TxDOT contract A00206784 bid tabulation

Hazard Elimination & Safety, US 181 (At Shannon Ridge Drive to .). Let by Texas DOT on December 3, 2025, Wilson, San Antonio District. 4 bids received; low bid $184,258 by Hunter Industries, LTD., +13% against the engineer's estimate of $163,512.

Owner
Texas DOT
Letting
03 DEC 2025
Pay items
57
Data through
19 NOV 2026

Bidders

RankBidderTotal bidAgainst the low bidAgainst the estimate
1Hunter Industries, LTD.$184,258Low+13%
2CK Newberry, LLC$247,421+34%+51%
3Dean Word Company, LTD.$257,701+40%+58%
4Salinas Construction Technologies, LTD.$288,000+56%+76%
TxDOT contract A00206784: bids by rank

Engineer's estimate: $163,512.

Bid tabulation

LinePay itemUnitQuantityEstimate1. Hunter Industries, LTD.2. CK Newberry, LLC3. Dean Word Company, LTD.4. Salinas Construction Technologies, LTD.
1Remove (10") TRT/untrt base & asphalt pavement (105-7030)SY366$11.00$11.00$30.00$12.50$31.34
2Excavation (roadway) (110-7001)CY135$17.00$41.80$60.00$58.00$43.89
3Embankment (final)(DC)(type C1) (132-7008)CY259$16.00$91.10$30.00$28.75$32.50
4Furn & place topsoil (4") (160-7002)SY1,691$2.00$1.32$4.00$9.75$6.99
5Roll sodding (162-7008)SY1,691$4.00$4.77$7.00$7.00$7.14
6Vegetative watering (168-7001)TGL26.38$6.00$36.28$70.00$81.00$115.32
7Soil ret BLKT(SL_mod_sand_short_roll) (169-7011)SY1,691$2.10$2.52$3.00$2.25$2.30
8Proof rolling (216-7001)HR8$85.00$77.00$100.00$121.25$75.60
9D-GR HMA type-B PG64-22 (exempt) (341-7003)TON567$100.00$88.00$125.00$103.50$135.16
10SP mixes SP-C sac-B PG76-22 (exempt) (344-7039)TON145$180.00$123.20$245.00$173.25$186.27
11Planing asphalt concrete pavement(0" to 2") (354-7032)SY93$2.00$12.31$40.00$15.00$58.30
12Clean existing culverts (480-7001)EACH1$2,600.00$1,000.00$5,000.00$3,542.50$3,597.64
13Mobilization (500-7001)LS1$14,590$18,151$15,000$42,500$59,768
14Barricades, signs and traffic handling (502-7001)MO2$3,000.00$2,500.00$10,000$9,174.25$2,900.02
15Portable changeable message sign (503-7001)DAY54$100.00$80.92$75.00$220.25$113.83
16TMA (stationary) (505-7001)DAY16$200.00$161.84$400.00$595.25$295.87
17TMA (mobile operation) (505-7003)DAY1$240.00$377.62$800.00$1,041.75$595.96
18Rock filter dams (install) (type 2) (506-7002)LF78$40.00$40.84$50.00$51.25$46.37
19Rock filter dams (remove) (506-7011)LF78$14.00$15.74$10.00$7.75$7.79
20Construction exits (install) (type 1) (506-7020)SY112$28.00$28.96$20.00$30.75$28.05
21Construction exits (remove) (506-7024)SY112$9.00$14.85$5.00$7.75$7.43
22Temporary sediment control fence (install) (506-7039)LF834$4.00$3.70$4.00$4.00$3.63
23Temporary sediment control fence (remove) (506-7041)LF834$1.00$1.28$0.50$1.00$0.99
24Biodegradable erosion control logs (install) (8") (506-7043)LF70$4.00$6.33$8.00$5.00$5.56
25Biodegradable erosion control logs (remove) (506-7046)LF70$1.00$2.09$1.00$1.00$2.20
26Mill rumble strips (asphalt) (shoulder) (533-7001)LF821$0.25$11.45$10.00$4.00$8.77
27Relocate SM RD SN sup&AM type 10BWG (644-7065)EACH1$550.00$350.00$2,500.00$784.00$559.26
28Reflectorized pavement marking type I (W)8"(DOT)(100MIL) (666-7018)LF39$1.50$2.63$2.50$3.25$5.12
29Reflectorized pavement marking type I (W)8"(solid)(100MIL) (666-7024)LF670$1.50$2.36$2.25$3.00$2.61
30Reflectorized pavement marking type I (W)24"(solid)(100MIL) (666-7036)LF12$8.00$15.75$15.00$19.25$24.21
