TxDOT contract A00121832 bid tabulation
Bridge Replacement, BI 27U (FM 3466 to W 3RD STREET). Let by Texas DOT on April 4, 2025, Hale, Lubbock District. 6 bids received; low bid $6,813,363 by Coppell Construction Co., Inc., -10% against the engineer's estimate of $7,580,981.
- Owner
- Texas DOT
- Letting
- 04 APR 2025
- Pay items
- 102
- Data through
- 19 NOV 2026
Bidders
| Rank | Bidder | Total bid | Against the low bid | Against the estimate |
|---|---|---|---|---|
| 1 | Coppell Construction Co., Inc. | $6,813,363 | Low | -10% |
| 2 | L A Fuller & Sons Construction, LTD. | $7,678,802 | +13% | +1.0% |
| 3 | Gilvin-Terrill, LTD. | $8,299,990 | +22% | +9.0% |
| 4 | McMillen, Inc. | $9,863,292 | +45% | +30% |
| 5 | Earth Builders, L.P. | $10,691,887 | +57% | +41% |
| 6 | A. L. Helmcamp, Inc. | $11,462,193 | +68% | +51% |
Engineer's estimate: $7,580,981.
Bid tabulation
| Line | Pay item | Unit | Quantity | Estimate | 1. Coppell Construction Co., Inc. | 2. L A Fuller & Sons Construction, LTD. | 3. Gilvin-Terrill, LTD. | 4. McMillen, Inc. | 5. Earth Builders, L.P. | 6. A. L. Helmcamp, Inc. |
|---|---|---|---|---|---|---|---|---|---|---|
| 1 | Preparation row (tree remove) (12"-24" diameter) (100-7004) | EACH | 1 | $2,500.00 | $2,500.00 | $1,284.00 | $3,000.00 | $3,000.00 | $2,200.00 | $2,500.00 |
| 2 | Preparation row (tree remove) (24"-36" diameter) (100-7005) | EACH | 2 | $3,000.00 | $2,600.00 | $1,398.05 | $4,000.00 | $3,000.00 | $3,500.00 | $3,100.00 |
| 3 | Removing concrete (riprap) (104-7006) | SY | 270 | $20.00 | $25.00 | $40.00 | $20.00 | $100.00 | $100.00 | $85.00 |
| 4 | Removing concrete (curb & gutter) (104-7017) | LF | 230 | $25.00 | $15.00 | $26.05 | $20.00 | $40.00 | $35.00 | $35.00 |
| 5 | Remove (0"-4") TRT/untrt base & asphalt pavement (105-7001) | SY | 4,097 | $10.00 | $4.75 | $4.05 | $25.00 | $6.00 | $9.00 | $10.00 |
| 6 | Excavation (roadway) (110-7001) | CY | 681 | $50.00 | $35.00 | $34.80 | $80.00 | $42.00 | $35.00 | $30.00 |
| 7 | Embankment (final)(OC)(type C) (132-7005) | CY | 144 | $50.00 | $55.00 | $94.70 | $80.00 | $50.00 | $40.00 | $88.00 |
| 8 | Drill seed (permanent_urban_clay) (164-7012) | SY | 10,240 | $1.00 | $0.60 | $1.00 | $0.75 | $1.00 | $0.35 | $0.65 |
| 9 | Drill seed (temporary_warm_cool) (164-7015) | SY | 10,240 | $1.00 | $0.60 | $0.75 | $0.75 | $1.00 | $0.35 | $0.65 |
| 10 | Vegetative watering (168-7001) | TGL | 689 | $200.00 | $30.00 | $99.55 | $35.00 | $50.00 | $30.00 | $35.00 |
| 11 | Proof rolling (216-7001) | HR | 20 | $200.00 | $140.00 | $232.15 | $200.00 | $375.00 | $150.00 | $220.00 |
| 12 | FL BS (compacted in place) (type A GR 4) (4"-21") (247-7342) | SY | 3,774 | $50.00 | $98.00 | $43.65 | $75.00 | $74.00 | $130.00 | $38.00 |
| 13 | Prime coat (MC-30) (310-7004) | GAL | 755 | $10.00 | $25.00 | $9.20 | $12.00 | $15.00 | $20.00 | $11.00 |
| 14 | Emuls asphalt (erosion control)(CSS-1H) (314-7011) | GAL | 2,662 | $5.00 | $25.00 | $5.40 | $10.00 | $4.00 | $18.00 | $4.50 |
| 15 | Fog seal (CSS-1H) (315-7004) | GAL | 23,962 | $5.00 | $15.00 | $4.85 | $4.00 | $14.00 | $10.00 | $3.50 |
