TxDOT contract A00002148 bid tabulation
Bridge Replacement, FM 219 (@ CHILDRESS CRK to (STR #014)). Let by Texas DOT on March 4, 2026, Bosque, Waco District. 4 bids received; low bid $14,455,829 by Knife River Corporation - South, -16% against the engineer's estimate of $17,109,785.
- Owner
- Texas DOT
- Letting
- 04 MAR 2026
- Pay items
- 178
- Data through
- 19 NOV 2026
Bidders
| Rank | Bidder | Total bid | Against the low bid | Against the estimate |
|---|---|---|---|---|
| 1 | Knife River Corporation - South | $14,455,829 | Low | -16% |
| 2 | Texas Materials Group, Inc. | $15,106,911 | +5.0% | -12% |
| 3 | Big Creek Construction, LTD. | $15,287,833 | +6.0% | -11% |
| 4 | Jay Mills Contracting, Incorporated | $20,381,402 | +41% | +19% |
Engineer's estimate: $17,109,785.
Bid tabulation
| Line | Pay item | Unit | Quantity | Estimate | 1. Knife River Corporation - South | 2. Texas Materials Group, Inc. | 3. Big Creek Construction, LTD. | 4. Jay Mills Contracting, Incorporated |
|---|---|---|---|---|---|---|---|---|
| 1 | Preparing row (100-7002) | STA | 489.50 | $320.00 | $400.00 | $1,000.00 | $650.00 | |
| 2 | Removing concrete (mowstrip) (104-7005) | LF | 1,175 | $8.75 | $12.30 | $14.00 | $9.00 | |
| 3 | Removing concrete (riprap) (104-7006) | SY | 40 | $25.00 | $20.00 | $21.00 | $29.00 | $18.00 |
| 4 | Removing concrete (driveways) (104-7011) | SY | 1,138 | $17.00 | $31.18 | $15.00 | $21.00 | |
| 5 | Removing concrete (curb ramp) (104-7015) | SY | 24 | $40.00 | $35.00 | $55.00 | $21.00 | |
| 6 | Removing concrete (curb or curb & gutter) (104-7018) | LF | 597 | $11.00 | $24.00 | $15.00 | $18.00 | |
| 7 | Removing concrete (miscellaneous) (104-7046) | SY | 437 | $11.00 | $43.00 | $26.00 | $30.00 | |
| 8 | Remove (0"-10") TRT/untrt base & asphalt pavement (105-7050) | SY | 109 | $16.00 | $6.95 | $20.00 | $25.00 | |
| 9 | Remove (0"-12") TRT/untrt base & asphalt pavement (105-7052) | SY | 10,395 | $2.90 | $9.19 | $5.00 | $9.00 | |
| 10 | Obliterating abandoned road (106-7002) | SY | 660 | $2.95 | $0.01 | $10.00 | $18.00 | |
| 11 | Excavation (roadway) (110-7001) | CY | 36,610 | $9.75 | $7.90 | $12.00 | $15.00 | |
| 12 | Excavation (channel) (110-7002) | CY | 659 | $12.00 | $41.00 | $25.00 | $30.00 | |
| 13 | Embankment (final)(OC)(type B) (132-7003) | CY | 38,972 | $9.75 | $7.05 | $15.00 | $15.00 | |
| 14 | Furn & place topsoil (4") (160-7002) | SY | 366,426 | $0.59 | $0.27 | $0.50 | $3.80 | |
| 15 | Broadcast seed (permanent_rural_clay) (164-7002) | SY | 392 | $0.20 | $5.35 | $6.00 | $1.10 | |
| 16 | Broadcast seed (temporary_warm_cool) (164-7007) | SY | 392 | $0.16 | $4.35 | $5.00 | $1.10 | |
