TxDOT contract A00216795 bid tabulation
Bridge Maintenance, Various (Various to Various). Let by Texas DOT on June 3, 2026, McLennan, Waco District. 9 bids received; low bid $3,058,058 by The Truesdell Corporation, -13% against the engineer's estimate of $3,511,971.
- Owner
- Texas DOT
- Letting
- 03 JUN 2026
- Pay items
- 48
- Data through
- 19 NOV 2026
Bidders
| Rank | Bidder | Total bid | Against the low bid | Against the estimate |
|---|---|---|---|---|
| 1 | The Truesdell Corporation | $3,058,058 | Low | -13% |
| 2 | Icos Management, LLC | $3,352,693 | +10% | -5.0% |
| 3 | Garret Shields Infrastructure | $3,667,437 | +20% | +4.0% |
| 4 | Built Right Construction of Oklahoma, LLC | $3,819,408 | +25% | +9.0% |
| 5 | Structural Integrity Group LLC | $4,393,505 | +44% | +25% |
| 6 | Blacksmith Ventures LLC | $4,719,107 | +54% | +34% |
| 7 | SCR Civil Construction, LLC | $4,857,918 | +59% | +38% |
| 8 | Ragle Construction, Inc. | $5,987,991 | +96% | +71% |
| 9 | Premier Contractors LLC | $8,224,618 | +169% | +134% |
Engineer's estimate: $3,511,971.
Bid tabulation
| Line | Pay item | Unit | Quantity | Estimate | 1. The Truesdell Corporation | 2. Icos Management, LLC | 3. Garret Shields Infrastructure | 4. Built Right Construction of Oklahoma, LLC | 5. Structural Integrity Group LLC | 6. Blacksmith Ventures LLC |
|---|---|---|---|---|---|---|---|---|---|---|
| 1 | Preparing row (100-7002) | STA | 31.50 | $2,000.00 | $1,250.00 | $1,575.00 | $1,000.00 | $500.00 | $1,000.00 | $3,000.00 |
| 2 | Removing concrete (riprap) (104-7006) | SY | 1,008 | $25.00 | $35.00 | $23.10 | $40.00 | $30.00 | $25.00 | $80.00 |
| 3 | Excavation (channel) (110-7002) | CY | 1,005 | $30.00 | $65.00 | $52.50 | $30.00 | $10.00 | $37.00 | $80.00 |
| 4 | Embankment (vehicle)(OC)(type B) (132-7015) | CY | 4,039 | $38.00 | $35.00 | $21.00 | $30.00 | $20.00 | $54.00 | $30.00 |
| 5 | Broadcast seed (permanent_rural_sand) (164-7001) | SY | 1,307 | $1.00 | $1.00 | $2.10 | $0.50 | $2.00 | $5.00 | $3.00 |
| 6 | Broadcast seed (permanent_rural_clay) (164-7002) | SY | 1,307 | $1.00 | $1.00 | $2.10 | $0.50 | $2.75 | $5.00 | $3.00 |
| 7 | Vegetative watering (168-7001) | TGL | 22 | $25.00 | $1.00 | $105.00 | $20.00 | $100.00 | $100.00 | $300.00 |
| 8 | Flexible pavement structure repair(3") (351-7002) | SY | 213 | $100.00 | $35.00 | $126.00 | $80.00 | $35.00 | $263.00 | $250.00 |
| 9 | Flexible pavement structure repair(8") (351-7007) | SY | 87 | $150.00 | $77.00 | $262.50 | $120.00 | $85.00 | $650.00 | $800.00 |
| 10 | Flowable backfill (401-7001) | CY | 124 | $350.00 | $550.00 | $315.00 | $300.00 | $400.00 | $695.00 | $400.00 |
| 11 | Temporary special shoring (cofferdam) (403-7002) | SF | 8,805 | $28.00 | $18.00 | $8.40 | $30.00 | $25.00 | $48.00 | $5.00 |