| 16 | Aggregate (type-B, GR-5)(sac-B) (316-7175) | CY | 285 | $250.00 | $130.00 | $364.10 | $150.00 | $462.00 | $850.00 | $450.00 |
| 17 | D-GR HMA type-C sac-B PG70-28 (341-7028) | TON | 867 | $300.00 | $250.00 | $277.50 | $250.00 | $300.00 | $320.00 | $290.00 |
| 18 | Tack coat (341-7082) | GAL | 529 | $10.00 | $25.00 | $10.30 | $10.00 | $15.00 | $25.00 | $8.00 |
| 19 | SP mixes SP-D sac-A PG70-28 (344-7057) | TON | 435 | $400.00 | $460.00 | $291.45 | $300.00 | $300.00 | $350.00 | $360.00 |
| 20 | Tack coat (344-7077) | GAL | 529 | $10.00 | $25.00 | $10.30 | $10.00 | $15.00 | $25.00 | $8.00 |
| 21 | Flexible pavement structure repair(3") (351-7002) | SY | 500 | $80.00 | $250.00 | $174.60 | $90.00 | $110.00 | $150.00 | $152.00 |
| 22 | Planing asphalt concrete pavement(6") (354-7055) | SY | 4,097 | $12.00 | $4.75 | $7.50 | $20.00 | $12.00 | $15.00 | $8.50 |
| 23 | Cem stabil BKFL (400-7010) | CY | 288 | $300.00 | $400.00 | $279.20 | $800.02 | $350.00 | $500.00 | $400.00 |
| 24 | Temporary special shoring (cofferdam) (403-7002) | SF | 5,760 | $30.00 | $35.00 | $12.95 | $50.00 | $90.00 | $10.00 | $12.00 |
| 25 | Drilled shaft (36 in) (416-7006) | LF | 952 | $450.00 | $400.00 | $484.30 | $410.00 | $365.00 | $500.00 | $560.00 |
| 26 | Class C concrete (abutment) (420-7012) | CY | 99.60 | $2,300.00 | $1,400.00 | $2,343.00 | $2,000.00 | $2,300.00 | $3,000.00 | $3,000.00 |
| 27 | Class C concrete (cap) (420-7022) | CY | 81.20 | $2,600.00 | $1,400.00 | $1,893.50 | $2,000.00 | $2,800.00 | $4,000.00 | $3,400.00 |
| 28 | Class C concrete (column) (420-7038) | CY | 23.60 | $2,600.00 | $2,000.00 | $3,105.00 | $2,000.00 | $5,000.00 | $4,000.00 | $3,400.00 |
| 29 | Reinforced concrete slab (422-7001) | SF | 13,200 | $45.00 | $39.00 | $57.90 | $40.09 | $55.00 | $60.00 | $60.00 |
| 30 | Approach slab (422-7013) | CY | 172.80 | $1,400.00 | $1,200.00 | $1,042.80 | $2,000.00 | $1,200.00 | $2,500.00 | $1,100.00 |
| 31 | Prestressed concrete girder (TX28) (425-7001) | LF | 1,484.80 | $300.00 | $282.00 | $295.35 | $350.00 | $425.00 | $450.00 | $320.00 |
| 32 | Epoxy waterproof finish (type X) (427-7005) | SF | 2,936.50 | $20.00 | $10.00 | $10.85 | $15.00 | $15.00 | $25.00 | $15.00 |
| 33 | Riprap (concrete)(CL B) (432-7005) | CY | 378 | $700.00 | $500.00 | $667.15 | $1,000.00 | $975.00 | $1,000.00 | $920.00 |
| 34 | Riprap (mow strip)(5 in) (432-7014) | CY | 60 | $750.00 | $700.00 | $559.35 | $1,000.00 | $1,200.00 | $750.00 | $920.00 |
| 35 | STR steel (miscellaneous non-bridge) (442-7007) | LB | 112 | $50.00 | $35.00 | $33.55 | $20.00 | $31.00 | $25.00 | $25.00 |
| 36 | Rail (type T223) (450-7008) | LF | 680 | $250.00 | $225.00 | $274.20 | $175.00 | $340.00 | $325.00 | $270.00 |
| 37 | Armor joint (sealed) (454-7003) | LF | 168 | $320.00 | $200.00 | $215.80 | $150.00 | $196.00 | $200.00 | $200.00 |
| 38 | RC pipe (CL III)(30 in) (464-7007) | LF | 120 | $360.00 | $425.00 | $260.25 | $200.00 | $225.00 | $200.00 | $200.00 |
| 39 | Set (type II) (30 in) (RCP) (6: 1) (P) (467-7348) | EACH | 3 | $6,000.00 | $4,500.00 | $8,142.55 | $10,000 | $4,200.00 | $4,000.00 | $8,000.00 |
