TxDOT contract A00187431 bid tabulation
Preventive Maintenance, FM 273 (SH 78 to FM 1396). Let by Texas DOT on October 7, 2026, Fannin, Paris District. 6 bids received; low bid $9,766,246 by A. K. Gillis & Sons, LLC, -11% against the engineer's estimate of $10,924,688.
- Owner
- Texas DOT
- Letting
- 07 OCT 2026
- Pay items
- 106
- Data through
- 19 NOV 2026
Bidders
| Rank | Bidder | Total bid | Against the low bid | Against the estimate |
|---|---|---|---|---|
| 1 | A. K. Gillis & Sons, LLC | $9,766,246 | Low | -11% |
| 2 | D. L. Lennon Incorporated - Contractor | $9,964,787 | +2.0% | -9.0% |
| 3 | Overland Corporation | $11,920,777 | +22% | +9.0% |
| 4 | Jagoe-Public Company | $13,165,820 | +35% | +21% |
| 5 | Austin Bridge & Road Services, LP | $13,580,257 | +39% | +24% |
| 6 | THK Construction LLC | $18,167,614 | +86% | +66% |
Engineer's estimate: $10,924,688.
Bid tabulation
| Line | Pay item | Unit | Quantity | Estimate | 1. A. K. Gillis & Sons, LLC | 2. D. L. Lennon Incorporated - Contractor | 3. Overland Corporation | 4. Jagoe-Public Company | 5. Austin Bridge & Road Services, LP | 6. THK Construction LLC |
|---|---|---|---|---|---|---|---|---|---|---|
| 1 | Preparing row (100-7002) | STA | 323.20 | $900.00 | $633.17 | $556.17 | $629.50 | $700.00 | $3,425.00 | $800.00 |
| 2 | Removing concrete (driveways) (104-7011) | SY | 422 | $16.00 | $12.00 | $12.00 | $22.00 | $40.00 | $17.11 | $30.00 |
| 3 | Removing concrete (curb) (104-7016) | LF | 281 | $15.00 | $5.00 | $5.00 | $15.00 | $17.00 | $8.06 | $20.00 |
| 4 | Excavation (roadway) (110-7001) | CY | 16 | $20.00 | $75.00 | $100.00 | $275.00 | $2,500.00 | $274.00 | $30.00 |
| 5 | Excavation (channel) (110-7002) | CY | 98 | $25.00 | $75.00 | $100.00 | $150.00 | $120.00 | $88.34 | $30.00 |
| 6 | Subgr widen (OC) (112-7001) | STA | 320.20 | $225.00 | $200.00 | $200.00 | $165.00 | $750.00 | $82.54 | $265.00 |
| 7 | Embankment (vehicle)(OC)(type B) (132-7015) | CY | 436 | $30.52 | $20.00 | $24.00 | $100.00 | $48.00 | $11.12 | $50.00 |
| 8 | Backfill (type B) (134-7002) | STA | 320.20 | $125.00 | $200.00 | $155.00 | $1,245.00 | $450.00 | $120.00 | $240.00 |
| 9 | Road grader work (ord comp) (152-7001) | STA | 320.20 | $200.00 | $200.00 | $217.00 | $110.00 | $120.00 | $36.89 | $200.00 |
| 10 | Bulldozer work (156-7001) | HR | 14 | $35.00 | $100.00 | $150.00 | $235.00 | $100.00 | $111.00 | $300.00 |
| 11 | Spec excavation work (hyd excavator) (158-7002) | HR | 14 | $25.00 | $200.00 | $250.00 | $238.00 | $180.00 | $177.00 | $300.00 |
| 12 | Broadcast seed (temporary_warm) (164-7005) | SY | 71,153 | $0.16 | $0.15 | $0.15 | $0.12 | $0.17 | $0.15 | $0.17 |
| 13 | Broadcast seed (temporary_cool) (164-7006) | SY | 71,153 | $0.16 | $0.15 | $0.15 | $0.12 | $0.17 | $0.15 | $0.17 |
| 14 | Straw/hay mulch seed(permanent_rural_clay) (164-7026) | SY | 142,307 | $0.50 | $0.30 | $0.30 | $0.95 | $0.30 | $0.30 | $0.33 |
