TxDOT contract A00214597 bid tabulation

Widen Road - Add Shoulders, RM 473 (FM 1376 to FM 474). Let by Texas DOT on May 6, 2026, Kendall, San Antonio District. 7 bids received; low bid $4,095,968 by STX Civil, +0.6% against the engineer's estimate of $4,070,599.

Owner
Texas DOT
Letting
06 MAY 2026
Pay items
100
Data through
19 NOV 2026

Bidders

RankBidderTotal bidAgainst the low bidAgainst the estimate
1STX Civil$4,095,968Low+1.0%
2Joe Bland Construction LLC$4,244,814+4.0%+4.0%
3Acme Bridge Company, Inc.$4,250,503+4.0%+4.0%
4J. Carroll Weaver, Inc.$4,427,015+8.0%+9.0%
5Hunter Industries, LTD.$4,724,932+15%+16%
6Clark Construction of Texas, Inc.$4,728,410+15%+16%
7Dean Word Company, LTD.$6,085,396+49%+49%
TxDOT contract A00214597: bids by rank

Engineer's estimate: $4,070,599.

Bid tabulation

LinePay itemUnitQuantityEstimate1. STX Civil2. Joe Bland Construction LLC3. Acme Bridge Company, Inc.4. J. Carroll Weaver, Inc.5. Hunter Industries, LTD.6. Clark Construction of Texas, Inc.
1Preparing row (100-7002)STA315.35$1,620.00$341.93$750.00$641.00$174.73$742.50$509.45
2Removing concrete (pavement) (104-7001)SY321$12.17$31.96$35.00$21.00$15.95$22.00$60.00
3Removing concrete (riprap) (104-7006)SY808$14.74$22.79$30.00$15.80$12.67$19.80$35.00
4Removing concrete (flume) (104-7041)SY138$36.00$21.28$40.00$22.90$18.55$19.80$45.00
5Remove (2"-6") TRT/untrt base & asphalt pavement (105-7002)SY4,255$7.39$2.48$4.00$15.40$4.15$4.65$4.25
6Remove (5"-9") TRT/untrt base & asphalt pavement (105-7005)SY22,456$5.91$2.42$5.00$4.90$4.15$5.88$9.55
7Excavation (roadway) (110-7001)CY14,005$14.22$18.91$15.00$15.50$12.31$49.50$19.57
8Embankment (final)(DC)(type C1) (132-7008)CY1,376$25.54$63.85$55.00$12.50$27.71$34.77$53.96
9Blading (150-7001)STA315.35$167.49$56.44$150.00$37.30$117.61$319.00$63.50
10Compost manuf topsoil (4") (161-7002)SY54,882$1.25$2.47$2.00$2.38$8.55$2.09$1.99
11Drill seed (permanent_rural_clay) (164-7010)SY54,882$0.26$0.25$0.50$0.33$0.22$0.21$0.20
12Bonded fiber MTRX seed (temporary)(warm) (164-7074)SY27,444$0.55$0.93$1.50$1.30$0.83$0.79$0.75
13Bonded fiber MTRX seed (temporary)(cool) (164-7075)SY27,444$0.55$0.93$1.50$1.30$0.83$0.79$0.75
14Vegetative watering (168-7001)TGL1,707.82$24.21$54.32$35.00$54.90$36.63$26.40$52.75
15Soil ret BLKT(SL_mod_clay_long_roll) (169-7010)SY46,860$3.03$2.48$1.50$1.25$2.22$2.10$2.00
16Soil ret BLKT(SL_steep_clay_long_roll) (169-7014)SY8,022$3.03$3.11$1.75$1.60$2.78$2.62$2.50
17Proof rolling (216-7001)HR87$172.00$140.24$575.00$92.40$47.40$121.00$65.00
18FL BS (compacted in place)(tyd GR1-2)(final pos) (247-7188)CY7,552$71.38$70.56$75.00$87.75$74.31$81.09$123.82
19Asphalt (RC-250) (316-7016)GAL10,159$6.08$7.39$6.00$6.30$5.09$7.15$14.85
20Asphalt (AC-15P, AC-20-5TR or AC-20XP) (316-7071)GAL30,602$3.82$7.39$5.00$5.10$4.74$5.50$4.45
21Aggregate (type-B, GR-5)(sac-A) (316-7101)CY278$125.00$242.40$245.00$339.00$455.96$230.88$471.30
22Aggregate (type-PD, GR-4)(sac-B) (316-7224)CY851$98.97$189.18$190.00$132.00$131.52$154.40$160.25
