Hawk Construction: TxDOT bid record

Hawk Construction submitted 19 bids on Texas DOT contracts in the data, from 07 MAY 2020 to 05 AUG 2026, and was the low bidder on 2 of them (11%). When it was not low, its total sat a median +32% above the low bid.

Owner
Texas DOT
Low bid volume
$3,903,261
Latest bid
05 AUG 2026
Data through
19 NOV 2026
19Bids
2Low bids
11Win rate, percent
+32%Median gap to the low bid when not low, 17 bids

By year

YearBidsLow bidsWin rate
2020100%
20212150%
2022200%
2023100%
2024300%
20254125%
2026600%
Hawk Construction, TxDOT: bids and low bids by year of letting

Pay items where it is most often lowest

Pay itemCodeUnitLines bidLowest on the lineIts median priceAll bidders' median
Removing concrete (curb)104-7016LF63 (50%)$10.00$10.00
Concrete structure repair (standard)429-7009SF63 (50%)$277.50$210.00
Biodegradable erosion control logs (remove)506-7046LF112 (18%)$5.00$1.40
Biodegradable erosion control logs (install) (8")506-7043LF82 (25%)$8.50$6.00
Concrete structure repair (vertical & overhead)429-7007SF62 (33%)$372.50$220.00
Barricades, signs and traffic handling502-7001MO131 (8%)$15,000$5,000.00
Portable changeable message sign503-7001DAY121 (8%)$160.00$100.00
Temporary sediment control fence (install)506-7039LF61 (17%)$5.50$4.00
Concrete structure repair(rapid deck rep(PRT DPT)429-7004SF61 (17%)$282.50$175.00
Concrete structure repair(rapid deck rep(full DPT))429-7006SF51 (20%)$300.00$250.00
Hawk Construction, TxDOT: pay items where its unit price was the lowest on the line

A line counts when the firm priced it and at least one other bidder did too; the lowest unit price on the line counts whoever won the contract. Token prices and bids over three times the low bid are left out.

Who it meets most

Hawk Construction, TxDOT: the firms on the same contracts most often

Latest bids

LetContractDistrictProjectRankIts bidAgainst the low bid
05 AUG 2026A00222908El Paso DistrictFULL DEPTH CONCRETE REPAIR, IH0110 (VARIOUS LOCATIONS to VARIOUS LOCATIONS)5 of 6$2,555,000+44%
02 JUN 2026A00188372El Paso DistrictBridge Maintenance, Various (DISTRICTWIDE (BRIDGE MAINTENANCE) to .)3 of 6$1,075,146+32%
07 MAY 2026A00193351El Paso DistrictHazard Elimination & Safety, BU 54A (HONDO PASS DR to RUTHERFORD DR)3 of 3$3,319,132+34%
05 MAY 2026A00220065El Paso DistrictFULL DEPTH CONCRETE REPAIR, IH0010 (VARIOUS LOCATIONS to VARIOUS LOCATIONS)3 of 3$2,315,950+40%
08 APR 2026A00212674El Paso DistrictConstruct Pedestrian Infrastructure, FM 76 (DELTA DR to ROSE LN)5 of 6$1,580,000+27%
04 MAR 2026A00218322El Paso DistrictBRIDGE PREVENTATIVE MAINTENANCE, IH0010 (VARIOUS LOCATIONS to VARIOUS LOCATIONS)9 of 10$1,684,407+64%
11 DEC 2025A00217487El Paso DistrictMISCELLANEOUS CONCRETE REPAIR, IH0110 (VARIOUS LOCATIONS to VARIOUS LOCATIONS)3 of 3$879,870+1.0%
09 DEC 2025A00207380El Paso DistrictBRIDGE PREVENTATIVE MAINTENANCE, IH0010 (Various Locations to Various Locations)5 of 7$857,041+54%
03 DEC 2025A00217479El Paso DistrictFULL DEPTH CONCRETE REPAIR, IH0010 (VARIOUS LOCATIONS to VARIOUS LOCATIONS)1 of 3$1,469,600Low, 28% under the second
14 OCT 2025A00215544El Paso DistrictMISCELLANEOUS CONCRETE REPAIR, IH0010 (VARIOUS LOCATIONS to VARIOUS LOCATIONS)3 of 3$1,229,875+42%
06 JUN 202406243234El Paso DistrictIH 10 Landscape development from YARBROUGH DR to FM 659 (ZARAGOZA RD)3 of 6$5,870,149+45%
01 FEB 202402243040El Paso DistrictVA Preventive maintenance from EL PASO COUNTYWIDE3 of 4$474,606+4.0%
01 FEB 202402244018El Paso DistrictIH0010 Flexible pavement structure repair from VARIOUS LOCATIONS to VARIOUS LOCATIONS4 of 4$1,386,470+22%
05 DEC 202312233024El Paso DistrictIH 10 Rehabilitate bridge from 1.03 MI N OF EXECUTIVE CENTER BLVD to 0.93 MI S OF EXECUTIVE ENTER BLVD2 of 3$757,086+5.0%
07 APR 202204223218El Paso DistrictVA Bridge maintenance from DISTRICTWIDE2 of 6$1,177,207+12%
04 MAR 202203223217El Paso DistrictVA Preventive maintenance from COUNTYWIDE10 of 10$716,369+48%
01 JUL 202107213018El Paso DistrictSH 20 Hazard elimination & safety from 0.598 MI N OF SH 178 to 0.753 MI S OF PA 24011 of 6$2,433,661Low, 12% under the second
04 JUN 202106213207El Paso DistrictFM 1281 Hazard elimination & safety from FM 76 to 1.194 MI N OF IH 102 of 3$5,429,082+5.0%
07 MAY 202005203015El Paso DistrictVA Fy 2020 bridge maintenance (el paso county) from COUNTY WIDE5 of 10$3,239,360+26%
Hawk Construction: latest TxDOT bids in the data

How this record was read

TxDOT Bid Tabulations open-data export (data.texas.gov) from September 2024, read 21 November 2026, and TxDOT's legacy Tabulation of Bids pages for January 2020 to August 2024. The legacy pages are a large sample, not every contract: their file names were reused from year to year. Their district is the one TxDOT gives the county. Bids that did not match their published total are left out.

  • Every bid counted here matched its published total to within one dollar; TxDOT's rank decides who was low.
  • The gap to the low bid is the firm's total over the low total, minus one, on contracts it did not win, leaving out bids over three times the low bid.
  • A record covers the lettings in the data, not every contract the firm ever bid. Coverage by year is on the state page.

A name split in two, or a figure that does not match the owner's tabulation? Write to mehdi@miragemetrics.com and we correct it.

Your own bid history, read the same way

Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.

We use your email to reply to you and, now and then, to tell you about Mirage. You can opt out at any time. Privacy policy