TxDOT contract A00212674 bid tabulation
Construct Pedestrian Infrastructure, FM 76 (DELTA DR to ROSE LN). Let by Texas DOT on April 8, 2026, El Paso, El Paso District. 6 bids received; low bid $1,248,951 by Synergy Project Contractors, Inc., -4.5% against the engineer's estimate of $1,307,462.
- Owner
- Texas DOT
- Letting
- 08 APR 2026
- Pay items
- 44
- Data through
- 19 NOV 2026
Bidders
| Rank | Bidder | Total bid | Against the low bid | Against the estimate |
|---|---|---|---|---|
| 1 | Synergy Project Contractors, Inc. | $1,248,951 | Low | -4.0% |
| 2 | Horizone Construction I, LTD | $1,299,000 | +4.0% | -1.0% |
| 3 | El Paso A.R.C. Electric, Inc. | $1,378,915 | +10% | +5.0% |
| 4 | International Eagle Enterprises, Inc. | $1,425,125 | +14% | +9.0% |
| 5 | Hawk Construction | $1,580,000 | +27% | +21% |
| 6 | Icos Management, LLC | $1,737,742 | +39% | +33% |
Engineer's estimate: $1,307,462.
Bid tabulation
| Line | Pay item | Unit | Quantity | Estimate | 1. Synergy Project Contractors, Inc. | 2. Horizone Construction I, LTD | 3. El Paso A.R.C. Electric, Inc. | 4. International Eagle Enterprises, Inc. | 5. Hawk Construction | 6. Icos Management, LLC |
|---|---|---|---|---|---|---|---|---|---|---|
| 1 | Removing concrete (medians) (104-7008) | SY | 4 | $16.00 | $12.15 | $19.91 | $125.00 | $2,500.00 | $430.00 | $428.00 |
| 2 | Removing concrete (driveways) (104-7011) | SY | 4,873 | $17.00 | $13.20 | $15.71 | $20.00 | $45.00 | $36.00 | $16.00 |
| 3 | Removing concrete (sidewalk, ramp or shared use path) (104-7013) | SY | 1,982 | $14.00 | $20.66 | $15.71 | $20.00 | $40.00 | $30.00 | $13.00 |
| 4 | Removing concrete (curb) (104-7016) | LF | 3,285 | $5.00 | $9.72 | $19.34 | $10.00 | $15.00 | $11.00 | $11.00 |
| 5 | Drilled shaft (traffic signal pole) (24 in) (416-7042) | LF | 48 | $425.00 | $243.00 | $357.04 | $450.00 | $286.00 | $345.00 | $321.00 |
| 6 | Adjusting manholes (479-7001) | EACH | 22 | $1,575.00 | $1,093.50 | $685.30 | $1,500.00 | $1,000.00 | $1,700.00 | $1,070.00 |
| 7 | Mobilization (500-7001) | LS | 1 | $115,000 | $48,600 | $46,994 | $30,000 | $75,000 | $48,626 | $57,200 |
| 8 | Barricades, signs and traffic handling (502-7001) | MO | 7 | $11,000 | $6,682.50 | $14,141 | $12,000 | $15,000 | $11,500 | $1.00 |
| 9 | Portable changeable message sign (503-7001) | DAY | 124 | $150.00 | $103.28 | $90.75 | $190.00 | $160.00 | $120.00 | $161.00 |
| 10 | TMA (stationary) (505-7001) | DAY | 124 | $300.00 | $364.50 | $196.64 | $380.00 | $350.00 | $450.00 | $214.00 |
| 11 | Biodegradable erosion control logs (install) (8") (506-7043) | LF | 300 | $5.00 | $10.94 | $11.54 | $10.00 | $18.00 | $10.00 | $2.00 |
| 12 | Biodegradable erosion control logs (remove) (506-7046) | LF | 300 | $1.00 | $4.86 | $3.27 | $2.00 | $1.00 | $5.00 | $1.00 |
| 13 | Colored textured concrete (5") (527-7002) | SY | 24 | $125.00 | $122.72 | $102.29 | $200.00 | $80.00 | $500.00 | $321.00 |
| 14 | Concrete curb (type II) (529-7002) | LF | 2,346 | $15.00 | $32.81 | $25.71 | $20.00 | $18.00 | $27.00 | $54.00 |
| 15 | Driveways (concrete) (530-7006) | SY | 4,843 | $85.00 | $87.48 | $84.06 | $85.00 | $70.00 | $95.00 | $161.00 |
| 16 | Concrete sidewalks (5") (531-7002) | SY | 1,535 | $72.00 | $57.11 | $67.55 | $70.00 | $50.00 | $94.00 | $77.00 |
| 17 | Curb ramps (type 1) (531-7005) | EACH | 10 | $2,800.00 | $2,490.75 | $1,790.29 | $2,500.00 | $1,800.00 | $2,250.00 | $3,210.00 |
| 18 | Curb ramps (type 2) (531-7006) | EACH | 20 | $2,200.00 | $2,430.00 | $1,630.90 | $3,500.00 | $1,800.00 | $2,300.00 | $3,210.00 |
| 19 | Curb ramps (type 7) (531-7010) | EACH | 17 | $2,000.00 | $3,037.50 | $1,740.63 | $3,100.00 | $1,800.00 | $2,100.00 | $3,424.00 |
| 20 | Curb ramps (type 21) (531-7013) | EACH | 10 | $2,800.00 | $2,673.00 | $1,838.19 | $3,400.00 | $2,000.00 | $2,600.00 | $3,745.00 |