| 15 | Vegetative watering (168-7001) | TGL | 854 | $11.30 | $1.00 | $0.01 | $25.00 | $43.00 | $35.00 | $10.00 |
| 16 | Proof rolling (216-7001) | HR | 40 | $85.00 | $100.00 | $115.00 | $70.00 | $60.00 | $148.00 | $200.00 |
| 17 | FL BS (compacted in place)(type D GR 4) (8") (247-7081) | SY | 100,242 | $24.95 | $19.77 | $20.05 | $20.00 | $23.00 | $24.50 | $50.00 |
| 18 | Geogrid base reinforcement (type 2) (250-7002) | SY | 111,982 | $1.35 | $1.38 | $1.36 | $1.25 | $2.50 | $1.12 | $1.79 |
| 19 | Rework BS metal (type C)(10")(ord comp) (251-7053) | SY | 86,011 | $2.40 | $2.75 | $2.85 | $3.30 | $3.25 | $1.60 | $20.00 |
| 20 | Cement (275-7001) | TON | 606 | $225.00 | $230.00 | $250.00 | $265.00 | $260.00 | $270.00 | $230.00 |
| 21 | Cement TRT (new base)(6") (275-7010) | SY | 100,242 | $5.00 | $2.75 | $2.80 | $1.40 | $2.75 | $10.50 | $7.00 |
| 22 | Asphalt (RC-250) (316-7016) | GAL | 29,236 | $6.00 | $6.21 | $7.17 | $6.25 | $7.00 | $6.00 | $6.60 |
| 23 | Aggregate (type-B, GR-5) (316-7250) | CY | 747 | $115.00 | $136.27 | $116.85 | $275.00 | $240.00 | $218.00 | $239.80 |
| 24 | SP mixes SP-C sac-A PG64-22 (344-7010) | TON | 16,962 | $125.00 | $122.81 | $135.00 | $136.00 | $120.00 | $145.00 | $161.53 |
| 25 | Planing asphalt concrete pavement(0" to 4") (354-7034) | SY | 804 | $3.60 | $14.49 | $16.00 | $17.00 | $25.00 | $15.12 | $14.30 |
| 26 | Cut & restoring pavement (400-7006) | SY | 895 | $125.00 | $90.00 | $90.00 | $135.00 | $70.00 | $65.24 | $160.00 |
| 27 | Flowable backfill (401-7001) | CY | 517 | $269.20 | $250.00 | $250.00 | $285.00 | $290.00 | $145.00 | $275.00 |
| 28 | Trench excavation protection (402-7001) | LF | 824 | $10.00 | $15.00 | $15.00 | $1.00 | $12.00 | $12.74 | $20.00 |
| 29 | Temporary special shoring (403-7001) | SF | 2,283 | $20.00 | $20.00 | $22.00 | $26.00 | $80.00 | $30.00 | $55.00 |
| 30 | Riprap (mow strip)(4 in) (432-7013) | CY | 669 | $570.00 | $650.00 | $650.00 | $680.00 | $1,000.00 | $650.00 | $850.00 |
| 31 | Riprap (stone protection)(18 in) (432-7043) | CY | 352 | $180.00 | $265.57 | $300.00 | $275.00 | $360.00 | $183.00 | $225.00 |
| 32 | Cleaning and sealing existing joints (CL3) (438-7004) | LF | 196 | $32.00 | $51.00 | $51.00 | $51.00 | $60.00 | $51.00 | $65.00 |
| 33 | Cleaning and sealing existing joints (CL7) (438-7007) | LF | 98 | $40.00 | $38.00 | $38.00 | $38.00 | $43.00 | $38.00 | $65.00 |
| 34 | Retrofit rail (type T631) (451-7020) | LF | 668 | $150.00 | $63.90 | $63.90 | $72.00 | $80.00 | $72.00 | $79.20 |
| 35 | Concrete box culvert (7 FT X 4 FT) (462-7016) | LF | 120 | $725.00 | $725.00 | $725.00 | $600.00 | $700.00 | $705.00 | $1,000.00 |
| 36 | Concrete box culvert (8 FT X 4 FT) (462-7021) | LF | 184 | $900.00 | $750.00 | $750.00 | $650.00 | $700.00 | $715.00 | $1,100.00 |
| 37 | RC pipe (CL III)(18 in) (464-7003) | LF | 3,894 | $50.00 | $50.00 | $50.00 | $60.00 | $60.00 | $110.00 | $65.00 |
| 38 | RC pipe (CL III)(24 in) (464-7005) | LF | 754 | $80.00 | $78.00 | $78.00 | $70.00 | $80.00 | $145.00 | $80.00 |