23Cut & restoring pavement (400-7006)SY146$211.68$376.12$180.00$423.00$183.15$304.35$262.63
24Flowable backfill (401-7001)CY8$318.00$208.83$500.00$248.00$508.48$463.40$450.00
25Temporary special shoring (403-7001)SF1,623$18.25$21.12$60.00$26.40$44.40$49.96$35.00
26Riprap (concrete)(4 in) (432-7001)CY216$590.00$630.58$550.00$529.00$943.50$758.48$850.00
27Riprap (mow strip)(4 in) (432-7013)CY67$610.22$659.13$800.00$793.00$943.50$818.44$805.00
28Gabion mattresses (galvanized)(12 in) (459-7007)SY121$69.88$167.70$295.00$97.90$142.08$141.74$135.00
29Gabion mattresses (galvanized) (24 in) (459-7009)SY12$150.00$223.60$375.00$232.00$205.35$188.99$180.00
30CMP AR (gal steel des 3) (460-7018)LF16$120.00$93.84$345.00$233.00$339.47$242.25$300.00
31CMP AR (gal steel des 5) (460-7020)LF11$300.00$157.79$525.00$248.00$499.50$374.97$450.00
32RC pipe (CL III)(18 in) (464-7003)LF14$83.44$83.48$335.00$122.00$72.15$195.96$65.00
33RC pipe (CL III)(24 in) (464-7005)LF80$122.18$106.09$355.00$153.00$166.50$207.44$150.00
34RC pipe (CL III)(36 in) (464-7009)LF28$197.20$197.26$415.00$301.00$333.00$339.92$300.00
35Set (type II) (18 in) (RCP) (3: 1) (C) (467-7305)EACH1$1,200.00$1,961.33$2,750.00$3,220.00$943.50$2,722.55$850.00
36Set (type II) (18 in) (RCP) (4: 1) (C) (467-7306)EACH1$1,358.04$2,049.11$2,500.00$3,220.00$999.00$2,847.73$900.00
37Set (type II) (24 in) (RCP) (3: 1) (C) (467-7325)EACH2$1,491.62$2,205.86$3,250.00$2,110.00$2,220.00$2,895.79$2,000.00
38Set (type II) (24 in) (RCP) (4: 1) (C) (467-7326)EACH7$2,459.00$2,687.77$3,500.00$3,170.00$2,497.50$3,285.12$2,250.00
39Set (type II) (24 in) (RCP) (6: 1) (C) (467-7327)EACH3$1,778.24$2,918.34$4,250.00$3,600.00$2,775.00$3,684.85$2,500.00
40Set (type II) (36 in) (RCP) (4: 1) (C) (467-7366)EACH4$3,172.73$5,385.88$7,500.00$8,640.00$4,440.00$5,244.81$4,000.00
41Set (type II) (des 3) (CMP) (4: 1) (C) (467-7428)EACH1$3,500.00$2,443.29$8,000.00$2,640.00$2,824.88$3,440.17$2,500.00
42Set (type II) (des 3) (CMP) (6: 1) (C) (467-7429)EACH1$6,000.00$2,689.04$9,500.00$2,780.00$3,885.00$4,094.42$3,500.00
43Set (type II) (des 5) (CMP) (4: 1) (C) (467-7444)EACH2$6,500.00$4,872.43$10,250$3,280.00$4,995.00$5,720.90$4,500.00
44Clean existing culverts (480-7001)EACH5$2,807.40$3,450.37$1,500.00$3,170.00$2,220.00$3,095.33$2,000.00
45Mobilization (500-7001)LS1$358,000$315,624$275,000$385,000$444,451$321,578$361,700
46Barricades, signs and traffic handling (502-7001)MO13$10,000$1,595.80$7,750.00$8,000.00$7,215.00$3,458.87$4,580.00
47Portable changeable message sign (503-7001)DAY400$70.90$23.37$50.00$66.30$22.20$68.19$100.00
48TMA (stationary) (505-7001)DAY20$283.90$153.56$225.00$137.00$564.98$170.49$350.00
49TMA (mobile operation) (505-7002)HR144$89.10$44.67$115.00$114.00$50.85$85.24$57.48
50Rock filter dams (install) (type 2) (506-7002)LF1,871$40.27$55.90$45.00$42.30$47.73$45.15$43.00
51Rock filter dams (install) (type 3) (506-7003)LF990$70.90$99.38$105.00$1.00$87.69$82.95$79.00
52Rock filter dams (remove) (506-7011)LF2,861$12.81$12.42$30.00$37.00$12.21$11.55$11.00
