TxDOT contract A00045158 bid tabulation
Rehabilitate Existing Roadway, FM 547 (US 380 to FM 6). Let by Texas DOT on May 2, 2025, Collin, Dallas District. 8 bids received; low bid $16,422,403 by A. K. Gillis & Sons, LLC, -28% against the engineer's estimate of $22,962,770.
- Owner
- Texas DOT
- Letting
- 02 MAY 2025
- Pay items
- 95
- Data through
- 19 NOV 2026
Bidders
| Rank | Bidder | Total bid | Against the low bid | Against the estimate |
|---|---|---|---|---|
| 1 | A. K. Gillis & Sons, LLC | $16,422,403 | Low | -28% |
| 2 | D. L. Lennon Incorporated - Contractor | $16,649,077 | +1.0% | -27% |
| 3 | Austin Bridge & Road Services, LP | $19,180,388 | +17% | -16% |
| 4 | Foutsco Paving Company, LLC | $19,476,996 | +19% | -15% |
| 5 | Highway 19 Construction LLC | $20,210,714 | +23% | -12% |
| 6 | Ed Bell Construction Company | $21,496,922 | +31% | -6.0% |
| 7 | Grey Sky Construction LLC | $22,577,319 | +37% | -2.0% |
| 8 | Harper Brothers Construction LLC | $24,363,227 | +48% | +6.0% |
Engineer's estimate: $22,962,770.
Bid tabulation
| Line | Pay item | Unit | Quantity | Estimate | 1. A. K. Gillis & Sons, LLC | 2. D. L. Lennon Incorporated - Contractor | 3. Austin Bridge & Road Services, LP | 4. Foutsco Paving Company, LLC | 5. Highway 19 Construction LLC | 6. Ed Bell Construction Company |
|---|---|---|---|---|---|---|---|---|---|---|
| 1 | Preparing row (100-7002) | STA | 409.07 | $2,671.25 | $350.00 | $350.00 | $4,688.77 | $500.00 | $280.00 | $5,250.00 |
| 2 | Removing concrete (driveways) (104-7011) | SY | 1,794 | $30.00 | $12.00 | $18.50 | $20.00 | $11.00 | $25.00 | $25.00 |
| 3 | Remove (6") TRT/untrt base & asphalt pavement (105-7026) | SY | 2,412 | $60.00 | $9.24 | $15.00 | $5.25 | $20.00 | $6.00 | $10.50 |
| 4 | Excavation (roadway) (110-7001) | CY | 24,434 | $25.00 | $22.00 | $16.00 | $11.07 | $9.00 | $15.00 | $1.00 |
| 5 | Embankment (final)(DC)(type C) (132-7006) | CY | 26,715 | $30.00 | $22.00 | $19.00 | $21.17 | $14.00 | $30.00 | $27.50 |
| 6 | Backfill (type A or B) (134-7004) | STA | 409.07 | $450.00 | $275.00 | $365.00 | $123.30 | $200.00 | $350.00 | $630.00 |
| 7 | Blading (150-7001) | STA | 409.07 | $30.00 | $250.00 | $315.00 | $875.67 | $150.00 | $250.00 | $1,050.00 |
| 8 | Drill seed (permanent_rural_clay) (164-7010) | SY | 222,501 | $0.30 | $0.18 | $0.18 | $0.29 | $0.18 | $0.36 | $0.25 |
| 9 | Drill seed (temporary_warm_cool) (164-7015) | SY | 222,501 | $0.66 | $0.16 | $0.16 | $0.21 | $0.10 | $0.35 | $0.15 |
| 10 | Vegetative watering (168-7001) | TGL | 66,199 | $10.00 | $0.01 | $0.01 | $0.13 | $0.01 | $1.00 | $1.00 |
| 11 | FL BS (compacted in place)(type D GR 1-2) (10") (247-7102) | SY | 140,712 | $36.52 | $25.29 | $25.00 | $21.06 | $33.30 | $35.00 | $27.50 |
| 12 | FL BS (roadway del) (type D GR 1-2) (247-7209) | TON | 35,182 | $59.00 | $49.77 | $50.00 | $37.27 | $7.00 | $60.00 | $37.50 |
| 13 | Rework BS metal (type C)(12")(ord comp) (251-7055) | SY | 107,225 | $5.40 | $2.90 | $2.30 | $4.41 | $7.00 | $2.50 | $5.25 |