| 17 | Drill seed (permanent_rural_clay) (164-7010) | SY | 366,426 | $0.14 | $0.14 | $0.16 | $0.19 | |
| 18 | Drill seed (temporary_warm_cool) (164-7015) | SY | 366,426 | $0.11 | $0.09 | $0.11 | $0.19 | |
| 19 | Vegetative watering (168-7001) | TGL | 5,957 | $1.00 | $6.00 | $10.00 | $21.00 | |
| 20 | Soil ret BLKT(SL_mod_clay_long_roll) (169-7010) | SY | 12,895 | $3.50 | $1.50 | $1.80 | $2.20 | |
| 21 | FL BS (compacted in place)(type D GR 5)(final pos) (247-7191) | CY | 30,673 | $55.00 | $56.00 | $70.00 | $80.30 | |
| 22 | FL BS (roadway del) (type D GR 3) (247-7210) | TON | 41,404 | $26.00 | $25.00 | $30.00 | $29.50 | |
| 23 | Rework BS metal (type C)(6")(ord comp) (251-7049) | SY | 114,362 | $1.50 | $1.00 | $1.10 | $3.75 | |
| 24 | Cement (275-7001) | TON | 1,133 | $219.00 | $222.00 | $215.00 | $242.00 | |
| 25 | Cement TRT (existing material & new base)(6") (275-7006) | SY | 188,890 | $1.50 | $2.50 | $2.30 | $4.10 | |
| 26 | Emuls asphalt (BS or subgr TRT)(CSS-1H) (314-7004) | GAL | 214,277 | $1.00 | $3.50 | $2.62 | $3.05 | |
| 27 | Fog seal (CSS-1H) (315-7004) | GAL | 17,857 | $2.75 | $4.60 | $5.00 | $5.06 | |
| 28 | Asphalt (CRS-2) (316-7011) | GAL | 106,848 | $2.95 | $3.30 | $2.75 | $3.65 | |
| 29 | Aggregate (type-D or L, GR-4) (316-7253) | CY | 1,319 | $160.00 | $125.00 | $95.00 | $137.50 | |
| 30 | SP mixes SP-C sac-B PG70-22 (344-7021) | TON | 20,533 | $117.00 | $138.00 | $84.00 | $143.00 | |
| 31 | SP mixes SP-C sac-B PG76-22 (exempt) (344-7039) | TON | 1,096 | $143.00 | $160.00 | $102.00 | $167.20 | |
| 32 | Tack coat (344-7077) | GAL | 18,761 | $1.50 | $2.65 | $3.00 | $2.95 | |
| 33 | Flexible pavement structure repair(8") (351-7007) | SY | 1,466 | $78.00 | $89.00 | $70.00 | $93.50 | |
| 34 | Plane & text asphalt concrete pavement(0" to 3") (354-7003) | SY | 9,532 | $2.40 | $1.99 | $2.50 | $1.80 | |
| 35 | Full - depth repair CPCD (6") (361-7017) | CY | 71 | $1,250.00 | $260.00 | $1,100.00 | $500.00 | |
| 36 | Cut & restore asphalt paving (400-7008) | SY | 296 | $180.00 | $150.00 | $90.00 | $200.00 | |
| 37 | Cem stabil BKFL (400-7010) | CY | 742 | $300.00 | $232.00 | $256.00 | $190.00 | $130.00 |
| 38 | Trench excavation protection (402-7001) | LF | 826 | $9.40 | $10.00 | $15.00 | $5.00 | |
| 39 | Temporary special shoring (403-7001) | SF | 2,817 | $23.00 | $35.00 | $30.00 | $50.00 | |
| 40 | Drilled shaft (18 in) (416-7002) | LF | 80 | $180.00 | $255.00 | $121.00 | $260.00 | $126.50 |
| 41 | Drilled shaft (36 in) (416-7006) | LF | 200 | $300.00 | $330.00 | $422.00 | $350.00 | $286.00 |
| 42 | Class C concrete (abutment)(HPC) (420-7013) | CY | 62.30 | $1,300.00 | $1,250.00 | $1,237.00 | $1,270.00 | $1,100.00 |