| 39 | RC pipe (CL III)(30 in) (464-7007) | LF | 158 | $115.00 | $115.00 | $115.00 | $100.00 | $130.00 | $116.00 | $120.00 |
| 40 | RC pipe (CL III)(36 in) (464-7009) | LF | 388 | $110.00 | $170.00 | $170.00 | $140.00 | $180.00 | $165.00 | $150.00 |
| 41 | Headwall (CH - PW - 0) (diameter= 30 in) (466-7103) | EACH | 1 | $6,000.00 | $8,000.00 | $8,000.00 | $8,780.00 | $12,000 | $14,000 | $30,000 |
| 42 | Headwall (CH - PW - 0) (diameter= 36 in) (466-7105) | EACH | 2 | $6,500.00 | $9,000.00 | $9,000.00 | $13,060 | $15,000 | $17,500 | $30,000 |
| 43 | Headwall (CH - PW - S) (diameter= 18 in) (466-7114) | EACH | 1 | $5,000.00 | $4,000.00 | $4,000.00 | $5,830.00 | $7,000.00 | $10,500 | $20,000 |
| 44 | Wingwall (PW - 2) (HW=6 FT) (466-7190) | EACH | 4 | $17,000 | $18,000 | $18,000 | $24,000 | $31,000 | $14,150 | $70,000 |
| 45 | Set (type II) (18 in) (RCP) (6: 1) (C) (467-7307) | EACH | 3 | $800.00 | $750.00 | $750.00 | $700.00 | $1,400.00 | $2,280.00 | $1,000.00 |
| 46 | Set (type II) (18 in) (RCP) (6: 1) (P) (467-7308) | EACH | 265 | $750.00 | $750.00 | $750.00 | $1,098.00 | $1,900.00 | $1,441.00 | $900.00 |
| 47 | Set (type II) (24 in) (RCP) (6: 1) (C) (467-7327) | EACH | 6 | $1,400.00 | $1,300.00 | $1,300.00 | $1,532.00 | $1,600.00 | $1,943.00 | $2,000.00 |
| 48 | Set (type II) (24 in) (RCP) (6: 1) (P) (467-7328) | EACH | 40 | $1,400.00 | $1,300.00 | $1,300.00 | $1,532.00 | $2,200.00 | $1,606.00 | $1,200.00 |
| 49 | Set (type II) (30 in) (RCP) (6: 1) (C) (467-7347) | EACH | 2 | $2,400.00 | $2,500.00 | $2,500.00 | $2,641.00 | $3,300.00 | $2,296.00 | $2,500.00 |
| 50 | Set (type II) (36 in) (RCP) (6: 1) (C) (467-7367) | EACH | 10 | $4,520.00 | $5,500.00 | $5,500.00 | $4,165.00 | $4,400.00 | $2,589.00 | $5,000.00 |
| 51 | Set (type II) (36 in) (RCP) (6: 1) (P) (467-7368) | EACH | 2 | $4,500.00 | $6,000.00 | $6,000.00 | $4,157.00 | $5,000.00 | $3,921.00 | $5,000.00 |
| 52 | Removing & RE - lay pipe (18 in) (472-7004) | LF | 14 | $30.00 | $22.00 | $22.00 | $60.00 | $150.00 | $386.00 | $100.00 |
| 53 | Removing & RE - lay pipe (36 in) (472-7011) | LF | 212 | $40.00 | $50.00 | $50.00 | $78.00 | $150.00 | $76.83 | $125.00 |
| 54 | Clean existing culverts (480-7001) | EACH | 12 | $1,000.00 | $1,200.00 | $1,200.00 | $3,300.00 | $2,000.00 | $2,122.00 | $5,000.00 |
| 55 | Removing structure (set) (496-7004) | EACH | 16 | $100.00 | $100.00 | $100.00 | $125.00 | $180.00 | $470.00 | $500.00 |
| 56 | Removing structure (pipe) (496-7007) | LF | 4,932 | $8.00 | $8.00 | $8.00 | $8.00 | $47.00 | $24.24 | $10.00 |
| 57 | Mobilization (500-7001) | LS | 1 | $993,225 | $509,568 | $265,515 | $1,173,420 | $1,460,000 | $1,335,000 | $1,500,000 |
| 58 | Barricades, signs and traffic handling (502-7001) | MO | 19 | $3,500.00 | $6,645.00 | $10,107 | $19,500 | $26,000 | $22,000 | $13,092 |
| 59 | Portable changeable message sign (503-7002) | EACH | 2 | $12,000 | $12,500 | $16,500 | $23,000 | $15,000 | $3,789.00 | $30,000 |
