Hazard Elimination & Safety, US 181 (At Shannon Ridge Drive to .). Let by Texas DOT on December 3, 2025, Wilson, San Antonio District. 4 bids received; low bid $184,258 by Hunter Industries, LTD., +13% against the engineer's estimate of $163,512.
- Owner
- Texas DOT
- Letting
- 03 DEC 2025
- Pay items
- 57
- Data through
- 19 NOV 2026
Bidders
| Rank | Bidder | Total bid | Against the low bid | Against the estimate |
|---|---|---|---|---|
| 1 | Hunter Industries, LTD. | $184,258 | Low | +13% |
| 2 | CK Newberry, LLC | $247,421 | +34% | +51% |
| 3 | Dean Word Company, LTD. | $257,701 | +40% | +58% |
| 4 | Salinas Construction Technologies, LTD. | $288,000 | +56% | +76% |
Engineer's estimate: $163,512.
Bid tabulation
| Line | Pay item | Unit | Quantity | Estimate | 1. Hunter Industries, LTD. | 2. CK Newberry, LLC | 3. Dean Word Company, LTD. | 4. Salinas Construction Technologies, LTD. |
|---|---|---|---|---|---|---|---|---|
| 1 | Remove (10") TRT/untrt base & asphalt pavement (105-7030) | SY | 366 | $11.00 | $11.00 | $30.00 | $12.50 | $31.34 |
| 2 | Excavation (roadway) (110-7001) | CY | 135 | $17.00 | $41.80 | $60.00 | $58.00 | $43.89 |
| 3 | Embankment (final)(DC)(type C1) (132-7008) | CY | 259 | $16.00 | $91.10 | $30.00 | $28.75 | $32.50 |
| 4 | Furn & place topsoil (4") (160-7002) | SY | 1,691 | $2.00 | $1.32 | $4.00 | $9.75 | $6.99 |
| 5 | Roll sodding (162-7008) | SY | 1,691 | $4.00 | $4.77 | $7.00 | $7.00 | $7.14 |
| 6 | Vegetative watering (168-7001) | TGL | 26.38 | $6.00 | $36.28 | $70.00 | $81.00 | $115.32 |
| 7 | Soil ret BLKT(SL_mod_sand_short_roll) (169-7011) | SY | 1,691 | $2.10 | $2.52 | $3.00 | $2.25 | $2.30 |
| 8 | Proof rolling (216-7001) | HR | 8 | $85.00 | $77.00 | $100.00 | $121.25 | $75.60 |
| 9 | D-GR HMA type-B PG64-22 (exempt) (341-7003) | TON | 567 | $100.00 | $88.00 | $125.00 | $103.50 | $135.16 |
| 10 | SP mixes SP-C sac-B PG76-22 (exempt) (344-7039) | TON | 145 | $180.00 | $123.20 | $245.00 | $173.25 | $186.27 |
| 11 | Planing asphalt concrete pavement(0" to 2") (354-7032) | SY | 93 | $2.00 | $12.31 | $40.00 | $15.00 | $58.30 |
| 12 | Clean existing culverts (480-7001) | EACH | 1 | $2,600.00 | $1,000.00 | $5,000.00 | $3,542.50 | $3,597.64 |
| 13 | Mobilization (500-7001) | LS | 1 | $14,590 | $18,151 | $15,000 | $42,500 | $59,768 |
| 14 | Barricades, signs and traffic handling (502-7001) | MO | 2 | $3,000.00 | $2,500.00 | $10,000 | $9,174.25 | $2,900.02 |
| 15 | Portable changeable message sign (503-7001) | DAY | 54 | $100.00 | $80.92 | $75.00 | $220.25 | $113.83 |
| 16 | TMA (stationary) (505-7001) | DAY | 16 | $200.00 | $161.84 | $400.00 | $595.25 | $295.87 |
| 17 | TMA (mobile operation) (505-7003) | DAY | 1 | $240.00 | $377.62 | $800.00 | $1,041.75 | $595.96 |
| 18 | Rock filter dams (install) (type 2) (506-7002) | LF | 78 | $40.00 | $40.84 | $50.00 | $51.25 | $46.37 |
| 19 | Rock filter dams (remove) (506-7011) | LF | 78 | $14.00 | $15.74 | $10.00 | $7.75 | $7.79 |
| 20 | Construction exits (install) (type 1) (506-7020) | SY | 112 | $28.00 | $28.96 | $20.00 | $30.75 | $28.05 |
| 21 | Construction exits (remove) (506-7024) | SY | 112 | $9.00 | $14.85 | $5.00 | $7.75 | $7.43 |
| 22 | Temporary sediment control fence (install) (506-7039) | LF | 834 | $4.00 | $3.70 | $4.00 | $4.00 | $3.63 |
| 23 | Temporary sediment control fence (remove) (506-7041) | LF | 834 | $1.00 | $1.28 | $0.50 | $1.00 | $0.99 |
| 24 | Biodegradable erosion control logs (install) (8") (506-7043) | LF | 70 | $4.00 | $6.33 | $8.00 | $5.00 | $5.56 |
| 25 | Biodegradable erosion control logs (remove) (506-7046) | LF | 70 | $1.00 | $2.09 | $1.00 | $1.00 | $2.20 |
| 26 | Mill rumble strips (asphalt) (shoulder) (533-7001) | LF | 821 | $0.25 | $11.45 | $10.00 | $4.00 | $8.77 |
| 27 | Relocate SM RD SN sup&AM type 10BWG (644-7065) | EACH | 1 | $550.00 | $350.00 | $2,500.00 | $784.00 | $559.26 |
| 28 | Reflectorized pavement marking type I (W)8"(DOT)(100MIL) (666-7018) | LF | 39 | $1.50 | $2.63 | $2.50 | $3.25 | $5.12 |
