TxDOT contract A00212869 bid tabulation
FERRY RAMP REPAIR, SH0087 (Galveston Landing to Port Aransas Landing). Let by Texas DOT on March 4, 2026, Galveston, Houston District. 1 bid received; low bid $40,819,142 by Texas Gulf Construction Company, Inc., +19% against the engineer's estimate of $34,405,076.
- Owner
- Texas DOT
- Letting
- 04 MAR 2026
- Pay items
- 115
- Data through
- 19 NOV 2026
Bidders
| Rank | Bidder | Total bid | Against the low bid | Against the estimate |
|---|---|---|---|---|
| 1 | Texas Gulf Construction Company, Inc. | $40,819,142 | Low | +19% |
Engineer's estimate: $34,405,076.
Bid tabulation
| Line | Pay item | Unit | Quantity | Estimate | 1. Texas Gulf Construction Company, Inc. |
|---|---|---|---|---|---|
| 1 | CW sheav asm repl (remv/install)LDG 1,4,6 (7050-7003) | EACH | 1 | $48,818 | $50,000 |
| 2 | Repl monopile CNC TWR pad 24" LDG 1,6 (7050-7004) | EACH | 1 | $151,478 | $85,000 |
| 3 | Repl SPR box CNC FND LDG 1, 4, 6 (7050-7005) | EACH | 1 | $230,713 | $125,000 |
| 4 | Chain fall repl per LDG 1, 4, 6 (7050-7006) | EACH | 1 | $67,965 | $62,784 |
| 5 | RPL lan grat pax wlkwy DMD PLT LDG1,4,6 (7050-7007) | EACH | 1 | $124,706 | $150,000 |
| 6 | RPL HD log incl BRKT and angs LDG 1,4,6 (7050-7008) | EACH | 1 | $73,209 | $50,000 |
| 7 | Repair in LFTG beam LW21X62 LDG 1,4,6 (7050-7009) | EACH | 1 | $52,590 | $50,384 |
| 8 | CHN irn for SM gratng C4X7.25 LDG 1,4,6 (7050-7010) | EACH | 1 | $66,367 | $61,302 |
| 9 | Landing refurb LDG 1, 4, 6 (7050-7011) | EACH | 1 | $361,261 | $175,000 |
| 10 | CNC counterwt BLK-LFT bolt rep LDG1,4,6 (7050-7012) | EACH | 1 | $27,393 | $23,314 |
| 11 | CNTRWGHT BLK-LFT CBL repl LDG 1, 4, 6 (7050-7013) | EACH | 2 | $41,469 | $17,712 |
| 12 | CNTRWGTH BLK ang TRK LDG 1, 4, 6 (7050-7014) | EACH | 1 | $149,604 | $30,992 |
| 13 | Rem/install hydr LFT rams LDG 1, 4, 6 (7050-7015) | EACH | 1 | $16,238 | $14,008 |
| 14 | Install SPR box anch bolt LDG 1, 4, 6 (7050-7016) | EACH | 1 | $131,940 | $100,000 |
| 15 | Rep SPR box CNC FND LDG 1, 4, 6 (7050-7017) | EACH | 1 | $26,128 | $23,669 |
| 16 | Rep SPR box AR PLT/BW LDG 1, 4, 6 (7050-7018) | EACH | 1 | $57,201 | $50,271 |
| 17 | Rep SPR box ang L9"X4"X1/4" LDG 1, 4, 6 (7050-7019) | EACH | 1 | $34,868 | $30,992 |
| 18 | Finger repl-full set LDG 2, 3, 5 (7050-7020) | EACH | 1 | $155,814 | $75,000 |
| 19 | Rem/install hydr LFT rams LDG 2, 3, 5 (7050-7021) | EACH | 2 | $16,238 | $14,008 |
| 20 | CHN fall repl LDG 2, 3, 5 (7050-7022) | EACH | 2 | $48,116 | $52,461 |
| 21 | GD rail repl LDG 2, 3, 5 (7050-7023) | EACH | 2 | $28,750 | $26,437 |
| 22 | LFT CBL repl for ramp LDG 2,3,5 (7050-7024) | EACH | 2 | $42,941 | $53,342 |
| 23 | TRQ tube bush repl LDG 2, 3, 5 (7050-7025) | EACH | 3 | $62,572 | $55,475 |
| 24 | Repl moorng ring 60" monopile any LDG (7050-7026) | EACH | 1 | $17,871 | $51,807 |
| 25 | Repl boat lift fender (7050-7027) | EACH | 1 | $10,787 | $16,763 |
