TxDOT contract A00222854 bid tabulation
BRIDGE PREVENTATIVE MAINTENANCE, BI0040D (Various Locations- See Plan Sheets to Various Locations-See Plan Sheets). Let by Texas DOT on November 12, 2026, Potter, Amarillo District. 7 bids received; low bid $734,629 by Ti-Zack Concrete, LLC, -9.5% against the engineer's estimate of $811,416.
- Owner
- Texas DOT
- Letting
- 12 NOV 2026
- Pay items
- 33
- Data through
- 19 NOV 2026
Bidders
| Rank | Bidder | Total bid | Against the low bid | Against the estimate |
|---|---|---|---|---|
| 1 | Ti-Zack Concrete, LLC | $734,629 | Low | -9.0% |
| 2 | Cross Plus Construction, LLC | $794,043 | +8.0% | -2.0% |
| 3 | Structural Integrity Group LLC | $852,064 | +16% | +5.0% |
| 4 | Pathfield Investments LLC | $863,606 | +18% | +6.0% |
| 5 | SCR Civil Construction, LLC | $916,535 | +25% | +13% |
| 6 | Icos Management, LLC | $974,652 | +33% | +20% |
| 7 | Road Doctors LLC | $981,238 | +34% | +21% |
Engineer's estimate: $811,416.
Bid tabulation
| Line | Pay item | Unit | Quantity | Estimate | 1. Ti-Zack Concrete, LLC | 2. Cross Plus Construction, LLC | 3. Structural Integrity Group LLC | 4. Pathfield Investments LLC | 5. SCR Civil Construction, LLC | 6. Icos Management, LLC |
|---|---|---|---|---|---|---|---|---|---|---|
| 1 | Embankment (final)(OC)(type B) (132-7003) | CY | 81 | $50.00 | $64.63 | $50.00 | $82.00 | $120.00 | $100.00 | $63.00 |
| 2 | Blading (150-7002) | HR | 8 | $250.00 | $587.50 | $200.00 | $125.00 | $500.00 | $100.00 | $525.00 |
| 3 | Broadcast seed (permanent_rural_sand) (164-7001) | SY | 274 | $1.00 | $7.05 | $5.00 | $6.00 | $20.00 | $6.60 | $2.10 |
| 4 | Soil ret BLKT(SL_mod_sand_short_roll) (169-7011) | SY | 274 | $3.00 | $19.98 | $10.00 | $5.75 | $37.00 | $6.33 | $21.00 |
| 5 | Flowable backfill (401-7001) | CY | 8 | $850.00 | $881.25 | $750.00 | $610.00 | $800.00 | $675.00 | $420.00 |
| 6 | Class C concrete(pile encasement) (420-7059) | LF | 249 | $300.00 | $111.63 | $400.00 | $640.00 | $790.00 | $740.00 | $787.50 |
| 7 | Epoxy waterproof finish (type X) (427-7005) | SF | 770 | $12.00 | $22.33 | $15.00 | $21.50 | $20.00 | $14.00 | $21.00 |
| 8 | Concrete structure repair (vertical & overhead) (429-7007) | SF | 317 | $225.00 | $170.38 | $300.00 | $324.00 | $280.00 | $215.00 | $126.00 |
| 9 | Riprap (concrete)(5 in) (432-7002) | CY | 88 | $900.00 | $793.13 | $750.00 | $920.00 | $950.00 | $858.00 | $630.00 |
| 10 | Riprap (stone common)(dry)(18 in) (432-7033) | CY | 27 | $350.00 | $264.38 | $300.00 | $350.00 | $280.00 | $560.00 | $189.00 |
| 11 | Cleaning existing joints (438-7008) | LF | 156 | $30.00 | $76.38 | $10.00 | $14.00 | $50.00 | $10.00 | $52.50 |
| 12 | Clean and seal existing JTS (strip seal) (438-7014) | LF | 414 | $66.00 | $88.13 | $100.00 | $90.00 | $90.00 | $82.00 | $99.75 |
| 13 | Multi-layer polymer overlay (439-7014) | SY | 3,415 | $40.00 | $65.80 | $40.00 | $39.25 | $40.00 | $53.25 | $84.00 |
| 14 | Header type expansion joint (454-7009) | CF | 22 | $525.00 | $323.13 | $1,500.00 | $490.00 | $800.00 | $1,900.00 | $630.00 |
| 15 | Shot blasting (483-7016) | SY | 3,415 | $7.00 | $8.23 | $6.00 | $3.25 | $13.00 | $7.65 | $12.50 |