| 29 | Reflectorized pavement marking type I (W)8"(solid)(100MIL) (666-7024) | LF | 670 | $1.50 | $2.36 | $2.25 | $3.00 | $2.61 |
| 30 | Reflectorized pavement marking type I (W)24"(solid)(100MIL) (666-7036) | LF | 12 | $8.00 | $15.75 | $15.00 | $19.25 | $24.21 |
| 31 | Reflectorized pavement marking type I (W)(arrow)(100MIL) (666-7042) | EACH | 3 | $175.00 | $262.51 | $250.00 | $320.50 | $305.85 |
| 32 | Reflectorized pavement marking type I (W)(word)(100MIL) (666-7066) | EACH | 3 | $200.00 | $288.76 | $275.00 | $352.75 | $333.35 |
| 33 | Reflectorized pavement marking type II (W) 8" (DOT) (666-7177) | LF | 39 | $0.50 | $0.58 | $0.55 | $0.75 | $2.98 |
| 34 | Reflectorized pavement marking type II (W) 8" (solid) (666-7179) | LF | 670 | $5.00 | $0.53 | $0.50 | $0.75 | $0.69 |
| 35 | Reflectorized pavement marking type II (W) 24" (solid) (666-7184) | LF | 12 | $5.00 | $2.10 | $2.00 | $2.50 | $9.91 |
| 36 | Reflectorized pavement marking type II (W) (arrow) (666-7186) | EACH | 3 | $95.00 | $68.25 | $65.00 | $83.25 | $102.35 |
| 37 | Reflectorized pavement marking type II (W) (word) (666-7194) | EACH | 3 | $100.00 | $78.75 | $75.00 | $96.25 | $113.35 |
| 38 | Reflectorized pavement marking type II (Y) 6" (solid) (666-7213) | LF | 821 | $0.20 | $0.47 | $0.45 | $0.50 | $0.61 |
| 39 | Pavement sler 6" (666-7347) | LF | 821 | $0.20 | $0.47 | $0.45 | $0.50 | $0.61 |
| 40 | Pavement sler 8" (666-7348) | LF | 709 | $0.30 | $0.53 | $0.50 | $0.75 | $0.68 |
| 41 | Pavement sler 24" (666-7352) | LF | 12 | $1.50 | $2.10 | $2.00 | $2.50 | $9.91 |
| 42 | Pavement sler (arrow) (666-7353) | EACH | 3 | $30.00 | $68.25 | $65.00 | $83.25 | $102.35 |
| 43 | Pavement sler (word) (666-7354) | EACH | 3 | $35.00 | $78.75 | $75.00 | $96.25 | $113.35 |
| 44 | Reflectorized pavement marking type I (Y)6"(solid)(100MIL) (666-7423) | LF | 821 | $0.50 | $1.84 | $1.75 | $2.25 | $2.04 |
| 45 | Reflectorized pavement marker type II-C-R (672-7006) | EACH | 34 | $4.00 | $21.00 | $20.00 | $25.75 | $24.72 |
| 46 | Eliminating existing PM & markers (8") (677-7004) | LF | 66 | $0.75 | $1.05 | $1.00 | $1.25 | $2.50 |
| 47 | Eliminating existing PM & markers (24") (677-7008) | LF | 12 | $3.00 | $2.10 | $2.00 | $2.50 | $9.91 |
| 48 | Eliminating existing PM & markers (arrow) (677-7009) | EACH | 1 | $55.00 | $68.25 | $65.00 | $83.25 | $175.06 |
| 49 | Eliminating existing PM & markers (word) (677-7015) | EACH | 1 | $55.00 | $78.75 | $75.00 | $96.25 | $164.06 |
| 50 | Pavement surface preparation for marking (6") (678-7002) | LF | 821 | $0.10 | $0.26 | $0.25 | $0.25 | $0.39 |
| 51 | Pavement surface preparation for marking (8") (678-7004) | LF | 682 | $0.15 | $0.37 | $0.35 | $0.50 | $0.52 |
| 52 | Pavement surface preparation for marking (24") (678-7008) | LF | 12 | $0.75 | $1.05 | $1.00 | $1.25 | $8.81 |
| 53 | Pavement surface preparation for marking (arrow) (678-7009) | EACH | 3 | $20.00 | $15.75 | $15.00 | $19.25 | $47.35 |
| 54 | Pavement surface preparation for marking (word) (678-7016) | EACH | 3 | $20.00 | $21.00 | $20.00 | $25.75 | $52.85 |
| 55 | Pavement surface preparation for marking (RPM) (678-7033) | EACH | 682 | $0.50 | $0.16 | $0.15 | $0.25 | $0.30 |
| 56 | Underseal course (3006-7001) | GAL | 252 | $4.00 | $3.85 | $4.00 | $4.25 | $19.72 |
| 57 | Bonding course (3007-7001) | GAL | 148 | $2.75 | $3.63 | $4.00 | $4.25 | $23.98 |
The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.
Source
Read from TxDOT's tabulation for this contract. TxDOT Bid Tabulations open-data export (data.texas.gov) from September 2024, read 21 November 2026, and TxDOT's legacy Tabulation of Bids pages for January 2020 to August 2024. The legacy pages are a large sample, not every contract: their file names were reused from year to year. Their district is the one TxDOT gives the county. Bids that did not match their published total are left out.
Every contract let that day: TxDOT letting of December 3, 2025. Compiled by Mirage Metrics.
Your own bid history, read the same way
Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.