| 40 | Removing structure (set) (496-7004) | EACH | 3 | $1,500.00 | $2,500.00 | $2,053.10 | $2,000.00 | $1,600.00 | $1,000.00 | $2,000.00 |
| 41 | Removing structure (bridge 100 - 499 FT length) (496-7010) | EACH | 2 | $400,000 | $350,000 | $589,372 | $467,000 | $1,075,000 | $1,000,000 | $1,950,000 |
| 42 | Mobilization (500-7001) | LS | 1 | $689,000 | $600,000 | $762,627 | $800,000 | $950,000 | $1,100,000 | $1,100,000 |
| 43 | Barricades, signs and traffic handling (502-7001) | MO | 18 | $30,000 | $15,000 | $12,800 | $42,550 | $12,000 | $4,000.00 | $42,000 |
| 44 | Portable changeable message sign (503-7001) | DAY | 960 | $150.00 | $100.00 | $84.85 | $80.00 | $60.00 | $120.00 | $75.00 |
| 45 | TMA (stationary) (505-7001) | DAY | 482 | $250.00 | $275.00 | $500.85 | $450.00 | $250.00 | $300.00 | $100.00 |
| 46 | TMA (mobile operation) (505-7003) | DAY | 15 | $1,000.00 | $500.00 | $961.20 | $450.00 | $1,000.00 | $500.00 | $100.00 |
| 47 | Rock filter dams (install) (type 3) (506-7003) | LF | 270 | $90.00 | $150.00 | $138.90 | $175.00 | $70.00 | $100.00 | $160.00 |
| 48 | Rock filter dams (remove) (506-7011) | LF | 135 | $30.00 | $35.00 | $84.90 | $50.00 | $50.00 | $20.00 | $30.00 |
| 49 | Construction exits (install) (type 1) (506-7020) | SY | 900 | $50.00 | $45.00 | $57.95 | $50.00 | $25.00 | $75.00 | $30.00 |
| 50 | Construction exits (remove) (506-7024) | SY | 450 | $20.00 | $25.00 | $45.90 | $30.00 | $25.00 | $10.00 | $10.00 |
| 51 | Temporary sediment control fence (install) (506-7039) | LF | 750 | $8.00 | $6.50 | $3.55 | $6.50 | $5.00 | $7.00 | $7.00 |
| 52 | Temporary sediment control fence (remove) (506-7041) | LF | 375 | $4.00 | $3.00 | $1.35 | $3.00 | $2.00 | $2.00 | $3.00 |
| 53 | Biodegradable erosion control logs (install) (18") (506-7045) | LF | 1,995 | $10.00 | $10.00 | $12.10 | $10.00 | $8.00 | $12.00 | $10.00 |
| 54 | Biodegradable erosion control logs (remove) (506-7046) | LF | 998 | $5.00 | $3.00 | $0.65 | $3.00 | $3.00 | $2.00 | $3.00 |
| 55 | Constructing detours (type 1) (508-7003) | SY | 563 | $150.00 | $150.00 | $129.40 | $85.00 | $300.00 | $200.00 | $142.00 |
| 56 | Constructing detours (type 2) (508-7004) | SY | 59 | $500.00 | $200.00 | $377.65 | $410.00 | $800.00 | $700.00 | $1,000.00 |
| 57 | Concrete curb & gutter (type II) (529-7009) | LF | 175 | $100.00 | $50.00 | $49.34 | $50.00 | $60.00 | $40.00 | $100.00 |
| 58 | Metal W-beam guard fence (steel post) (540-7002) | LF | 1,300 | $50.00 | $29.00 | $31.90 | $35.00 | $34.65 | $42.00 | $32.00 |
| 59 | Downstream anchor terminal section (540-7015) | EACH | 4 | $2,000.00 | $1,450.00 | $1,705.00 | $1,550.00 | $1,325.00 | $2,000.00 | $1,800.00 |
| 60 | Metal beam guard fence trans (non - sym) (540-7016) | EACH | 2 | $1,300.00 | $1,025.00 | $1,210.00 | $1,100.00 | $1,350.00 | $1,600.00 | $1,300.00 |
| 61 | Metal thrie-beam guard fence (steel post) (540-7020) | EACH | 6 | $3,000.00 | $2,100.00 | $2,447.50 | $2,300.00 | $2,625.00 | $3,200.00 | $2,500.00 |
| 62 | Remove metal beam guard fence (542-7001) | LF | 875 | $5.00 | $3.00 | $5.50 | $5.00 | $2.00 | $5.00 | $6.00 |