| 26 | Rep metal roofing 50 SQ FT (7050-7028) | EACH | 4 | $3,956.00 | $4,136.00 |
| 27 | Repl monopile 60" D X 120' L (7050-7029) | EACH | 4 | $352,498 | $221,526 |
| 28 | Ext monopile 60" D X 20' L (7050-7030) | EACH | 1 | $74,854 | $57,747 |
| 29 | Full repl donut fender 9'10" (7050-7031) | EACH | 6 | $213,291 | $204,851 |
| 30 | Full repl donut fender 13'8" (7050-7032) | EACH | 6 | $303,037 | $286,733 |
| 31 | Donut fender rep 9'10" upper unit repl (7050-7033) | EACH | 3 | $117,116 | $150,429 |
| 32 | Donut fender rep 9'10" lower unit repl (7050-7034) | EACH | 3 | $73,037 | $70,036 |
| 33 | Donut fender rep/rem/CLN/insp (7050-7035) | EACH | 20 | $25,875 | $28,345 |
| 34 | DNFND rep timber RPL12X12 uhmw pad CHN asm (7050-7036) | EACH | 60 | $2,714.00 | $2,454.00 |
| 35 | DNFND rep timber RPL 12X8 uhmw pad CHN asm (7050-7037) | EACH | 1 | $81,225 | $2,305.00 |
| 36 | Repl wing wall timbers uhmw pads (7050-7040) | EACH | 6 | $5,578.00 | $8,477.00 |
| 37 | Repl wing wall uhmw pads (7050-7041) | EACH | 4 | $3,611.00 | $2,788.00 |
| 38 | Dolphin guard rail repl (7050-7043) | EACH | 2 | $36,478 | $33,972 |
| 39 | Repl navigation LTS per landing (7050-7044) | EACH | 12 | $4,612.00 | $3,970.00 |
| 40 | Fab install ladder at nav TWRS (7050-7045) | EACH | 2 | $19,930 | $18,971 |
| 41 | Repl adhesive retro reflectorized sign per LDG (7050-7046) | EACH | 12 | $679.00 | $573.00 |
| 42 | Repl slow bell retro reflectorized sign per LDG (7050-7047) | EACH | 12 | $679.00 | $573.00 |
| 43 | Rep raceway supt brackets LDG 2, 3, 5, (7050-7048) | EACH | 10 | $920.00 | $960.00 |
| 44 | Install shorepower any LDG (7050-7049) | EACH | 2 | $45,333 | $38,607 |
| 45 | Rem unused monopile & donut fender (7050-7050) | EACH | 1 | $47,265 | $39,787 |
| 46 | 13'9" donut FNDR uppr unt repl any LDG (7050-7051) | EACH | 1 | $187,439 | $220,887 |
| 47 | Repl old LDG rockers per LDG1,4,6 (7050-7052) | EACH | 14 | $14,104 | $7,145.00 |
| 48 | In bolts for LDG cover plates per LDG (7050-7053) | EACH | 54 | $404.43 | $133.00 |
| 49 | Inner/intermediate guide dolphin maintenance (7050-7054) | EACH | 2 | $11,535 | $16,343 |
| 50 | Rep hoist tower column supports 1, 4, 6 (7050-7055) | EACH | 1 | $50,416 | $46,325 |
| 51 | Refurb hoist tower frame & attach 1,4,6 (7050-7056) | EACH | 1 | $16,859 | $14,337 |
| 52 | Repl refurb spring box 1,4,6 (7050-7058) | EACH | 7 | $22,893 | $20,666 |
| 53 | Reloc pair donut fenders uppr lowr unt (7050-7059) | EACH | 30 | $2,795.00 | $2,373.00 |
| 54 | Rep donut fender upper or lowr unt (7050-7060) | EACH | 12 | $33,028 | $11,273 |
| 55 | Shore power maintenance rep per LDG (7050-7061) | EACH | 1 | $8,280.00 | $8,824.00 |
| 56 | Complete replacement of outer dolphin (7050-7062) | EACH | 4 | $149,500 | $125,355 |
| 57 | Combiwall maintenance (7050-7063) | EACH | 3 | $823,791 | $992,337 |