53Construction exits (install) (type 1) (506-7020)SY224$22.33$37.27$40.00$30.10$44.40$42.00$40.00
54Construction exits (remove) (506-7024)SY224$8.91$9.94$15.00$19.00$15.54$14.70$14.00
55Temporary sediment control fence (install) (506-7039)LF41,840$3.50$4.22$4.75$4.45$4.44$4.20$4.00
56Temporary sediment control fence (remove) (506-7041)LF41,840$0.92$1.06$1.00$1.20$1.11$1.05$1.00
57Biodegradable erosion control logs (install) (18") (506-7045)LF1,140$8.24$8.07$8.00$6.90$7.77$7.35$7.00
58Biodegradable erosion control logs (remove) (506-7046)LF1,140$1.76$0.93$2.00$1.25$1.11$1.57$1.50
59One-way traffic control (flagger cont) (510-7001)HR160$89.90$149.98$150.00$189.00$86.48$154.00$150.00
60Driveways (concrete) (530-7006)SY329$106.20$120.78$175.00$153.00$277.50$166.32$250.00
61Driveways (surface treat) (530-7016)SY5,074$33.45$43.00$10.00$39.40$27.75$35.20$21.00
62Turnouts (surface treat) (530-7019)SY451$59.60$47.00$10.00$45.00$27.75$35.20$77.95
63Metal W-beam guard fence (timber post) (540-7001)LF1,025$27.33$34.16$40.00$24.90$32.47$24.67$29.25
64Guardrail end treatment (install) (544-7001)EACH4$3,238.18$3,849.11$4,500.00$3,440.00$3,901.65$3,412.33$3,515.00
65Mailbox install-S (TWW-post) type 4 (560-7008)EACH25$490.42$310.56$295.00$264.00$321.90$320.23$290.00
66Mailbox install-D (TWW-post) type 4 (560-7009)EACH3$369.78$341.62$315.00$291.00$361.86$320.23$325.00
67Mailbox install-M (TWW-post) type 4 (560-7010)EACH3$730.58$683.23$625.00$582.00$943.50$713.96$850.00
68Install small roadside sign support and assembly type 10BWG(1)SA(P) (644-7001)EACH33$750.60$745.34$695.00$634.00$749.25$771.71$675.00
69Install small roadside sign support and assembly type 10BWG(1)SA(P-BM) (644-7002)EACH2$811.67$869.56$800.00$740.00$871.35$859.91$785.00
70Install small roadside sign support and assembly type 10BWG(1)SA(T) (644-7004)EACH37$793.67$776.40$725.00$661.00$943.50$818.96$850.00
71Install small roadside sign support and assembly type 10BWG(1)SA(U) (644-7007)EACH1$1,063.12$869.57$800.00$740.00$1,193.25$1,102.45$1,075.00
72Install small roadside sign support and assembly tyfrp(1)UA(P) (644-7021)EACH6$450.00$776.40$725.00$661.00$832.50$509.23$750.00
73Install small roadside sign support and assembly TYS80(1)SA(U) (644-7031)EACH2$1,238.39$1,086.96$1,000.00$925.00$1,393.05$1,307.19$1,255.00
74Install small roadside sign support and assembly TYS80(1)SA(U-BM) (644-7034)EACH5$1,437.64$1,180.12$1,000.00$1,000.00$1,526.25$1,448.93$1,375.00
75Remove SM RD SN sup&AM (644-7073)EACH67$121.00$93.17$90.00$79.30$122.10$157.49$110.00
76Install object marker assembly (OM-2Z)(WFLX)GND(BI) (658-7059)EACH36$89.68$167.70$155.00$143.00$72.15$110.24$65.00
77Remove delin & object marker assms (658-7078)EACH30$40.21$6.21$6.00$5.30$20.54$19.42$18.50
78Install OM SM RD sign (1-OM-PW)Y (658-7317)EACH72$11.20$62.11$60.00$52.90$38.85$34.12$35.00
79Install OM SM RD sign (1-OM-PW)R (658-7318)EACH8$10.00$62.11$60.00$52.90$38.85$34.12$35.00
80Work zone pavement marking non-removing (W)6"(solid) (662-7008)LF55,392$0.24$0.31$0.30$0.28$0.44$0.26$0.25