| 63 | Remove terminal anchor section (542-7002) | EACH | 4 | $500.00 | $150.00 | $440.00 | $400.00 | $215.00 | $350.00 | $450.00 |
| 64 | Guardrail end treatment (install) (544-7001) | EACH | 9 | $4,000.00 | $3,275.00 | $3,630.00 | $3,300.00 | $4,225.00 | $4,000.00 | $3,700.00 |
| 65 | Guardrail end treatment (remove) (544-7003) | EACH | 8 | $500.00 | $200.00 | $440.00 | $400.00 | $320.00 | $300.00 | $450.00 |
| 66 | In RD IL (U/P) (type 1) (250W EQ) LED (610-7015) | EACH | 2 | $3,000.00 | $2,500.00 | $3,245.00 | $2,500.00 | $4,000.00 | $4,000.00 | $3,300.00 |
| 67 | Conduit (HDPE) (2") bore (618-7010) | LF | 192 | $40.00 | $71.00 | $32.45 | $100.00 | $55.00 | $90.00 | $33.00 |
| 68 | Conduit (RM) (2") (618-7078) | LF | 314 | $100.00 | $58.00 | $67.32 | $30.00 | $60.00 | $80.00 | $70.00 |
| 69 | Electrical conductor (no.6) bare (620-7009) | LF | 526 | $8.00 | $8.00 | $4.07 | $2.50 | $35.00 | $8.00 | $4.10 |
| 70 | Electrical conductor (no.6) insulated (620-7010) | LF | 1,052 | $8.50 | $9.00 | $4.40 | $3.00 | $15.00 | $9.00 | $4.50 |
| 71 | Ground box type A (122311)W/apron (624-7002) | EACH | 3 | $2,000.00 | $2,500.00 | $2,695.00 | $1,800.00 | $1,500.00 | $2,300.00 | $2,700.00 |
| 72 | Remove electrical services (628-7002) | EACH | 1 | $2,000.00 | $2,400.00 | $1,100.00 | $500.00 | $7,500.00 | $2,200.00 | $1,200.00 |
| 73 | Elc SRV type A 120/240 060(NS)SS(E)SP(O) (628-7009) | EACH | 1 | $10,000 | $9,000.00 | $10,313 | $10,000 | $20,000 | $10,000 | $11,000 |
| 74 | Install delineator assembly (D-SW)SZ 1(BRF)CTB (BR) (658-7014) | EACH | 4 | $60.00 | $45.00 | $50.60 | $46.00 | $45.00 | $55.00 | $55.00 |
| 75 | Install delineator assembly (D-SW)SZ 1(BRF)GF2(BR) (658-7020) | EACH | 6 | $100.00 | $45.00 | $46.20 | $42.00 | $45.00 | $55.00 | $50.00 |
| 76 | Install delineator assembly (D-SY)SZ 1(BRF)CTB (BR) (658-7033) | EACH | 4 | $60.00 | $45.00 | $50.60 | $46.00 | $45.00 | $55.00 | $55.00 |
| 77 | Install delineator assembly (D-SY)SZ 1(BRF)GF2(BR) (658-7038) | EACH | 5 | $100.00 | $45.00 | $46.20 | $42.00 | $44.00 | $55.00 | $50.00 |
| 78 | Remove delin & object marker assms (658-7078) | EACH | 8 | $30.00 | $15.00 | $24.15 | $10.00 | $18.00 | $25.00 | $40.00 |
| 79 | Work zone pavement marking removing (traffic BTN) type W (662-7058) | LF | 17,520 | $2.00 | $1.20 | $1.32 | $1.20 | $1.50 | $1.80 | $1.50 |
| 80 | Work zone pavement marking removing (traffic BTN) type Y (662-7060) | LF | 28,365 | $2.00 | $1.20 | $1.32 | $1.20 | $1.50 | $1.80 | $1.50 |
| 81 | Work zone pavement marking removing (W)24"(solid) (662-7077) | LF | 1,037 | $20.00 | $21.00 | $23.10 | $21.00 | $21.00 | $25.00 | $23.00 |
| 82 | Work zone pavement marking SHT terminal (tab)type W (662-7112) | EACH | 678 | $2.00 | $1.50 | $11.05 | $21.50 | $2.60 | $0.80 | $1.20 |
| 83 | Work zone pavement marking SHT terminal (tab)type Y-2 (662-7114) | EACH | 240 | $2.00 | $1.50 | $11.05 | $1.50 | $2.20 | $0.80 | $1.20 |
| 84 | Reflectorized pavement marking type I (W)8"(solid)(100MIL) (666-7024) | LF | 850 | $2.00 | $2.00 | $2.20 | $2.00 | $2.00 | $2.40 | $2.30 |