| 43 | Reinforced concrete slab (422-7001) | SF | 5,060 | $27.00 | $30.00 | $33.00 | $30.00 | $28.60 |
| 44 | Approach slab (422-7013) | CY | 70.60 | $700.00 | $675.00 | $754.00 | $1,000.00 | $880.00 |
| 45 | Prestressed concrete X-beam (5XB40) (425-7041) | LF | 657 | $270.00 | $530.00 | $542.00 | $600.00 | $705.00 |
| 46 | Concrete structure repair(clean & coat WTH epoxy) (429-7001) | SF | 25 | $285.00 | $250.00 | $315.00 | $330.00 | |
| 47 | Concrete structure repair (standard) (429-7009) | SF | 25 | $285.00 | $250.00 | $240.00 | $330.00 | |
| 48 | Riprap (concrete)(4 in) (432-7001) | CY | 3 | $870.00 | $800.00 | $1,100.00 | $1,100.00 | |
| 49 | Riprap (mow strip)(4 in) (432-7013) | CY | 209 | $625.00 | $600.00 | $700.00 | $675.00 | |
| 50 | Riprap (stone protection)(12 in) (432-7041) | CY | 26 | $265.00 | $250.00 | $210.00 | $200.00 | |
| 51 | Riprap (stone protection)(18 in) (432-7043) | CY | 1,481 | $180.00 | $127.00 | $150.00 | $150.00 | $160.00 |
| 52 | Miscellaneous non-bridge (nbis) (442-7017) | LB | 112 | $22.00 | $85.00 | $35.00 | $10.00 | |
| 53 | Rail (type T223) (450-7008) | LF | 372 | $175.00 | $155.00 | $170.00 | $195.00 | $154.00 |
| 54 | Armor joint (sealed) (454-7003) | LF | 90 | $160.00 | $145.00 | $159.00 | $140.00 | $167.00 |
| 55 | Concrete box culvert (8 FT X 3 FT) (462-7020) | LF | 96 | $695.00 | $635.00 | $570.00 | $655.00 | |
| 56 | Concrete box culvert (6 FT X 3 FT)(extend) (462-7066) | LF | 24 | $765.00 | $1,130.00 | $1,120.00 | $1,245.00 | |
| 57 | Concrete box culvert (6 FT X 4 FT)(extend) (462-7067) | LF | 21 | $900.00 | $1,200.00 | $1,225.00 | $1,320.00 | |
| 58 | Concrete box culvert (6 FT X 5 FT)(extend) (462-7068) | LF | 24 | $1,045.00 | $1,300.00 | $1,275.00 | $1,430.00 | |
| 59 | Concrete box culvert (9 FT X 5 FT)(extend) (462-7082) | LF | 22 | $1,285.00 | $1,595.00 | $1,675.00 | $1,775.00 | |
| 60 | Concrete box culvert (5 FT X 6 FT) (extend) (462-7113) | LF | 54 | $1,045.00 | $1,260.00 | $1,325.00 | $1,400.00 | |
| 61 | RC pipe (CL IV)(18 in) (464-7019) | LF | 2,256 | $77.00 | $68.00 | $86.00 | $85.00 | |
| 62 | RC pipe (CL IV)(24 in) (464-7021) | LF | 832 | $127.00 | $92.00 | $122.00 | $115.00 | |
| 63 | RC pipe (CL IV)(36 in) (464-7024) | LF | 668 | $263.00 | $154.00 | $200.00 | $196.00 | |
| 64 | RC pipe (CL IV)(42 in) (464-7025) | LF | 156 | $265.00 | $284.00 | $220.00 | $326.00 | |
| 65 | Wingwall (PW - 1) (HW=5 FT) (466-7175) | EACH | 2 | $11,800 | $11,100 | $17,200 | $12,300 | |
| 66 | Wingwall (SW - 0) (HW=7 FT) (466-7206) | EACH | 2 | $12,100 | $18,000 | $15,600 | $20,000 | |