| 14 | Cement (275-7001) | TON | 738 | $250.00 | $220.00 | $240.00 | $220.04 | $250.00 | $215.00 | $280.00 |
| 15 | Cement TRT (existing material & new base)(6") (275-7006) | SY | 145,302 | $2.50 | $2.85 | $2.16 | $2.42 | $6.50 | $2.50 | $2.00 |
| 16 | Prime coat(MC-30 or AE-P) (310-7013) | GAL | 28,145 | $7.30 | $6.17 | $5.00 | $4.66 | $1.00 | $6.85 | $6.35 |
| 17 | Asphalt (CRS-2P) (316-7012) | GAL | 35,182 | $4.00 | $5.26 | $5.00 | $4.41 | $3.00 | $4.31 | $6.24 |
| 18 | Asphalt (AC-15P, AC-20-5TR or AC-20XP) (316-7071) | GAL | 29,552 | $8.20 | $5.46 | $5.00 | $5.04 | $3.00 | $4.94 | $6.50 |
| 19 | Aggregate (type-B or L, GR-3)(sac-B) (316-7244) | CY | 1,352 | $250.00 | $172.84 | $144.00 | $258.00 | $400.00 | $248.00 | $323.78 |
| 20 | SP mixes SP-C sac-B PG64-22 (344-7011) | TON | 24,844 | $130.00 | $128.40 | $143.40 | $109.10 | $164.00 | $148.00 | $134.69 |
| 21 | Plane & text asphalt concrete pavement(0" to 6") (354-7005) | SY | 107,225 | $5.00 | $5.57 | $7.62 | $5.25 | $5.60 | $5.00 | $6.30 |
| 22 | Cut & restoring pavement (400-7006) | SY | 265 | $266.25 | $75.00 | $20.00 | $183.70 | $20.00 | $250.00 | $315.00 |
| 23 | Trench excavation protection (402-7001) | LF | 172 | $50.00 | $15.00 | $5.00 | $10.83 | $5.00 | $10.00 | $30.00 |
| 24 | Temporary special shoring (403-7001) | SF | 2,404 | $50.00 | $5.00 | $75.00 | $91.00 | $60.00 | $55.00 | $90.00 |
| 25 | Riprap (stone protection)(12 in) (432-7041) | CY | 599 | $250.00 | $290.62 | $250.00 | $215.44 | $250.00 | $180.00 | $426.00 |
| 26 | Concrete box culvert (6 FT X 5 FT)(extend) (462-7068) | LF | 58 | $1,100.00 | $1,200.00 | $1,100.00 | $803.52 | $1,100.00 | $650.00 | $1,144.00 |
| 27 | Concrete box culvert (9 FT X 5 FT)(extend) (462-7082) | LF | 28 | $1,162.50 | $1,500.00 | $1,250.00 | $1,004.39 | $1,250.00 | $900.00 | $1,300.00 |
| 28 | RC pipe (CL III)(24 in) (464-7005) | LF | 5,990 | $115.00 | $80.00 | $68.50 | $70.31 | $69.00 | $83.00 | $71.24 |
| 29 | RC pipe (CL III)(30 in) (464-7007) | LF | 45 | $220.00 | $115.00 | $112.00 | $90.40 | $112.00 | $139.00 | $116.48 |
| 30 | RC pipe (CL III)(36 in) (464-7009) | LF | 65 | $265.00 | $160.00 | $150.00 | $150.66 | $150.00 | $201.00 | $156.00 |
| 31 | RC pipe (CL III)(48 in) (464-7011) | LF | 67 | $400.00 | $275.00 | $250.00 | $251.10 | $250.00 | $300.00 | $260.00 |
| 32 | RC pipe (CL V)(24 in) (464-7034) | LF | 121 | $200.00 | $105.00 | $90.00 | $90.40 | $90.00 | $185.00 | $93.60 |
| 33 | RC pipe (CL V)(36 in) (464-7037) | LF | 98 | $250.00 | $200.00 | $190.00 | $170.75 | $190.00 | $331.00 | $197.60 |
| 34 | Headwall (CH - FW - 0) (diameter= 24 in) (466-7005) | EACH | 1 | $17,500 | $6,000.00 | $5,800.00 | $7,030.76 | $5,800.00 | $4,500.00 | $6,500.00 |
| 35 | Headwall (CH - PW - 0) (diameter= 24 in) (466-7101) | EACH | 7 | $9,000.00 | $6,500.00 | $6,300.00 | $6,603.89 | $6,300.00 | $450.00 | $7,500.00 |
| 36 | Headwall (CH - PW - 0) (diameter= 30 in) (466-7103) | EACH | 1 | $11,000 | $8,000.00 | $7,850.00 | $9,541.74 | $7,850.00 | $600.00 | $9,000.00 |