| 16 | Mobilization (500-7001) | LS | 1 | $60,000 | $29,375 | $50,000 | $85,000 | $60,000 | $60,000 | $65,500 |
| 17 | Barricades, signs and traffic handling (502-7004) | EACH | 8 | $7,000.00 | $7,637.50 | $5,000.00 | $4,000.00 | $10.00 | $9,116.00 | $1.10 |
| 18 | Portable changeable message sign (503-7002) | EACH | 2 | $12,500 | $12,925 | $10,000 | $5,000.00 | $150.00 | $10,775 | $5,000.00 |
| 19 | TMA (stationary) (505-7001) | DAY | 155 | $200.00 | $129.25 | $200.00 | $1.00 | $1.00 | $50.00 | $210.00 |
| 20 | TMA (mobile operation) (505-7002) | HR | 30 | $125.00 | $58.75 | $100.00 | $195.00 | $1.00 | $30.00 | $189.00 |
| 21 | Concrete curb (type II) (529-7002) | LF | 540 | $40.00 | $17.63 | $25.00 | $42.00 | $90.00 | $25.30 | $42.00 |
| 22 | Downstream anchor terminal section (540-7015) | EACH | 1 | $1,700.00 | $5,287.50 | $2,500.00 | $2,000.00 | $1,500.00 | $2,200.00 | $2,100.00 |
| 23 | Remove downstream anchor terminal (542-7003) | EACH | 1 | $500.00 | $1,762.50 | $500.00 | $175.00 | $1,000.00 | $192.50 | $525.00 |
| 24 | Guardrail end treatment (install) (544-7001) | EACH | 3 | $3,900.00 | $4,935.00 | $4,500.00 | $4,500.00 | $3,200.00 | $4,950.00 | $3,990.00 |
| 25 | Guardrail end treatment (remove) (544-7003) | EACH | 3 | $600.00 | $1,762.50 | $500.00 | $200.00 | $295.00 | $220.00 | $420.00 |
| 26 | Work zone pavement marking SHT terminal (tab)type W (662-7112) | EACH | 125 | $2.00 | $5.64 | $1.00 | $2.50 | $5.00 | $5.00 | $2.10 |
| 27 | Work zone pavement marking SHT terminal (tab)type Y-2 (662-7114) | EACH | 68 | $2.00 | $5.76 | $1.00 | $2.50 | $4.50 | $5.00 | $2.10 |
| 28 | Reflectorized pavement marking type I (W)6"(broken)(100MIL) (666-7408) | LF | 180 | $1.00 | $11.75 | $10.00 | $10.00 | $6.00 | $11.00 | $12.60 |
| 29 | Reflectorized pavement marking type I (W)6"(solid)(100MIL) (666-7411) | LF | 652 | $1.00 | $11.75 | $10.00 | $10.00 | $4.00 | $11.00 | $12.60 |
| 30 | Reflectorized pavement marking type I (Y)6"(solid)(100MIL) (666-7423) | LF | 652 | $2.00 | $11.75 | $10.00 | $10.00 | $2.00 | $11.00 | $12.60 |
| 31 | Tree removal (4" - 12" diameter) (752-7005) | EACH | 15 | $600.00 | $411.25 | $100.00 | $575.00 | $80.00 | $300.00 | $1,260.00 |
| 32 | Carbon fiber reinforced polymer protection (786-7001) | SF | 120 | $200.00 | $135.13 | $150.00 | $85.00 | $250.00 | $85.00 | $210.00 |
| 33 | Tied-concrete block erosion control mat (2005-7001) | SF | 2,194 | $46.00 | $4.70 | $25.00 | $30.00 | $15.00 | $15.00 | $15.75 |
The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.
Source
Read from TxDOT's tabulation for this contract. TxDOT Bid Tabulations open-data export (data.texas.gov) from September 2024, read 21 November 2026, and TxDOT's legacy Tabulation of Bids pages for January 2020 to August 2024. The legacy pages are a large sample, not every contract: their file names were reused from year to year. Their district is the one TxDOT gives the county. Bids that did not match their published total are left out.
Every contract let that day: TxDOT letting of November 12, 2026. Compiled by Mirage Metrics.
Your own bid history, read the same way
Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.