81Work zone pavement marking SHT terminal (tab)type Y-2 (662-7114)EACH3,153$0.35$0.01$1.25$1.60$1.11$1.72$2.00
82Reflectorized pavement marking type I (W)8"(solid)(100MIL) (666-7024)LF986$0.94$1.24$1.25$1.35$1.22$1.26$1.25
83Reflectorized pavement marking type I (W)24"(solid)(100MIL) (666-7036)LF148$6.91$6.21$6.00$17.70$8.88$16.80$8.00
84Reflectorized pavement marking type I (W)(arrow)(100MIL) (666-7042)EACH6$140.32$155.28$145.00$238.00$177.60$225.74$125.00
85Reflectorized pavement marking type I (W)(word)(100MIL) (666-7066)EACH6$163.49$186.34$175.00$349.00$216.45$330.73$150.00
86Ref pavement marking type I(W)36"(yld tri)(100MIL) (666-7090)EACH12$53.15$31.06$30.00$83.20$66.60$78.75$25.00
87Reflectorized pavement marking type I(Y)(med nose)(100MIL) (666-7132)EACH2$259.77$372.68$345.00$665.00$277.50$629.97$450.00
88Reflectorized profile pavement marking type I(W)6"(solid)(100MIL) (666-7266)LF63,696$0.66$0.96$1.00$0.86$1.00$0.82$0.95
89Reflectorized profile pavement marking type I(Y)6"(solid)(100MIL) (666-7270)LF65,810$0.70$0.96$1.00$0.86$1.00$0.82$0.95
90Pavement sler 6" (666-7347)LF129,506$0.17$0.22$0.25$0.20$0.24$0.19$0.25
91Pavement sler 8" (666-7348)LF986$0.31$0.31$0.30$0.55$0.44$0.52$0.30
92Pavement sler 24" (666-7352)LF148$1.52$3.73$3.50$4.70$3.11$4.46$4.00
93Pavement sler (arrow) (666-7353)EACH6$54.40$124.23$115.00$66.50$96.57$63.00$75.00
94Pavement sler (word) (666-7354)EACH6$54.10$124.23$115.00$77.60$111.00$73.50$85.00
95Pavement sler (med nose) (666-7355)EACH2$52.37$186.34$175.00$99.80$133.20$94.50$225.00
96Pavement sler (yld tri) (666-7365)EACH12$32.00$18.63$20.00$20.00$37.74$18.90$15.00
97Reflectorized pavement marker type I-C (672-7002)EACH51$3.45$3.73$5.00$11.10$5.55$10.50$5.00
98Reflectorized pavement marker type II-A-A (672-7004)EACH1,117$3.50$3.73$5.00$6.70$5.55$6.30$5.00
99Reloct RDSD FLSH BCN AM (solar PWRD) (685-7005)EACH1$4,000.00$9,316.78$12,500$7,400.00$13,320$7,349.64$7,000.00
100Residential driveway temporary signal system (6089-7001)MO13$10,000$10,157$8,500.00$8,650.00$8,880.00$10,061$9,000.00
TxDOT contract A00214597: unit prices by line, the 6 lowest bidders (all in the CSV)

The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.

Source

Read from TxDOT's tabulation for this contract. TxDOT Bid Tabulations open-data export (data.texas.gov) from September 2024, read 21 November 2026, and TxDOT's legacy Tabulation of Bids pages for January 2020 to August 2024. The legacy pages are a large sample, not every contract: their file names were reused from year to year. Their district is the one TxDOT gives the county. Bids that did not match their published total are left out.

Every contract let that day: TxDOT letting of May 6, 2026. Compiled by Mirage Metrics.

Your own bid history, read the same way

Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.

We use your email to reply to you and, now and then, to tell you about Mirage. You can opt out at any time. Privacy policy