| 67 | Set (type I)(S= 5 FT)(HW= 7 FT)(3:1)(C) (467-7111) | EACH | 4 | $15,300 | $20,150 | $16,600 | $22,350 | |
| 68 | Set (type I)(S= 6 FT)(HW= 4 FT)(4:1)(C) (467-7129) | EACH | 2 | $13,800 | $12,500 | $9,700.00 | $14,000 | |
| 69 | Set (type I)(S= 6 FT)(HW= 5 FT)(3:1)(C) (467-7132) | EACH | 2 | $14,700 | $14,400 | $13,600 | $16,000 | |
| 70 | Set (type I)(S= 6 FT)(HW= 6 FT)(3:1)(C) (467-7136) | EACH | 2 | $14,800 | $16,470 | $16,700 | $18,250 | |
| 71 | Set (type I)(S= 9 FT)(HW= 6 FT)(3:1)(C) (467-7209) | EACH | 2 | $16,400 | $22,750 | $18,500 | $25,250 | |
| 72 | Set (type II) (18 in) (RCP) (4: 1) (C) (467-7306) | EACH | 7 | $1,285.00 | $915.00 | $900.00 | $1,020.00 | |
| 73 | Set (type II) (18 in) (RCP) (6: 1) (C) (467-7307) | EACH | 1 | $1,530.00 | $1,125.00 | $1,050.00 | $1,350.00 | |
| 74 | Set (type II) (18 in) (RCP) (6: 1) (P) (467-7308) | EACH | 102 | $1,530.00 | $1,125.00 | $1,050.00 | $1,350.00 | |
| 75 | Set (type II) (24 in) (RCP) (3: 1) (C) (467-7325) | EACH | 4 | $1,380.00 | $1,032.00 | $1,120.00 | $1,225.00 | |
| 76 | Set (type II) (24 in) (RCP) (4: 1) (C) (467-7326) | EACH | 1 | $1,550.00 | $1,188.00 | $1,230.00 | $1,500.00 | |
| 77 | Set (type II) (24 in) (RCP) (6: 1) (C) (467-7327) | EACH | 7 | $1,830.00 | $1,432.00 | $1,400.00 | $1,850.00 | |
| 78 | Set (type II) (24 in) (RCP) (6: 1) (P) (467-7328) | EACH | 26 | $1,830.00 | $1,432.00 | $1,400.00 | $1,850.00 | |
| 79 | Set (type II) (36 in) (RCP) (3: 1) (C) (467-7365) | EACH | 11 | $2,830.00 | $2,700.00 | $3,020.00 | $2,750.00 | |
| 80 | Set (type II) (36 in) (RCP) (4: 1) (C) (467-7366) | EACH | 7 | $3,265.00 | $3,600.00 | $3,420.00 | $3,200.00 | |
| 81 | Set (type II) (36 in) (RCP) (6: 1) (P) (467-7368) | EACH | 4 | $4,260.00 | $8,000.00 | $4,500.00 | $4,250.00 | |
| 82 | Set (type II) (42 in) (RCP) (4: 1) (C) (467-7378) | EACH | 6 | $4,335.00 | $9,000.00 | $4,600.00 | $5,000.00 | |
| 83 | Adjusting manholes (479-7001) | EACH | 2 | $2,100.00 | $1,800.00 | $2,500.00 | $800.00 | |
| 84 | Adjusting manholes (utility valve) (479-7009) | EACH | 2 | $2,100.00 | $1,800.00 | $2,200.00 | $400.00 | |
| 85 | Clean existing culverts (480-7001) | EACH | 11 | $1,750.00 | $3,000.00 | $2,000.00 | $3,250.00 | |
| 86 | Removing structure (set) (496-7004) | EACH | 116 | $500.00 | $125.00 | $300.00 | $475.00 | |
| 87 | Removing structure (wingwall) (496-7005) | EACH | 2 | $1,650.00 | $1,200.00 | $1,900.00 | $1,400.00 | |
| 88 | Removing structure (pipe) (496-7007) | LF | 2,118 | $15.50 | $9.00 | $20.00 | $20.00 | |
| 89 | Removing structure (box culvert) (496-7008) | LF | 146 | $500.00 | $50.00 | $100.00 | $50.00 | |
| 90 | Removing structure (bridge 0 - 99 FT length) (496-7009) | EACH | 1 | $30,000 | $44,000 | $27,500 | $30,000 | $55,400 |