| 12 | Class C concrete (pile encasement) (420-7060) | CY | 52.80 | $555.00 | $990.00 | $3,150.00 | $1,200.00 | $600.00 | $4,395.00 | $3,500.00 |
| 13 | Penetrating concrete surface treatment (428-7001) | SY | 906 | $18.00 | $22.00 | $26.25 | $12.00 | $20.00 | $16.00 | $80.00 |
| 14 | Concrete structure repair(clean & coat WTH epoxy) (429-7001) | SF | 792 | $170.00 | $65.00 | $105.00 | $100.00 | $250.00 | $112.00 | $160.00 |
| 15 | Concrete structure repair (vertical & overhead) (429-7007) | SF | 435 | $190.00 | $143.00 | $189.00 | $200.00 | $225.00 | $213.00 | $300.00 |
| 16 | Concrete structure repair (standard) (429-7009) | SF | 50 | $170.00 | $133.00 | $210.00 | $150.00 | $225.00 | $195.00 | $400.00 |
| 17 | Pneumatically placed concrete (repair) (431-7002) | CF | 480 | $100.00 | $120.00 | $294.00 | $200.00 | $225.00 | $246.00 | $260.00 |
| 18 | Riprap (mow strip)(4 in) (432-7013) | CY | 69 | $800.00 | $650.00 | $840.00 | $600.00 | $650.00 | $650.00 | $800.00 |
| 19 | Riprap (stone protection)(12 in) (432-7041) | CY | 830 | $160.00 | $150.00 | $158.00 | $200.00 | $200.00 | $180.00 | $150.00 |
| 20 | Riprap (stone protection)(18 in) (432-7043) | CY | 2,906 | $180.00 | $150.00 | $158.00 | $200.00 | $225.00 | $180.00 | $180.00 |
| 21 | Riprap (stone protection)(24 in) (432-7045) | CY | 3,833 | $195.00 | $150.00 | $168.00 | $200.00 | $250.00 | $180.00 | $200.00 |
| 22 | Cleaning and sealing existing joints (CL3) (438-7004) | LF | 484 | $45.00 | $65.00 | $63.00 | $40.00 | $60.00 | $42.00 | $60.00 |
| 23 | STR steel (pedestal) (442-7010) | LB | 238 | $50.00 | $110.00 | $157.50 | $50.00 | $50.00 | $67.50 | $250.00 |
| 24 | Miscellaneous non-bridge (nbis) (442-7017) | LB | 168 | $10.00 | $68.00 | $157.50 | $25.00 | $50.00 | $95.00 | $120.00 |
| 25 | Clean & paint existing piling (system I) (446-7007) | LS | 1 | $15,000 | $30,000 | $63,000 | $70,000 | $57,000 | $48,000 | $100,000 |
| 26 | Gabions (galvanized) (459-7001) | CY | 410 | $300.00 | $277.00 | $336.00 | $300.00 | $400.00 | $381.00 | $380.00 |
| 27 | Wingwall (PW - 1) (HW=13 FT) (466-7183) | EACH | 2 | $18,000 | $77,000 | $26,250 | $25,000 | $90,000 | $149,000 | $80,000 |
| 28 | Raising existing struct (495-7001) | LS | 1 | $25,000 | $15,800 | $42,000 | $50,000 | $20,000 | $15,000 | $100,000 |
| 29 | Mobilization (500-7001) | LS | 1 | $313,000 | $261,938 | $150,135 | $200,000 | $75,000 | $423,000 | $400,000 |
| 30 | Barricades, signs and traffic handling (502-7001) | MO | 13 | $5,000.00 | $7,000.00 | $2.00 | $5,000.00 | $2,500.00 | $5,600.00 | $8,000.00 |
| 31 | Portable changeable message sign (503-7001) | DAY | 390 | $85.00 | $1.00 | $147.00 | $10.00 | $125.00 | $1.00 | $1.00 |
| 32 | Portable changeable message sign (503-7002) | EACH | 2 | $8,000.00 | $1.00 | $5,250.00 | $1,000.00 | $5,000.00 | $1.00 | $20,000 |