31Reflectorized pavement marking type I (W)(arrow)(100MIL) (666-7042)EACH3$175.00$262.51$250.00$320.50$305.85
32Reflectorized pavement marking type I (W)(word)(100MIL) (666-7066)EACH3$200.00$288.76$275.00$352.75$333.35
33Reflectorized pavement marking type II (W) 8" (DOT) (666-7177)LF39$0.50$0.58$0.55$0.75$2.98
34Reflectorized pavement marking type II (W) 8" (solid) (666-7179)LF670$5.00$0.53$0.50$0.75$0.69
35Reflectorized pavement marking type II (W) 24" (solid) (666-7184)LF12$5.00$2.10$2.00$2.50$9.91
36Reflectorized pavement marking type II (W) (arrow) (666-7186)EACH3$95.00$68.25$65.00$83.25$102.35
37Reflectorized pavement marking type II (W) (word) (666-7194)EACH3$100.00$78.75$75.00$96.25$113.35
38Reflectorized pavement marking type II (Y) 6" (solid) (666-7213)LF821$0.20$0.47$0.45$0.50$0.61
39Pavement sler 6" (666-7347)LF821$0.20$0.47$0.45$0.50$0.61
40Pavement sler 8" (666-7348)LF709$0.30$0.53$0.50$0.75$0.68
41Pavement sler 24" (666-7352)LF12$1.50$2.10$2.00$2.50$9.91
42Pavement sler (arrow) (666-7353)EACH3$30.00$68.25$65.00$83.25$102.35
43Pavement sler (word) (666-7354)EACH3$35.00$78.75$75.00$96.25$113.35
44Reflectorized pavement marking type I (Y)6"(solid)(100MIL) (666-7423)LF821$0.50$1.84$1.75$2.25$2.04
45Reflectorized pavement marker type II-C-R (672-7006)EACH34$4.00$21.00$20.00$25.75$24.72
46Eliminating existing PM & markers (8") (677-7004)LF66$0.75$1.05$1.00$1.25$2.50
47Eliminating existing PM & markers (24") (677-7008)LF12$3.00$2.10$2.00$2.50$9.91
48Eliminating existing PM & markers (arrow) (677-7009)EACH1$55.00$68.25$65.00$83.25$175.06
49Eliminating existing PM & markers (word) (677-7015)EACH1$55.00$78.75$75.00$96.25$164.06
50Pavement surface preparation for marking (6") (678-7002)LF821$0.10$0.26$0.25$0.25$0.39
51Pavement surface preparation for marking (8") (678-7004)LF682$0.15$0.37$0.35$0.50$0.52
52Pavement surface preparation for marking (24") (678-7008)LF12$0.75$1.05$1.00$1.25$8.81
53Pavement surface preparation for marking (arrow) (678-7009)EACH3$20.00$15.75$15.00$19.25$47.35
54Pavement surface preparation for marking (word) (678-7016)EACH3$20.00$21.00$20.00$25.75$52.85
55Pavement surface preparation for marking (RPM) (678-7033)EACH682$0.50$0.16$0.15$0.25$0.30
56Underseal course (3006-7001)GAL252$4.00$3.85$4.00$4.25$19.72
57Bonding course (3007-7001)GAL148$2.75$3.63$4.00$4.25$23.98
TxDOT contract A00206784: unit prices by line

The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.

Source

Read from TxDOT's tabulation for this contract. TxDOT Bid Tabulations open-data export (data.texas.gov) from September 2024, read 21 November 2026, and TxDOT's legacy Tabulation of Bids pages for January 2020 to August 2024. The legacy pages are a large sample, not every contract: their file names were reused from year to year. Their district is the one TxDOT gives the county. Bids that did not match their published total are left out.

Every contract let that day: TxDOT letting of December 3, 2025. Compiled by Mirage Metrics.

Your own bid history, read the same way

Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.

We use your email to reply to you and, now and then, to tell you about Mirage. You can opt out at any time. Privacy policy