| 91 | Removing structure (RR track) (496-7026) | LF | 207 | $70.00 | $14.00 | $60.00 | $30.00 | |
| 92 | Mobilization (500-7001) | LS | 1 | $1,270,000 | $1,276,000 | $1,200,000 | $1,400,000 | $2,000,000 |
| 93 | Barricades, signs and traffic handling (502-7001) | MO | 18 | $15,000 | $6,225.00 | $3,500.00 | $16,500 | |
| 94 | Portable changeable message sign (503-7002) | EACH | 2 | $15,000 | $5,500.00 | $10,000 | $24,000 | |
| 95 | TMA (stationary) (505-7001) | DAY | 394 | $5.00 | $85.00 | $150.00 | $170.00 | |
| 96 | TMA (mobile operation) (505-7003) | DAY | 25 | $25.00 | $605.00 | $500.00 | $170.00 | |
| 97 | Rock filter dams (install) (type 2) (506-7002) | LF | 1,987 | $37.00 | $36.00 | $40.00 | $44.50 | |
| 98 | Rock filter dams (remove) (506-7011) | LF | 1,987 | $10.00 | $10.00 | $5.00 | $13.50 | |
| 99 | Temporary sediment control fence (install) (506-7039) | LF | 15,055 | $4.75 | $3.50 | $3.25 | $4.50 | |
| 100 | Temporary sediment control fence (remove) (506-7041) | LF | 15,055 | $1.00 | $1.00 | $1.00 | $0.55 | |
| 101 | Biodegradable erosion control logs (install) (8") (506-7043) | LF | 22 | $10.00 | $4.50 | $10.00 | $11.25 | |
| 102 | Biodegradable erosion control logs (remove) (506-7046) | LF | 22 | $2.00 | $1.00 | $1.50 | $5.60 | |
| 103 | Constructing detours (508-7001) | SY | 1,649 | $50.00 | $55.00 | $80.00 | $55.00 | |
| 104 | Concrete curb & gutter (type II) (529-7009) | LF | 77 | $83.00 | $65.00 | $95.00 | $71.50 | |
| 105 | Intersections (ACP) (530-7002) | SY | 576 | $82.00 | $85.00 | $70.00 | $80.00 | |
| 106 | Driveways (concrete) (hes) (530-7007) | SY | 469 | $210.00 | $140.00 | $140.00 | $230.00 | |
| 107 | Driveways (ACP) (type 1) (530-7011) | SY | 958 | $48.00 | $48.00 | $25.00 | $45.00 | |
| 108 | Driveways (ACP) (type 2) (530-7012) | SY | 6,115 | $63.00 | $73.00 | $50.00 | $72.00 | |
| 109 | Turnouts (ACP) (530-7018) | SY | 1,181 | $80.00 | $35.00 | $40.00 | $70.00 | |
| 110 | Curb ramps (type 1) (531-7005) | EACH | 1 | $4,250.00 | $2,100.00 | $3,500.00 | $2,400.00 | |
| 111 | Curb ramps (type 2) (531-7006) | EACH | 1 | $4,250.00 | $2,200.00 | $5,000.00 | $2,500.00 | |
| 112 | Mill rumble strips (asphalt) (shoulder) (533-7001) | LF | 88,838 | $0.20 | $0.20 | $0.20 | $0.22 | |
| 113 | Mill rumble strips (asphalt) (centerline) (533-7002) | LF | 42,361 | $0.20 | $0.21 | $0.20 | $0.23 | |
| 114 | Metal W-beam guard fence (steel post) (540-7002) | LF | 3,000 | $29.50 | $27.75 | $35.00 | $31.05 | |
| 115 | Metal beam guard fence trans (thrie-beam) (540-7005) | EACH | 2 | $2,830.00 | $2,630.00 | $2,500.00 | $2,385.00 | |