| 58 | Refurb A-frame counterbalance structure (7050-7064) | EACH | 2 | $575,046 | $2,155,957 |
| 59 | Upper pintle replacement (7050-7065) | EACH | 2 | $132,791 | $219,671 |
| 60 | Lower pintle bearing replacement (7050-7066) | EACH | 2 | $141,899 | $255,038 |
| 61 | Landing ramp refurbishment (7050-7067) | EACH | 2 | $249,723 | $427,372 |
| 62 | Dolphin wing wall repl any LDG (7050-7068) | EACH | 2 | $287,500 | $488,683 |
| 63 | Replace security booth (7050-7069) | EACH | 2 | $112,608 | $89,844 |
| 64 | Bus shelter replacement (7050-7070) | EACH | 1 | $29,613 | $18,335 |
| 65 | Bottom survey (7050-7071) | EACH | 6 | $20,516 | $18,752 |
| 66 | Bucket dredging 50 cubic yards (7050-7072) | EACH | 10 | $24,346 | $5,000.00 |
| 67 | Replace monopile top (7050-7073) | EACH | 2 | $13,294 | $12,281 |
| 68 | Outer dolphin replacement type I or II (7050-7074) | EACH | 4 | $546,250 | $490,684 |
| 69 | Repl hardware trans span LDG W18/W21 (7050-7075) | EACH | 2 | $126,500 | $80,485 |
| 70 | Recoat 60" diam guide dolphin monopile (7050-7076) | EACH | 12 | $143,750 | $189,905 |
| 71 | Replace guard railing at A-frame towers (7050-7077) | EACH | 3 | $25,300 | $10,690 |
| 72 | Repl donut fender assem (owner/install) (7050-7078) | EACH | 6 | $46,000 | $4,935.00 |
| 73 | Fab & deliver donut fender assembly (7050-7079) | EACH | 6 | $178,250 | $201,159 |
| 74 | Repl intermediate dolphin donut assem (7050-7080) | EACH | 6 | $57,500 | $4,935.00 |
| 75 | Fabricate & deliver intermediate fender (7050-7081) | EACH | 6 | $253,000 | $283,041 |
| 76 | Refurb breasting dolphin (pile, repair) (7050-7082) | EACH | 12 | $89,125 | $359,485 |
| 77 | Refurbish breasting dolphin wing wall (7050-7083) | EACH | 12 | $158,125 | $353,016 |
| 78 | Refurb A-frame tower sys at LDG 2,3,5 (7050-7084) | EACH | 3 | $207,000 | $142,319 |
| 79 | Refurb transfer span at LDG 2,3,5 (7050-7085) | EACH | 3 | $747,500 | $79,356 |
| 80 | Refurbish guide dolphin at LDG (7050-7086) | EACH | 12 | $115,000 | $95,719 |
| 81 | Repl pedestrian canopy roofing at LDG 2,3,5 (7050-7087) | EACH | 3 | $2,875.00 | $5,000.00 |
| 82 | Replace platform roofing & recoating (7050-7088) | EACH | 3 | $3,738.00 | $5,515.00 |
| 83 | Refurb hoist tower at LDG 4 or 6 (7050-7089) | EACH | 2 | $230,000 | $185,000 |
| 84 | Refurbish hoist tower at LDG 4 (7050-7090) | EACH | 1 | $230,000 | $150,000 |
| 85 | Refurbish guide dolphin at work dock (7050-7091) | EACH | 15 | $17,250 | $12,680 |
| 86 | Rep landing ramp cap spalling at LDG (7050-7092) | EACH | 4 | $28,750 | $10,819 |
| 87 | Rep hoist tower cap spalling at LDG (7050-7093) | EACH | 2 | $28,750 | $14,036 |
| 88 | Rep TFR span tower cap spalling LDG (7050-7094) | EACH | 3 | $28,750 | $10,819 |
| 89 | Epoxy concrete crack repair at LDG (7050-7095) | LF | 1,000 | $201.25 | $105.00 |
| 90 | Miscellaneous concrete spall repair (7050-7096) | SF | 300 | $1,150.00 | $827.00 |