| 85 | Type I high perf PM (W)6"(broken)(100MIL) (666-7290) | LF | 1,555 | $1.50 | $1.50 | $1.65 | $1.50 | $1.50 | $2.00 | $1.70 |
| 86 | Type I high perf PM (W)6"(solid)(100MIL) (666-7293) | LF | 4,020 | $1.50 | $1.50 | $1.65 | $1.50 | $1.50 | $2.00 | $1.70 |
| 87 | Type I high perf PM (Y)6"(broken)(100MIL) (666-7302) | LF | 330 | $1.50 | $1.50 | $1.65 | $1.50 | $1.50 | $2.00 | $1.70 |
| 88 | Type I high perf PM (Y)6"(solid)(100MIL) (666-7305) | LF | 5,080 | $1.50 | $1.50 | $1.65 | $1.50 | $1.50 | $2.00 | $1.70 |
| 89 | Prefabricated PM type B (W)(6")(broken) (668-7008) | LF | 100 | $15.00 | $10.00 | $11.00 | $10.00 | $10.00 | $12.00 | $11.00 |
| 90 | Prefabricated PM type B (W)(6")(solid) (668-7009) | LF | 400 | $15.00 | $10.00 | $11.00 | $10.00 | $10.00 | $12.00 | $11.00 |
| 91 | Prefabricated PM type B (Y)(6")(solid) (668-7051) | LF | 400 | $15.00 | $10.00 | $11.00 | $10.00 | $10.00 | $12.00 | $11.00 |
| 92 | Prefabricated PM type C (W)(24")(solid) (668-7089) | LF | 40 | $30.00 | $20.00 | $22.00 | $20.00 | $20.00 | $25.00 | $22.00 |
| 93 | Prefabricated PM type C (W)(arrow) (668-7091) | EACH | 14 | $300.00 | $250.00 | $275.00 | $250.00 | $250.00 | $300.00 | $275.00 |
| 94 | Reflectorized pavement marker type II-C-R (672-7006) | EACH | 241 | $5.00 | $5.50 | $6.05 | $5.50 | $6.00 | $7.00 | $6.50 |
| 95 | Eliminating existing PM & markers (6") (677-7002) | LF | 46,934 | $0.80 | $0.75 | $0.83 | $0.75 | $1.00 | $1.00 | $0.90 |
| 96 | Eliminating existing PM & markers (24") (677-7008) | LF | 691 | $10.00 | $5.00 | $5.50 | $5.00 | $5.00 | $7.00 | $6.00 |
| 97 | Pavement surface preparation for marking (6") (678-7002) | LF | 900 | $2.00 | $4.00 | $4.40 | $4.00 | $4.00 | $5.00 | $4.20 |
| 98 | Temporary traffic signals (681-7001) | EACH | 2 | $35,000 | $65,000 | $59,511 | $43,100 | $50,000 | $50,000 | $15,000 |
| 99 | Full - width mowing (730-7019) | CYC | 4 | $6,000.00 | $1,500.00 | $1,073.35 | $1,013.75 | $8,000.00 | $3,500.00 | $3,200.00 |
| 100 | Litter removal (734-7002) | CYC | 4 | $3,000.00 | $250.00 | $670.85 | $1,538.00 | $5,000.00 | $3,500.00 | $2,800.00 |
| 101 | Anti-graffiti coatng (permnent-type III) (740-7006) | SF | 23,602 | $3.00 | $2.00 | $2.04 | $2.00 | $2.00 | $2.50 | $2.20 |
| 102 | Temporary construction access (4006-7001) | LS | 1 | $100,000 | $70,000 | $261,606 | $230,000 | $100,000 | $500,000 | $250,000 |
The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.
Source
Read from TxDOT's tabulation for this contract. TxDOT Bid Tabulations open-data export (data.texas.gov) from September 2024, read 21 November 2026, and TxDOT's legacy Tabulation of Bids pages for January 2020 to August 2024. The legacy pages are a large sample, not every contract: their file names were reused from year to year. Their district is the one TxDOT gives the county. Bids that did not match their published total are left out.
Every contract let that day: TxDOT letting of April 4, 2025. Compiled by Mirage Metrics.
Your own bid history, read the same way
Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.