| 116 | Metal beam guard fence trans (TL2) (540-7006) | EACH | 2 | $1,075.00 | $1,215.00 | $1,500.00 | $1,440.00 | |
| 117 | Metal thrie-beam guard fence (steel post) (540-7020) | EACH | 4 | $2,000.00 | $2,130.00 | $2,400.00 | $2,385.00 | |
| 118 | Remove metal beam guard fence (542-7001) | LF | 1,375 | $2.10 | $5.00 | $3.00 | $2.80 | |
| 119 | Guardrail end treatment (install) (544-7001) | EACH | 16 | $3,200.00 | $2,965.00 | $3,300.00 | $3,220.00 | |
| 120 | Guardrail end treatment (remove) (544-7003) | EACH | 6 | $210.00 | $250.00 | $250.00 | $280.00 | |
| 121 | Wire fence (type C) (552-7003) | LF | 278 | $40.00 | $31.00 | $30.00 | $56.00 | |
| 122 | Wire fence (remove) (552-7011) | LF | 860 | $4.75 | $13.00 | $10.00 | $5.60 | |
| 123 | Mailbox install-M (TWG-post) type 1 (560-7001) | EACH | 1 | $470.00 | $450.00 | $500.00 | $555.00 | |
| 124 | Mailbox install-S (TWG-post) type 2 (560-7002) | EACH | 26 | $280.00 | $270.00 | $300.00 | $245.00 | |
| 125 | Mailbox install-D (TWG-post) type 2 (560-7003) | EACH | 4 | $315.00 | $300.00 | $350.00 | $266.00 | |
| 126 | Replace existing aluminum signs(type A) (636-7004) | SF | 6 | $33.50 | $32.00 | $35.00 | $56.00 | |
| 127 | Install small roadside sign support and assembly type 10BWG(1)SA(P) (644-7001) | EACH | 84 | $630.00 | $600.00 | $660.00 | $780.00 | |
| 128 | Install small roadside sign support and assembly type 10BWG(1)SA(T) (644-7004) | EACH | 11 | $765.00 | $730.00 | $870.00 | $855.00 | |
| 129 | Install small roadside sign support and assembly type 10BWG(1)SA(U) (644-7007) | EACH | 3 | $900.00 | $860.00 | $960.00 | $1,055.00 | |
| 130 | Install small roadside sign support and assembly type 10BWG(1)SB(P) (644-7009) | EACH | 9 | $700.00 | $675.00 | $740.00 | $835.00 | |
| 131 | Install small roadside sign support and assembly type 10BWG(1)SB(T) (644-7012) | EACH | 1 | $870.00 | $830.00 | $950.00 | $1,000.00 | |
| 132 | Install small roadside sign support and assembly TYS80(1)SA(T) (644-7028) | EACH | 4 | $1,050.00 | $1,000.00 | $1,100.00 | $1,100.00 | |
| 133 | Remove SM RD SN sup&AM (644-7073) | EACH | 75 | $100.00 | $100.00 | $220.00 | $115.00 | |
| 134 | Relocate SM RD SN sup & AM type temporary (644-7077) | EACH | 44 | $340.00 | $450.00 | $375.00 | $300.00 | |
| 135 | Isrsa TYS80(1)SA(T) (excluding sign) (644-7093) | EACH | 6 | $525.00 | $500.00 | $560.00 | $780.00 | |
| 136 | Install delineator assembly (D-SW)SZ 1(WFLX)GND(BI) (658-7004) | EACH | 9 | $78.00 | $85.00 | $70.00 | $85.00 | |
| 137 | Install delineator assembly (D-SW)SZ 1(BRF)CTB (BI) (658-7013) | EACH | 2 | $50.00 | $58.00 | $40.00 | $26.00 | |
