TxDOT contract A00215737 bid tabulation
Install/Replace Signs, IH 45 (Various Locations Districtwide to .). Let by Texas DOT on March 4, 2026, Harris, Houston District. 12 bids received; low bid $2,725,853 by Elite Kings Construction, LLC, -26% against the engineer's estimate of $3,696,283.
- Owner
- Texas DOT
- Letting
- 04 MAR 2026
- Pay items
- 20
- Data through
- 19 NOV 2026
Bidders
| Rank | Bidder | Total bid | Against the low bid | Against the estimate |
|---|---|---|---|---|
| 1 | Elite Kings Construction, LLC | $2,725,853 | Low | -26% |
| 2 | Rhino Equity, LLC | $2,910,019 | +7.0% | -21% |
| 3 | Creacom, Inc. | $2,960,188 | +9.0% | -20% |
| 4 | Vaca Underground Utilities Inc | $3,033,674 | +11% | -18% |
| 5 | Hazmat International, Inc. | $3,140,787 | +15% | -15% |
| 6 | Third Coast Services LLC | $3,326,213 | +22% | -10% |
| 7 | Odum Services, LLC | $3,345,213 | +23% | -9.0% |
| 8 | Professional Traffic Control LLC | $3,347,861 | +23% | -9.0% |
| 9 | Highway Intelligent Traffic Solutions, Inc. | $3,368,784 | +24% | -9.0% |
| 10 | Creative Design Concepts, Inc. | $3,456,789 | +27% | -6.0% |
| 11 | Select Maintenance, L.L.C. | $3,638,659 | +33% | -2.0% |
| 12 | The Levy Company, Inc. | $4,430,834 | +63% | +20% |
Engineer's estimate: $3,696,283.
Bid tabulation
| Line | Pay item | Unit | Quantity | Estimate | 1. Elite Kings Construction, LLC | 2. Rhino Equity, LLC | 3. Creacom, Inc. | 4. Vaca Underground Utilities Inc | 5. Hazmat International, Inc. | 6. Third Coast Services LLC |
|---|---|---|---|---|---|---|---|---|---|---|
| 1 | Drilled shaft (sign mounts) (24 in) (416-7028) | LF | 169 | $280.00 | $100.00 | $400.00 | $217.16 | $200.00 | $150.00 | $137.48 |
| 2 | Riprap (concrete)(CL B) (432-7005) | CY | 4 | $1,200.00 | $10.00 | $700.00 | $1,497.87 | $1,000.00 | $450.00 | $823.55 |
| 3 | Mobilization (500-7001) | LS | 1 | $299,662 | $500,000 | $100,000 | $207,207 | $300,000 | $250,000 | $332,621 |
| 4 | Barricades, signs and traffic handling (502-7001) | MO | 4 | $100,000 | $1,000.00 | $50,000 | $132,702 | $5,000.00 | $25,000 | $85,247 |
| 5 | Portable changeable message sign (503-7002) | EACH | 24 | $7,500.00 | $200.00 | $2,000.00 | $220.16 | $100.00 | $250.00 | $303.83 |
| 6 | TMA (stationary) (505-7001) | DAY | 900 | $160.00 | $250.00 | $200.00 | $166.94 | $65.00 | $300.00 | $362.84 |
| 7 | Aluminum signs (type G) (636-7002) | SF | 815 | $62.50 | $26.00 | $50.00 | $40.79 | $30.00 | $35.00 | $30.09 |
| 8 | Aluminum signs (type O) (636-7003) | SF | 137 | $56.50 | $22.00 | $60.00 | $38.90 | $30.00 | $45.00 | $25.89 |
| 9 | Replace existing aluminum signs(type A) (636-7004) | SF | 1,212 | $39.35 | $16.00 | $40.00 | $36.35 | $22.00 | $35.00 | $26.81 |
| 10 | Replace existing aluminum signs(type G) (636-7005) | SF | 2,638 | $40.00 | $23.00 | $55.00 | $46.39 | $30.00 | $40.00 | $28.91 |
| 11 | Replace existing aluminum signs(type O) (636-7006) | SF | 63,185 | $35.00 | $22.00 | $29.00 | $24.78 | $35.00 | $32.00 | $28.99 |
| 12 | Install small roadside sign support and assembly type 10BWG(2)SA(P) (644-7017) | EACH | 8 | $1,250.00 | $690.00 | $2,100.00 | $1,910.86 | $1,500.00 | $1,200.00 | $1,619.61 |
| 13 | Install small roadside sign support and assembly TYS80(1)SA(U) (644-7031) | EACH | 1 | $1,200.00 | $290.00 | $1,500.00 | $1,142.92 | $1,200.00 | $1,100.00 | $1,385.28 |
| 14 | Install small roadside sign support and assembly TYS80(1)SB(U) (644-7042) | EACH | 2 | $1,360.00 | $194.00 | $1,500.00 | $1,128.80 | $1,200.00 | $850.00 | $1,194.96 |
| 15 | In bridge MNT clearance sign assembly(type N) (644-7061) | EACH | 7 | $1,500.00 | $185.00 | $3,000.00 | $2,614.54 | $2,500.00 | $2,500.00 | $2,384.07 |
| 16 | In bridge MNT clearance sign assembly(type S) (644-7062) | EACH | 14 | $1,500.00 | $185.00 | $3,000.00 | $2,691.60 | $2,500.00 | $2,650.00 | $2,475.88 |
| 17 | Install LRSS (struct steel) (647-7001) | LB | 7,069 | $14.00 | $10.00 | $6.00 | $5.43 | $15.00 | $8.50 | $21.98 |
| 18 | Remove overhd sign sup (650-7193) | EACH | 1 | $9,500.00 | $100,000 | $30,000 | $4,783.73 | $15,000 | $10,000 | $3,080.20 |
| 19 | Install object marker assembly (OM-2Y)(WC)GND (658-7056) | EACH | 100 | $12.50 | $200.00 | $100.00 | $189.01 | $100.00 | $60.00 | $38.58 |
| 20 | Install vandalism protection panels (6154-7001) | SF | 2,800 | $15.00 | $100.00 | $25.00 | $41.60 | $25.00 | $50.00 | $33.31 |
The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.
Source
Read from TxDOT's tabulation for this contract. TxDOT Bid Tabulations open-data export (data.texas.gov) from September 2024, read 21 November 2026, and TxDOT's legacy Tabulation of Bids pages for January 2020 to August 2024. The legacy pages are a large sample, not every contract: their file names were reused from year to year. Their district is the one TxDOT gives the county. Bids that did not match their published total are left out.
Every contract let that day: TxDOT letting of March 4, 2026. Compiled by Mirage Metrics.
Your own bid history, read the same way
Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.