| 37 | Headwall (CH - PW - 0) (diameter= 36 in) (466-7105) | EACH | 4 | $14,000 | $10,000 | $9,500.00 | $11,802 | $9,500.00 | $7,500.00 | $11,500 |
| 38 | Headwall (CH - PW - 0) (diameter= 48 in) (466-7107) | EACH | 1 | $16,000 | $15,000 | $11,000 | $13,810 | $11,000 | $10,500 | $14,000 |
| 39 | Wingwall (PW - 1) (HW=6 FT) (466-7176) | EACH | 4 | $15,000 | $22,000 | $28,500 | $17,577 | $28,500 | $18,000 | $30,000 |
| 40 | Set (type II) (24 in) (RCP) (3: 1) (C) (467-7325) | EACH | 5 | $1,700.00 | $1,200.00 | $1,000.00 | $1,155.05 | $1,000.00 | $1,100.00 | $1,500.00 |
| 41 | Set (type II) (24 in) (RCP) (4: 1) (C) (467-7326) | EACH | 8 | $2,000.00 | $1,275.00 | $1,100.00 | $1,205.27 | $1,100.00 | $1,300.00 | $1,575.00 |
| 42 | Set (type II) (24 in) (RCP) (6: 1) (P) (467-7328) | EACH | 332 | $1,200.00 | $1,300.00 | $1,100.00 | $1,381.04 | $1,100.00 | $1,800.00 | $1,000.00 |
| 43 | Set (type II) (30 in) (RCP) (3: 1) (C) (467-7345) | EACH | 1 | $4,200.00 | $1,700.00 | $2,000.00 | $1,506.59 | $2,000.00 | $3,100.00 | $3,000.00 |
| 44 | Set (type II) (48 in) (RCP) (4: 1) (C) (467-7390) | EACH | 2 | $6,500.00 | $9,000.00 | $8,500.00 | $7,784.06 | $8,500.00 | $10,500 | $10,000 |
| 45 | Clean existing culverts (480-7001) | EACH | 11 | $4,000.00 | $1,200.00 | $1,000.00 | $2,510.99 | $1,000.00 | $2,500.00 | $4,000.00 |
| 46 | Removing structure (set) (496-7004) | EACH | 101 | $250.00 | $125.00 | $148.00 | $175.77 | $148.00 | $500.00 | $350.00 |
| 47 | Removing structure (wingwall) (496-7005) | EACH | 16 | $3,150.00 | $1,000.00 | $900.00 | $1,004.39 | $900.00 | $1,000.00 | $6,000.00 |
| 48 | Removing structure (headwall) (496-7006) | EACH | 15 | $3,300.00 | $1,000.00 | $900.00 | $753.30 | $900.00 | $500.00 | $4,500.00 |
| 49 | Removing structure (pipe) (496-7007) | LF | 3,797 | $21.90 | $8.00 | $5.00 | $15.07 | $5.00 | $50.00 | $17.50 |
| 50 | Removing structure (box culvert) (496-7008) | LF | 13 | $225.50 | $100.00 | $100.00 | $200.88 | $100.00 | $100.00 | $750.00 |
| 51 | Mobilization (500-7001) | LS | 1 | $2,114,220 | $905,756 | $871,500 | $2,109,843 | $1,900,000 | $2,000,000 | $1,825,000 |
| 52 | Barricades, signs and traffic handling (502-7001) | MO | 15 | $20,000 | $10,800 | $6,231.00 | $77,252 | $100,000 | $10,000 | $63,000 |
| 53 | Portable changeable message sign (503-7002) | EACH | 2 | $15,000 | $17,500 | $22,000 | $21,650 | $28,000 | $15,000 | $20,000 |
| 54 | TMA (stationary) (505-7001) | DAY | 238 | $450.00 | $150.00 | $265.00 | $500.00 | $1.00 | $300.00 | $157.50 |
| 55 | TMA (mobile operation) (505-7002) | HR | 40 | $150.00 | $150.00 | $175.00 | $200.00 | $65.00 | $100.00 | $157.50 |
| 56 | Rock filter dams (install) (type 3) (506-7003) | LF | 750 | $71.18 | $50.00 | $50.00 | $91.00 | $35.00 | $85.00 | $70.29 |
| 57 | Rock filter dams (remove) (506-7011) | LF | 905 | $11.00 | $12.00 | $12.00 | $15.00 | $7.00 | $10.00 | $13.85 |