| 138 | Install delineator assembly (D-SW)SZ 1(BRF)GF2(BI) (658-7019) | EACH | 36 | $50.00 | $42.00 | $40.00 | $27.00 | |
| 139 | Install object marker assembly (OM-2Z)(WFLX)GND (658-7058) | EACH | 4 | $95.00 | $78.00 | $85.00 | $85.00 | |
| 140 | Install object marker assembly (OM-2Z)(WFLX)GND(BI) (658-7059) | EACH | 48 | $95.00 | $78.00 | $87.00 | $85.00 | |
| 141 | Work zone pavement marking non-removing (W)6"(solid) (662-7008) | LF | 202,588 | $0.18 | $0.19 | $0.22 | $0.22 | |
| 142 | Work zone pavement marking non-removing (W)8"(DOT) (662-7010) | LF | 104 | $1.68 | $1.00 | $2.00 | $0.30 | |
| 143 | Work zone pavement marking non-removing (W)8"(lane drop) (662-7011) | LF | 36 | $0.89 | $1.00 | $0.95 | $0.30 | |
| 144 | Work zone pavement marking non-removing (W)8"(solid) (662-7012) | LF | 4,986 | $0.35 | $0.40 | $0.37 | $0.30 | |
| 145 | Work zone pavement marking non-removing (W)24"(solid) (662-7017) | LF | 1,336 | $3.16 | $2.50 | $4.00 | $4.50 | |
| 146 | Work zone pavement marking non-removing (W)(arrow) (662-7018) | EACH | 8 | $104.00 | $40.00 | $110.00 | $50.00 | |
| 147 | Work zone pavement marking non-removing (W)(RR crossing) (662-7024) | EACH | 4 | $315.00 | $100.00 | $330.00 | $111.00 | |
| 148 | Work zone pavement marking non-removing(W)(word) (662-7030) | EACH | 26 | $105.00 | $40.00 | $110.00 | $58.00 | |
| 149 | Work zone pavement marking non-removing(W)36"(yld tri) (662-7032) | EACH | 42 | $36.00 | $13.00 | $40.00 | $17.00 | |
| 150 | Work zone pavement marking non-removing (Y)6"(broken) (662-7036) | LF | 14,220 | $0.20 | $0.21 | $0.22 | $0.22 | |
| 151 | Work zone pavement marking non-removing (Y)6"(solid) (662-7038) | LF | 145,050 | $0.18 | $0.19 | $0.22 | $0.22 | |
| 152 | Reflectorized pavement marking type I (W)8"(DOT)(100MIL) (666-7018) | LF | 52 | $1.74 | $1.00 | $1.80 | $1.15 | |
| 153 | Reflectorized pavement marking type I (W)8"(lane drop)(100MIL) (666-7021) | LF | 18 | $1.05 | $1.00 | $1.10 | $1.15 | |
| 154 | Reflectorized pavement marking type I (W)8"(solid)(100MIL) (666-7024) | LF | 2,493 | $0.87 | $0.84 | $0.92 | $0.83 | |
| 155 | Reflectorized pavement marking type I (W)24"(solid)(100MIL) (666-7036) | LF | 668 | $6.58 | $6.20 | $7.70 | $12.20 | |
| 156 | Type I high perf PM (W)6"(solid)(100MIL) (666-7293) | LF | 101,294 | $0.58 | $0.50 | $0.60 | $0.65 | |
| 157 | Type I high perf PM (Y)6"(broken)(100MIL) (666-7302) | LF | 7,110 | $0.58 | $0.52 | $0.60 | $0.67 | |
| 158 | Type I high perf PM (Y)6"(solid)(100MIL) (666-7305) | LF | 72,525 | $0.58 | $0.50 | $0.60 | $0.65 | |
| 159 | Pavement sler 4" (666-7346) | LF | 404 | $0.14 | $0.20 | $0.17 | $1.95 | |