| 91 | Miscellaneous struct steel repair/replacement (7050-7097) | LB | 10,000 | $13.80 | $3.00 |
| 92 | Full penetration welding & recoating (7050-7098) | LB | 4,000 | $29.00 | $2.00 |
| 93 | Miscellaneous bolt removal and replacement (7050-7099) | EACH | 300 | $230.00 | $65.00 |
| 94 | Miscellaneous reinforced steel removal & replacement (7050-7100) | LB | 6,000 | $14.00 | $2.00 |
| 95 | Repl wear plate 1½ X 24½ X 9’-0½" (7050-7101) | EACH | 3 | $50,400 | $222,333 |
| 96 | Repl transition plate 1¼ X 13 X 9’-0½" (7050-7102) | EACH | 3 | $10,920 | $89,230 |
| 97 | Repl trans plates 5/8 X 34.7 X 2’–3’ (7050-7103) | EACH | 3 | $21,840 | $65,492 |
| 98 | Repl bridge railing transition at spans (7050-7104) | EACH | 3 | $26,000 | $25,003 |
| 99 | Repl pedestrian railing closure at spans (7050-7105) | EACH | 3 | $2,500.00 | $11,766 |
| 100 | Repl grating at transfer span LDGS (7050-7106) | EACH | 3 | $105,000 | $238,997 |
| 101 | Repair utility boom access walkway (7050-7107) | EACH | 1 | $50,000 | $11,250 |
| 102 | Rep walkway assembly 1 & ladder type I (7050-7108) | EACH | 1 | $10,000 | $11,250 |
| 103 | Rep walkway assem 2 at LDG 2 or 3 (7050-7109) | EACH | 1 | $25,000 | $11,250 |
| 104 | Rep walkway assembly 3 & LDR types LDG 2 (7050-7110) | EACH | 1 | $50,000 | $11,250 |
| 105 | Rep walkway assembly 4 at any LDG (7050-7111) | EACH | 1 | $10,000 | $11,250 |
| 106 | Rep walkway assembly 5 at LDG 5 (7050-7112) | EACH | 1 | $37,500 | $11,250 |
| 107 | Rep guard rail at LDG 2, 3 or 5 (7050-7113) | EACH | 3 | $5,000.00 | $29,415 |
| 108 | Repair pedestrian & maintenance gates (7050-7114) | EACH | 3 | $5,000.00 | $7,721.00 |
| 109 | Rep rail extensions & ladders at LDG (7050-7115) | EACH | 3 | $5,000.00 | $4,412.00 |
| 110 | Rep maintenance anchor platform LDG 2,3,5 (7050-7116) | EACH | 3 | $5,000.00 | $20,451 |
| 111 | Rep traffic arm maintenance platform at LDG 3,5 (7050-7117) | EACH | 3 | $5,000.00 | $20,451 |
| 112 | Rep counterwt anch & traffic arm at LDG (7050-7118) | EACH | 3 | $5,000.00 | $19,304 |
| 113 | Upper DN FNDR uhmw(1 1/2"X12"X57")repl (7050-7119) | EACH | 75 | $690.00 | $642.00 |
| 114 | Relocate marine repair equipment (7051-7001) | EACH | 80 | $1,564.00 | $1,503.00 |
| 115 | Marine mobilization (7053-7001) | EACH | 8 | $21,540 | $23,253 |
The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.
Source
Read from TxDOT's tabulation for this contract. TxDOT Bid Tabulations open-data export (data.texas.gov) from September 2024, read 21 November 2026, and TxDOT's legacy Tabulation of Bids pages for January 2020 to August 2024. The legacy pages are a large sample, not every contract: their file names were reused from year to year. Their district is the one TxDOT gives the county. Bids that did not match their published total are left out.
Every contract let that day: TxDOT letting of March 4, 2026. Compiled by Mirage Metrics.