TxDOT contract A00220166 bid tabulation
BRIDGE PREVENTATIVE MAINTENANCE, SH0036 (At Second Davidson Creek to At Brushy Creek). Let by Texas DOT on May 12, 2026, Burleson, Bryan District. 5 bids received; low bid $612,294 by Scott Tucker Construction Company, LLC, +11% against the engineer's estimate of $552,329.
- Owner
- Texas DOT
- Letting
- 12 MAY 2026
- Pay items
- 5
- Data through
- 19 NOV 2026
Bidders
| Rank | Bidder | Total bid | Against the low bid | Against the estimate |
|---|---|---|---|---|
| 1 | Scott Tucker Construction Company, LLC | $612,294 | Low | +11% |
| 2 | Garret Shields Infrastructure | $986,200 | +61% | +79% |
| 3 | Jackson Excavation, LLC | $1,059,540 | +73% | +92% |
| 4 | Taylor Bridge LLC | $1,100,000 | +80% | +99% |
| 5 | Blacksmith Ventures LLC | $1,109,000 | +81% | +101% |
Engineer's estimate: $552,329.
Bid tabulation
| Line | Pay item | Unit | Quantity | Estimate | 1. Scott Tucker Construction Company, LLC | 2. Garret Shields Infrastructure | 3. Jackson Excavation, LLC | 4. Taylor Bridge LLC | 5. Blacksmith Ventures LLC |
|---|---|---|---|---|---|---|---|---|---|
| 1 | Clean and paint existing STR (ref no. 1) (446-7020) | EACH | 1 | $266,127 | $288,872 | $500,000 | $556,000 | $510,000 | $540,000 |
| 2 | Clean and paint existing STR (ref no. 2) (446-7021) | EACH | 1 | $221,773 | $246,189 | $420,000 | $480,000 | $425,000 | $450,000 |
| 3 | Mobilization (500-7001) | LS | 1 | $39,634 | $61,300 | $50,000 | $10,000 | $110,000 | $100,000 |
| 4 | Barricades, signs and traffic handling (502-7001) | MO | 3 | $7,993.88 | $4,783.00 | $5,000.00 | $4,500.00 | $15,000 | $5,000.00 |
| 5 | TMA (stationary) (505-7001) | DAY | 4 | $203.39 | $396.00 | $300.00 | $10.00 | $2,500.00 | $1,000.00 |
The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.
Source
Read from TxDOT's tabulation for this contract. TxDOT Bid Tabulations open-data export (data.texas.gov) from September 2024, read 21 November 2026, and TxDOT's legacy Tabulation of Bids pages for January 2020 to August 2024. The legacy pages are a large sample, not every contract: their file names were reused from year to year. Their district is the one TxDOT gives the county. Bids that did not match their published total are left out.
Every contract let that day: TxDOT letting of May 12, 2026. Compiled by Mirage Metrics.