| 58 | Construction exits (install) (type 1) (506-7020) | SY | 339 | $28.00 | $30.00 | $30.00 | $40.56 | $15.00 | $36.00 | $38.34 |
| 59 | Construction exits (remove) (506-7024) | SY | 339 | $10.00 | $10.00 | $10.00 | $12.00 | $5.00 | $11.00 | $11.72 |
| 60 | Temporary sediment control fence (install) (506-7039) | LF | 8,042 | $5.00 | $4.50 | $3.89 | $3.53 | $3.00 | $3.55 | $3.78 |
| 61 | Temporary sediment control fence (remove) (506-7041) | LF | 8,042 | $1.25 | $1.00 | $0.35 | $0.88 | $0.30 | $1.00 | $1.33 |
| 62 | Biodegradable erosion control logs (install) (12") (506-7044) | LF | 1,463 | $6.00 | $5.50 | $5.50 | $4.37 | $4.00 | $6.00 | $5.59 |
| 63 | Biodegradable erosion control logs (install) (18") (506-7045) | LF | 5,350 | $9.00 | $7.00 | $7.00 | $5.23 | $4.00 | $6.00 | $6.39 |
| 64 | Biodegradable erosion control logs (remove) (506-7046) | LF | 6,813 | $2.00 | $0.75 | $0.30 | $0.88 | $0.30 | $1.00 | $1.33 |
| 65 | Rock filter dams (install) (type 2) 6:1 (506-7048) | LF | 155 | $85.00 | $60.00 | $60.00 | $102.00 | $50.00 | $50.00 | $52.19 |
| 66 | Driveways (concrete) (530-7006) | SY | 1,830 | $130.00 | $159.05 | $177.05 | $149.82 | $98.00 | $110.00 | $175.00 |
| 67 | Driveways (ACP) (530-7010) | SY | 7,427 | $75.00 | $82.80 | $79.80 | $84.54 | $80.00 | $84.00 | $90.00 |
| 68 | Mill rumble strips (asphalt) (shoulder) (533-7001) | LF | 78,645 | $1.00 | $0.17 | $1.14 | $0.06 | $0.16 | $0.25 | $0.13 |
| 69 | Mill rumble strips (asphalt) (centerline) (533-7002) | LF | 38,296 | $0.75 | $0.17 | $1.16 | $0.08 | $0.16 | $0.25 | $0.13 |
| 70 | Remove metal beam guard fence (542-7001) | LF | 104 | $5.41 | $10.00 | $25.00 | $5.00 | $5.00 | $3.00 | $10.65 |
| 71 | Guardrail end treatment (remove) (544-7003) | EACH | 2 | $315.00 | $500.00 | $500.00 | $375.00 | $375.00 | $480.00 | $372.75 |
| 72 | Mailbox install-S (TWW-post) type 4 (560-7008) | EACH | 74 | $315.00 | $225.00 | $269.00 | $225.00 | $322.00 | $315.00 | $282.23 |
| 73 | Mailbox install-D (TWW-post) type 4 (560-7009) | EACH | 18 | $275.00 | $250.00 | $370.00 | $250.00 | $357.00 | $355.00 | $292.88 |
| 74 | Install small roadside sign support and assembly type 10BWG(1)SA(P) (644-7001) | EACH | 72 | $710.00 | $660.00 | $800.00 | $660.00 | $630.00 | $710.00 | $692.25 |
| 75 | Install small roadside sign support and assembly type 10BWG(1)SA(P-BM) (644-7002) | EACH | 18 | $900.00 | $685.00 | $890.00 | $685.00 | $750.00 | $355.00 | $740.18 |
| 76 | Install small roadside sign support and assembly type 10BWG(1)SA(T) (644-7004) | EACH | 3 | $960.00 | $800.00 | $950.00 | $800.00 | $740.00 | $880.00 | $782.78 |
| 77 | Install small roadside sign support and assembly type 10BWG(1)SA(U) (644-7007) | EACH | 4 | $944.80 | $890.00 | $1,050.00 | $890.00 | $1,190.00 | $1,100.00 | $953.18 |
| 78 | Install small roadside sign support and assembly TYS80(1)SA(U) (644-7031) | EACH | 2 | $1,175.00 | $990.00 | $1,300.00 | $990.00 | $1,300.00 | $1,500.00 | $1,171.50 |
| 79 | Install small roadside sign support and assembly TYS80(1)SA(U-BM) (644-7034) | EACH | 5 | $1,169.00 | $995.00 | $1,630.00 | $995.00 | $1,525.00 | $1,500.00 | $1,336.58 |