| 21 | Concrete median (536-7002) | SY | 13 | $130.00 | $87.48 | $89.78 | $130.00 | $1,000.00 | $500.00 | $321.00 |
| 22 | Conduit (PVC) (schedule 40) (3") (618-7036) | LF | 200 | $30.00 | $27.95 | $29.14 | $30.00 | $23.50 | $28.00 | $32.00 |
| 23 | Conduit (PVC) (schedule 40) (3") (bore) (618-7037) | LF | 175 | $35.00 | $32.81 | $40.23 | $50.00 | $32.25 | $40.00 | $80.00 |
| 24 | Conduit (prepare) (618-7090) | LF | 765 | $5.00 | $2.43 | $3.12 | $5.00 | $2.50 | $3.50 | $4.00 |
| 25 | Electrical conductor (no.8) insulated (620-7008) | LF | 360 | $2.00 | $3.65 | $4.91 | $4.10 | $4.00 | $5.00 | $3.00 |
| 26 | Ground box type A (122311) (624-7001) | EACH | 1 | $1,200.00 | $972.00 | $1,784.90 | $1,200.00 | $1,450.00 | $1,800.00 | $1,391.00 |
| 27 | Ground box type D (162922)W/apron (624-7008) | EACH | 1 | $1,700.00 | $1,579.50 | $2,710.06 | $2,100.00 | $2,175.00 | $2,650.00 | $1,605.00 |
| 28 | Remove ground box (624-7013) | EACH | 1 | $500.00 | $364.50 | $1,589.93 | $400.00 | $1,275.00 | $1,600.00 | $910.00 |
| 29 | Relocate SM RD SN sup&AM type 10BWG (644-7065) | EACH | 12 | $700.00 | $668.25 | $1,823.33 | $500.00 | $1,500.00 | $1,800.00 | $1,284.00 |
| 30 | Reflectorized pavement marking type I (W)24"(solid)(100MIL) (666-7036) | LF | 2,390 | $11.00 | $12.15 | $13.75 | $13.00 | $13.00 | $13.50 | $12.00 |
| 31 | Reflectorized pavement marking type II (W) 24" (solid) (666-7184) | LF | 2,390 | $5.00 | $6.08 | $6.88 | $8.00 | $7.00 | $7.00 | $6.00 |
| 32 | Eliminating existing PM & markers (6") (677-7002) | LF | 181 | $1.80 | $2.73 | $3.09 | $3.25 | $5.00 | $3.00 | $3.00 |
| 33 | Eliminating existing PM & markers (24") (677-7008) | LF | 1,293 | $2.00 | $8.51 | $9.63 | $9.00 | $10.00 | $10.00 | $8.00 |
| 34 | Pavement surface preparation for marking (24") (678-7008) | LF | 2,390 | $2.00 | $2.43 | $2.75 | $4.00 | $3.50 | $2.65 | $3.00 |
| 35 | Install highway traffic signal (upgrade) (680-7011) | EACH | 1 | $19,000 | $9,112.50 | $35,123 | $45,000 | $28,000 | $33,650 | $41,730 |
| 36 | Pedestrian signal section (LED)(countdown) (682-7018) | EACH | 10 | $1,000.00 | $1,093.50 | $2,078.08 | $1,200.00 | $1,675.00 | $2,000.00 | $1,070.00 |
| 37 | Traffic signal CBL (type A)(14 AWG)(5 conductor) (684-7031) | LF | 1,690 | $3.75 | $4.86 | $4.48 | $4.00 | $3.75 | $5.00 | $4.00 |
| 38 | Traffic signal CBL (type C)(14 AWG)(2 conductor) (684-7080) | LF | 2,040 | $6.00 | $3.65 | $2.96 | $2.10 | $2.50 | $3.00 | $3.00 |
| 39 | Pedestrian pole assembly (687-7001) | EACH | 7 | $2,500.00 | $2,794.50 | $2,139.95 | $3,000.00 | $1,720.00 | $2,050.00 | $2,996.00 |
| 40 | Relocate pedestrian pole assembly (687-7003) | EACH | 1 | $6,000.00 | $4,617.00 | $979.74 | $2,500.00 | $785.00 | $950.00 | $2,996.00 |
| 41 | Relocate pedestrian push button post assem (687-7004) | EACH | 1 | $10,000 | $4,252.50 | $532.84 | $500.00 | $430.00 | $525.00 | $2,996.00 |
| 42 | Pedestrian detect push button (APS) (688-7001) | EACH | 8 | $1,400.00 | $729.00 | $1,675.87 | $900.00 | $1,340.00 | $1,600.00 | $1,391.00 |
| 43 | Pedestrian detector controller unit (688-7003) | EACH | 2 | $4,100.00 | $3,796.88 | $6,961.30 | $4,000.00 | $5,575.00 | $6,700.00 | $5,778.00 |
| 44 | Ground box (prepare) (6013-7006) | EACH | 8 | $600.00 | $1,215.00 | $1,123.14 | $300.00 | $900.00 | $1,100.00 | $535.00 |
The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.
Source
Read from TxDOT's tabulation for this contract. TxDOT Bid Tabulations open-data export (data.texas.gov) from September 2024, read 21 November 2026, and TxDOT's legacy Tabulation of Bids pages for January 2020 to August 2024. The legacy pages are a large sample, not every contract: their file names were reused from year to year. Their district is the one TxDOT gives the county. Bids that did not match their published total are left out.
Every contract let that day: TxDOT letting of April 8, 2026. Compiled by Mirage Metrics.