| 160 | Pavement sler 6" (666-7347) | LF | 340 | $0.17 | $0.30 | $0.19 | $2.50 | |
| 161 | Pavement sler (word) (666-7354) | EACH | 4 | $31.00 | $25.00 | $35.00 | $27.50 | |
| 162 | Pavement sler (symbol) (666-7363) | EACH | 4 | $94.00 | $25.00 | $100.00 | $27.50 | |
| 163 | Reflectorized pavement marking type I (W)4"(solid)(100MIL) (666-7405) | LF | 404 | $0.41 | $2.00 | $0.46 | $2.20 | |
| 164 | PRFB rumble strip (BLK)(4')(transverse) (668-7001) | LF | 80 | $11.30 | $10.00 | $12.00 | $33.25 | |
| 165 | Prefabricated PM type C (W)(arrow) (668-7091) | EACH | 9 | $245.00 | $190.00 | $250.00 | $366.00 | |
| 166 | Prefabricated PM type C (W)(word) (668-7103) | EACH | 13 | $325.00 | $255.00 | $335.00 | $427.00 | |
| 167 | Prefabricated PM type C (W)(RR crossing) (668-7108) | EACH | 2 | $825.00 | $400.00 | $900.00 | $887.00 | |
| 168 | Prefabricated PM type C (W)(36")(yld tri) (668-7111) | EACH | 21 | $63.00 | $50.00 | $70.00 | $56.00 | |
| 169 | Pre PM type C(BL&WH)(acc PRK)(W/bordr)SM (668-7134) | EACH | 4 | $315.00 | $250.00 | $350.00 | $250.00 | |
| 170 | Reflectorized pavement marker type I-C (672-7002) | EACH | 118 | $4.20 | $3.75 | $5.00 | $5.00 | |
| 171 | Reflectorized pavement marker type II-A-A (672-7004) | EACH | 2,600 | $4.20 | $3.60 | $5.00 | $5.55 | |
| 172 | Pavement surface preparation for marking (4") (678-7001) | LF | 404 | $0.01 | $1.00 | $0.02 | $0.55 | |
| 173 | Pavement surface preparation for marking (6") (678-7002) | LF | 340 | $0.02 | $1.00 | $0.04 | $0.55 | |
| 174 | Pavement surface preparation for marking (word) (678-7016) | EACH | 4 | $13.00 | $10.00 | $17.00 | $22.25 | |
| 175 | Pavement surface preparation for marking (acc PRK)(SM) (678-7032) | EACH | 4 | $50.00 | $10.00 | $60.00 | $22.25 | |
| 176 | Subsurface util locate (non-paved area) (5061-7001) | EACH | 41 | $1,500.00 | $250.00 | $950.00 | $450.00 | $185.00 |
| 177 | Long channel mount curb sys (install) (6039-7001) | LF | 160 | $85.00 | $75.00 | $85.00 | $84.00 | |
| 178 | LED roadside sign (6066-7001) | EACH | 6 | $2,840.00 | $2,700.00 | $3,000.00 | $3,300.00 |
The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.
Source
Read from TxDOT's tabulation for this contract. TxDOT Bid Tabulations open-data export (data.texas.gov) from September 2024, read 21 November 2026, and TxDOT's legacy Tabulation of Bids pages for January 2020 to August 2024. The legacy pages are a large sample, not every contract: their file names were reused from year to year. Their district is the one TxDOT gives the county. Bids that did not match their published total are left out.
Every contract let that day: TxDOT letting of March 4, 2026. Compiled by Mirage Metrics.