TxDOT contract A00218322 bid tabulation
BRIDGE PREVENTATIVE MAINTENANCE, IH0010 (VARIOUS LOCATIONS to VARIOUS LOCATIONS). Let by Texas DOT on March 4, 2026, El Paso, El Paso District. 10 bids received; low bid $1,025,237 by Scott Tucker Construction Company, LLC, -21% against the engineer's estimate of $1,290,867.
- Owner
- Texas DOT
- Letting
- 04 MAR 2026
- Pay items
- 26
- Data through
- 19 NOV 2026
Bidders
| Rank | Bidder | Total bid | Against the low bid | Against the estimate |
|---|---|---|---|---|
| 1 | Scott Tucker Construction Company, LLC | $1,025,237 | Low | -21% |
| 2 | SCR Civil Construction, LLC | $1,049,325 | +2.0% | -19% |
| 3 | Pathfield Investments LLC | $1,110,440 | +8.0% | -14% |
| 4 | Premier Contractors LLC | $1,125,673 | +10% | -13% |
| 5 | Synergy Project Contractors, Inc. | $1,190,555 | +16% | -8.0% |
| 6 | Dan Williams Company | $1,202,230 | +17% | -7.0% |
| 7 | Road Doctors LLC | $1,517,078 | +48% | +18% |
| 8 | Spartan Construction of Texas, Inc. | $1,554,609 | +52% | +20% |
| 9 | Hawk Construction | $1,684,407 | +64% | +30% |
| 10 | Built Right Construction of Oklahoma, LLC | $1,946,645 | +90% | +51% |
Engineer's estimate: $1,290,867.
Bid tabulation
| Line | Pay item | Unit | Quantity | Estimate | 1. Scott Tucker Construction Company, LLC | 2. SCR Civil Construction, LLC | 3. Pathfield Investments LLC | 4. Premier Contractors LLC | 5. Synergy Project Contractors, Inc. | 6. Dan Williams Company |
|---|---|---|---|---|---|---|---|---|---|---|
| 1 | Embankment (final)(OC)(type A) (132-7001) | CY | 67 | $200.00 | $123.00 | $100.00 | $180.00 | $100.00 | $36.45 | $80.00 |
| 2 | Class C concrete (miscellaneous) (420-7067) | CY | 2 | $1,000.00 | $9,477.00 | $49,000 | $8,000.00 | $3,000.00 | $1,620.00 | $7,500.00 |
| 3 | Concrete paint finish (427-7002) | SF | 172 | $35.00 | $53.00 | $25.00 | $40.00 | $10.00 | $25.52 | $25.00 |
| 4 | Concrete structure repair(rapid deck rep(PRT DPT) (429-7004) | SF | 56 | $390.00 | $162.00 | $290.00 | $240.00 | $250.00 | $230.85 | $425.00 |
| 5 | Concrete structure repair (vertical & overhead) (429-7007) | SF | 744 | $260.00 | $248.00 | $240.00 | $300.00 | $300.00 | $243.00 | $320.00 |
| 6 | Concrete structure repair (standard) (429-7009) | SF | 196 | $300.00 | $134.00 | $240.00 | $160.00 | $300.00 | $243.00 | $345.00 |
| 7 | Cleaning and sealing existing joints (438-7001) | LF | 1,158 | $45.00 | $64.00 | $65.00 | $80.00 | $60.00 | $42.53 | $40.00 |
| 8 | Cleaning and sealing existing joints (CL3) (438-7004) | LF | 80 | $45.00 | $110.00 | $50.00 | $60.00 | $60.00 | $43.74 | $50.00 |
| 9 | Cleaning and sealing joints (foam) (438-7010) | LF | 9 | $80.00 | $253.00 | $500.00 | $1,000.00 | $150.00 | $53.46 | $300.00 |
| 10 | Miscellaneous non-bridge (nbis) (442-7017) | LB | 18 | $200.00 | $156.00 | $85.00 | $160.00 | $250.00 | $273.38 | $125.00 |
| 11 | Clean existing culverts (480-7001) | EACH | 1 | $4,250.00 | $34,753 | $29,500 | $2,500.00 | $10,000 | $3,645.00 | $15,000 |
| 12 | Raising existing struct (495-7001) | LS | 2 | $189,000 | $57,792 | $23,500 | $40,000 | $40,000 | $49,000 | $80,000 |
| 13 | Mobilization (500-7001) | LS | 1 | $117,352 | $102,876 | $104,800 | $100,000 | $100,000 | $79,600 | $120,000 |
| 14 | Barricades, signs and traffic handling (502-7001) | MO | 7 | $6,000.00 | $9,424.00 | $11,000 | $2,000.00 | $1.00 | $4,860.00 | $17,500 |
| 15 | Portable changeable message sign (503-7001) | DAY | 182 | $200.00 | $145.00 | $170.00 | $10.00 | $1.00 | $150.00 | $175.00 |
| 16 | TMA (stationary) (505-7001) | DAY | 244 | $250.00 | $416.00 | $150.00 | $10.00 | $1.00 | $300.00 | $185.00 |
| 17 | Remove delin & object marker assms (658-7078) | EACH | 4 | $60.00 | $15.00 | $100.00 | $600.00 | $400.00 | $48.60 | $30.00 |
| 18 | Install object marker assembly (OM-2Z)(WFLX)SRFHH(BI) (658-7261) | EACH | 4 | $120.00 | $200.00 | $300.00 | $190.00 | $400.00 | $182.25 | $450.00 |
| 19 | Driftwood removal area (1) (735-7062) | LS | 1 | $4,250.00 | $4,055.00 | $6,500.00 | $2,000.00 | $10,000 | $2,430.00 | $25,000 |
| 20 | CNC crack repair (discrete)(inject) (780-7002) | LF | 856 | $60.00 | $88.00 | $65.00 | $70.00 | $150.00 | $364.50 | $65.00 |
| 21 | Concrete CRCK repair(discrete)(rout and seal) (780-7003) | LF | 2,179 | $45.00 | $42.00 | $45.00 | $90.00 | $110.00 | $54.68 | $50.00 |
| 22 | CNC crack repair (flood)(gravity) (780-7005) | SF | 1,750 | $25.00 | $16.00 | $25.00 | $110.00 | $40.00 | $54.68 | $10.00 |
| 23 | Bridge joint repair (full depth) (785-7007) | LF | 2 | $500.00 | $1,602.00 | $4,700.00 | $1,500.00 | $2,000.00 | $364.50 | $4,500.00 |
| 24 | Bridge joint repair (partial depth) (785-7008) | LF | 68 | $400.00 | $303.00 | $550.00 | $110.00 | $800.00 | $121.50 | $800.00 |
| 25 | Concrete beam repair (788-7001) | EACH | 7 | $9,000.00 | $935.00 | $3,800.00 | $4,000.00 | $2,500.00 | $3,645.00 | $2,000.00 |
| 26 | Bent cap/abutment cap cleaning (7001-7002) | EACH | 7 | $1,000.00 | $556.00 | $1,200.00 | $750.00 | $2,500.00 | $72.90 | $1,700.00 |
The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.
Source
Read from TxDOT's tabulation for this contract. TxDOT Bid Tabulations open-data export (data.texas.gov) from September 2024, read 21 November 2026, and TxDOT's legacy Tabulation of Bids pages for January 2020 to August 2024. The legacy pages are a large sample, not every contract: their file names were reused from year to year. Their district is the one TxDOT gives the county. Bids that did not match their published total are left out.
Every contract let that day: TxDOT letting of March 4, 2026. Compiled by Mirage Metrics.
Your own bid history, read the same way
Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.