| 33 | TMA (stationary) (505-7001) | DAY | 390 | $180.00 | $1.00 | $189.00 | $300.00 | $300.00 | $1.00 | $1.00 |
| 34 | TMA (mobile operation) (505-7003) | DAY | 195 | $175.00 | $1.00 | $315.00 | $300.00 | $300.00 | $1.00 | $1.00 |
| 35 | Temporary sediment control fence (install) (506-7039) | LF | 1,000 | $4.00 | $1.00 | $2.10 | $5.00 | $5.00 | $3.00 | $5.00 |
| 36 | Temporary sediment control fence (remove) (506-7041) | LF | 1,000 | $1.00 | $1.00 | $1.10 | $1.00 | $2.00 | $1.00 | $1.00 |
| 37 | Metal W-beam guard fence (steel post) (540-7002) | LF | 687.50 | $33.00 | $40.00 | $37.80 | $40.00 | $35.00 | $32.00 | $45.00 |
| 38 | Metal beam guard fence trans (thrie-beam) (540-7005) | EACH | 4 | $2,650.00 | $2,600.00 | $3,360.00 | $2,000.00 | $2,800.00 | $2,600.00 | $3,200.00 |
| 39 | Remove metal beam guard fence (542-7001) | LF | 687.50 | $4.00 | $4.00 | $4.20 | $5.00 | $3.00 | $2.50 | $5.00 |
| 40 | RM metal beam guard fence trans (thrie-beam) (542-7004) | EACH | 2 | $400.00 | $250.00 | $525.00 | $500.00 | $200.00 | $200.00 | $500.00 |
| 41 | Guardrail end treatment (install) (544-7001) | EACH | 8 | $3,200.00 | $3,300.00 | $4,410.00 | $3,500.00 | $4,000.00 | $3,000.00 | $4,500.00 |
| 42 | Guardrail end treatment (remove) (544-7003) | EACH | 8 | $350.00 | $300.00 | $525.00 | $500.00 | $250.00 | $250.00 | $500.00 |
| 43 | Install delineator assembly (D-SW)SZ 1(BRF)CTB (BI) (658-7013) | EACH | 2 | $40.00 | $55.00 | $105.00 | $30.00 | $55.00 | $20.00 | $100.00 |
| 44 | Install delineator assembly (D-SW)SZ 1(BRF)GF2(BI) (658-7019) | EACH | 16 | $40.00 | $55.00 | $105.00 | $30.00 | $55.00 | $45.00 | $50.00 |
| 45 | Driftwood removal (735-7060) | CY | 2,840 | $65.00 | $77.00 | $63.00 | $100.00 | $45.00 | $75.00 | $110.00 |
| 46 | CNC crack repair (discrete)(inject) (780-7002) | LF | 225 | $95.00 | $45.00 | $126.00 | $50.00 | $125.00 | $89.00 | $150.00 |
| 47 | Concrete armor unit (48") (4076-7001) | EACH | 200 | $400.00 | $288.00 | $420.00 | $300.00 | $240.00 | $520.00 | $1,800.00 |
| 48 | Bent cap/abutment cap cleaning (7001-7002) | EACH | 12 | $1,000.00 | $600.00 | $4,200.00 | $500.00 | $500.00 | $1,100.00 | $1,000.00 |
The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.
Source
Read from TxDOT's tabulation for this contract. TxDOT Bid Tabulations open-data export (data.texas.gov) from September 2024, read 21 November 2026, and TxDOT's legacy Tabulation of Bids pages for January 2020 to August 2024. The legacy pages are a large sample, not every contract: their file names were reused from year to year. Their district is the one TxDOT gives the county. Bids that did not match their published total are left out.
Every contract let that day: TxDOT letting of June 3, 2026. Compiled by Mirage Metrics.
Your own bid history, read the same way
Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.