $300.00 |
| 22 | Portable concrete traffic barrier (move)(F-shape)(type 1) (512-7029) | LF | 300 | $10.00 | $5.00 | $18.00 | $15.00 | $5.25 | $84.00 | $12.00 |
| 23 | Portable concrete traffic barrier (remove)(F-shape)(type 1) (512-7053) | LF | 330 | $25.00 | $5.00 | $48.00 | $18.50 | $21.25 | $84.00 | $12.00 |
| 24 | Metal W-beam guard fence (timber post) (540-7001) | LF | 75 | $30.00 | $40.00 | $28.25 | $31.08 | $31.50 | $30.45 | $28.25 |
| 25 | Metal beam guard fence trans (thrie-beam) (540-7005) | EACH | 3 | $3,000.00 | $3,500.00 | $2,000.00 | $2,200.00 | $3,150.00 | $3,150.00 | $2,000.00 |
| 26 | Remove metal beam guard fence (542-7001) | LF | 200 | $5.00 | $5.00 | $1.50 | $1.65 | $2.40 | $4.20 | $1.50 |
| 27 | RM metal beam guard fence trans (T101) (542-7005) | EACH | 4 | $370.00 | $200.00 | $170.00 | $187.00 | $2.40 | $525.00 | $170.00 |
| 28 | Guardrail end treatment (install) (544-7001) | EACH | 3 | $3,500.00 | $2,500.00 | $3,504.00 | $3,854.40 | $3,600.00 | $4,200.00 | $3,504.00 |
| 29 | Guardrail end treatment (remove) (544-7003) | EACH | 4 | $320.00 | $250.00 | $150.00 | $165.00 | $3.00 | $525.00 | $150.00 |
| 30 | Crash cushion attenuator (move & reset) (545-7002) | EACH | 2 | $2,500.00 | $500.00 | $850.00 | $1,500.00 | $1,280.00 | $4,200.00 | $950.00 |
| 31 | Crash cushion attenuator (remove) (545-7004) | EACH | 2 | $900.00 | $500.00 | $375.00 | $500.00 | $1,600.00 | $2,100.00 | $1,050.00 |
| 32 | Crash cushion attenuator (install)(L)(N)(TL3) (545-7006) | EACH | 1 | $25,000 | $12,500 | $39,150 | $39,700 | $9,500.00 | $7,350.00 | $20,000 |
| 33 | Cca (install)(N)(TL3)(work zone) (545-7018) | EACH | 2 | $8,000.00 | $6,000.00 | $3,500.00 | $8,200.00 | $7,900.00 | $9,450.00 | $9,500.00 |
| 34 | Temporary RD IL setup and remove (617-7001) | EACH | 6 | $8,500.00 | $50.00 | $1.00 | $100.00 | $1.00 | $8,400.00 | $4,000.00 |
| 35 | Install delineator assembly (D-SW)SZ 1(BRF)CTB (BI) (658-7013) | EACH | 6 | $15.00 | $10.00 | $11.00 | $12.10 | $10.50 | $31.50 | $11.00 |
| 36 | Install delineator assembly (D-SW)SZ 1(BRF)GF1 (BI) (658-7016) | EACH | 4 | $18.00 | $10.00 | $16.50 | $18.15 | $10.50 | $31.50 | $16.50 |
| 37 | Install object marker assembly (OM-2Y)(WC)GND (658-7056) | EACH | 4 | $82.00 | $100.00 | $120.00 | $13.20 | $160.00 | $525.00 | $120.00 |
| 38 | Work zone pavement marking non-removing (W)6"(solid) (662-7008) | LF | 300 | $0.20 | $3.00 | $2.50 | $2.75 | $2.75 | $3.15 | $2.50 |
| 39 | Work zone pavement marking non-removing (Y)6"(solid) (662-7038) | LF | 300 | $0.25 | $1.00 | $2.50 | $2.75 | $2.75 | $3.15 | $2.50 |
| 40 | Work zone pavement marking SHT terminal (tab)type W (662-7112) | EACH | 15 | $2.10 | $100.00 | $3.00 | $10.00 | $12.50 | $6.30 | $1.00 |
| 41 | Work zone pavement marking SHT terminal (tab)type Y (662-7113) | EACH | 15 | $1.30 | $100.00 | $3.00 | $10.00 | $12.50 | $6.30 | $1.00 |
| 42 | Reflectorized pavement marking type I (W)6"(solid)(090MIL) (666-7410) | LF | 300 | $0.50 | $16.00 | $5.00 | $5.50 | $5.25 | $6.30 | $5.00 |
| 43 | Reflectorized pavement marking type I (Y)6"(solid)(090MIL) (666-7422) | LF | 300 | $0.50 | $8.00 | $5.00 | $5.50 | $5.25 | $6.30 | $5.00 |
| 44 | Reflectorized pavement marker type II-A-A (672-7004) | EACH | 8 | $5.00 | $50.00 | $20.00 | $22.00 | $22.00 | $23.10 | $20.00 |
| 45 | Pavement surface preparation for marking (6") (678-7002) | LF | 600 | $0.25 | $1.00 | $0.50 | $0.55 | $0.55 | $0.84 | $0.50 |
| 46 | Abate asbestos (other) (5009-7003) | CF | 1 | $10,000 | $6,000.00 | $4,600.00 | $1,000.00 | $5,500.00 | $10,500 | $2,500.00 |
The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.
Source
Read from TxDOT's tabulation for this contract. TxDOT Bid Tabulations open-data export (data.texas.gov) from September 2024, read 21 November 2026, and TxDOT's legacy Tabulation of Bids pages for January 2020 to August 2024. The legacy pages are a large sample, not every contract: their file names were reused from year to year. Their district is the one TxDOT gives the county. Bids that did not match their published total are left out.
Every contract let that day: TxDOT letting of July 1, 2026. Compiled by Mirage Metrics.
Your own bid history, read the same way
Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.