| 80 | Relocate SM RD SN sup&AM type S80 (644-7067) | EACH | 1 | $650.00 | $550.00 | $1,500.00 | $550.00 | $755.00 | $800.00 | $639.00 |
| 81 | Work zone pavement marking non-removing (W)6"(solid) (662-7008) | LF | 81,697 | $0.52 | $0.27 | $0.27 | $0.27 | $0.27 | $0.27 | $0.29 |
| 82 | Work zone pavement marking non-removing (Y)6"(solid) (662-7038) | LF | 81,697 | $0.52 | $0.27 | $0.27 | $0.27 | $0.27 | $0.27 | $0.29 |
| 83 | Work zone pavement marking SHT terminal (tab)type W (662-7112) | EACH | 41 | $1.50 | $2.45 | $3.00 | $5.00 | $4.00 | $5.00 | $4.82 |
| 84 | Work zone pavement marking SHT terminal (tab)type Y-2 (662-7114) | EACH | 1,043 | $1.40 | $2.45 | $3.00 | $2.00 | $4.00 | $2.00 | $4.89 |
| 85 | Reflectorized pavement marking type I (W)6"(DOT)(100MIL) (666-7009) | LF | 453 | $1.50 | $1.80 | $1.80 | $1.80 | $1.00 | $1.80 | $1.92 |
| 86 | Reflectorized pavement marking type I (W)8"(DOT)(100MIL) (666-7018) | LF | 38 | $2.00 | $3.00 | $3.00 | $3.00 | $2.00 | $3.00 | $3.20 |
| 87 | Reflectorized pavement marking type I (W)8"(solid)(100MIL) (666-7024) | LF | 704 | $2.85 | $1.50 | $1.50 | $1.50 | $7.75 | $1.50 | $1.60 |
| 88 | Reflectorized pavement marking type I (W)24"(solid)(100MIL) (666-7036) | LF | 219 | $9.25 | $10.00 | $10.00 | $10.00 | $7.75 | $10.00 | $10.65 |
| 89 | Reflectorized pavement marking type I (W)(arrow)(100MIL) (666-7042) | EACH | 4 | $200.00 | $195.00 | $195.00 | $195.00 | $160.00 | $195.00 | $207.68 |
| 90 | Reflectorized pavement marking type I (W)(word)(100MIL) (666-7066) | EACH | 4 | $225.00 | $250.00 | $250.00 | $250.00 | $170.00 | $195.00 | $266.25 |
| 91 | Reflectorized pavement marking type I (W)6"(solid)(100MIL) (666-7411) | LF | 85,497 | $1.00 | $0.57 | $0.57 | $0.57 | $0.55 | $0.57 | $0.61 |
| 92 | Reflectorized pavement marking type I (Y)6"(broken)(100MIL) (666-7420) | LF | 8,840 | $1.00 | $0.60 | $0.60 | $0.60 | $0.59 | $0.60 | $0.64 |
| 93 | Reflectorized pavement marking type I (Y)6"(solid)(100MIL) (666-7423) | LF | 23,753 | $1.00 | $0.57 | $0.57 | $0.57 | $0.57 | $0.57 | $0.61 |
| 94 | Reflectorized pavement marker type I-C (672-7002) | EACH | 35 | $6.00 | $5.50 | $5.50 | $5.50 | $4.50 | $5.50 | $5.86 |
| 95 | Reflectorized pavement marker type II-A-A (672-7004) | EACH | 741 | $6.00 | $5.50 | $5.50 | $5.50 | $4.00 | $5.50 | $5.86 |
The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.
Source
Read from TxDOT's tabulation for this contract. TxDOT Bid Tabulations open-data export (data.texas.gov) from September 2024, read 21 November 2026, and TxDOT's legacy Tabulation of Bids pages for January 2020 to August 2024. The legacy pages are a large sample, not every contract: their file names were reused from year to year. Their district is the one TxDOT gives the county. Bids that did not match their published total are left out.
Every contract let that day: TxDOT letting of May 2, 2025. Compiled by Mirage Metrics.