| 60 | TMA (stationary) (505-7001) | DAY | 230 | $150.00 | $250.00 | $125.00 | $650.00 | $350.00 | $335.00 | $275.00 |
| 61 | TMA (mobile operation) (505-7003) | DAY | 50 | $150.00 | $100.00 | $125.00 | $25.00 | $350.00 | $350.00 | $400.00 |
| 62 | Rock filter dams (install) (type 2) (506-7002) | LF | 840 | $55.00 | $50.00 | $65.00 | $55.00 | $50.00 | $50.00 | $55.00 |
| 63 | Rock filter dams (remove) (506-7011) | LF | 840 | $10.00 | $10.00 | $10.00 | $15.00 | $11.00 | $10.00 | $11.00 |
| 64 | Temporary sediment control fence (install) (506-7039) | LF | 1,260 | $4.50 | $4.00 | $4.00 | $4.00 | $4.25 | $4.00 | $4.40 |
| 65 | Temporary sediment control fence (remove) (506-7041) | LF | 1,260 | $1.28 | $0.50 | $0.50 | $1.00 | $0.50 | $0.50 | $0.55 |
| 66 | One-way traffic control (port traffic signal) (510-7003) | MO | 3 | $5,000.00 | $4,500.00 | $6,000.00 | $4,550.00 | $20,000 | $12,000 | $25,000 |
| 67 | Portable concrete traffic barrier (furnish and install)(F-shape)(type 1) (512-7005) | LF | 2,250 | $55.00 | $43.00 | $90.00 | $85.00 | $90.00 | $26.19 | $115.00 |
| 68 | Portable concrete traffic barrier (move)(F-shape)(type 1) (512-7029) | LF | 8,190 | $12.00 | $15.00 | $15.00 | $15.00 | $13.00 | $6.05 | $25.00 |
| 69 | Portable concrete traffic barrier (remove)(F-shape)(type 1) (512-7053) | LF | 2,250 | $14.00 | $25.00 | $15.00 | $25.00 | $20.00 | $14.65 | $35.00 |
| 70 | Intersections (ACP) (530-7002) | SY | 1,267 | $45.00 | $60.00 | $42.00 | $45.00 | $28.00 | $57.98 | $35.20 |
| 71 | Driveways (concrete) (530-7006) | SY | 422 | $100.00 | $95.00 | $103.00 | $150.00 | $150.00 | $125.00 | $120.00 |
| 72 | Driveways (ACP) (530-7010) | SY | 2,113 | $50.00 | $60.00 | $42.00 | $70.00 | $50.00 | $37.23 | $55.00 |
| 73 | Driveways (base) (530-7015) | SY | 6,651 | $35.00 | $27.78 | $36.00 | $28.00 | $17.00 | $28.20 | $55.00 |
| 74 | Turnouts (ACP) (530-7018) | SY | 1,595 | $75.00 | $130.00 | $112.00 | $155.00 | $70.00 | $108.00 | $115.50 |
| 75 | Mill rumble strips (asphalt) (shoulder) (533-7001) | LF | 64,642 | $0.26 | $0.07 | $0.57 | $0.10 | $0.26 | $0.08 | $0.17 |
| 76 | Mill rumble strips (asphalt) (centerline) (533-7002) | LF | 32,321 | $0.24 | $0.08 | $0.58 | $0.10 | $0.26 | $0.09 | $0.27 |
| 77 | Metal W-beam guard fence (steel post) (540-7002) | LF | 5,700 | $25.00 | $27.55 | $27.55 | $28.00 | $29.00 | $28.00 | $30.80 |
| 78 | Remove metal beam guard fence (542-7001) | LF | 5,250 | $2.24 | $2.25 | $2.25 | $1.75 | $1.75 | $1.75 | $1.93 |
| 79 | Remove terminal anchor section (542-7002) | EACH | 11 | $90.09 | $225.00 | $225.00 | $150.00 | $160.00 | $150.00 | $165.00 |
| 80 | Guardrail end treatment (install) (544-7001) | EACH | 12 | $2,400.00 | $3,396.00 | $3,396.00 | $3,050.00 | $3,200.00 | $3,050.00 | $3,355.00 |
| 81 | Guardrail end treatment (remove) (544-7003) | EACH | 1 | $193.77 | $225.00 | $225.00 | $150.00 | $160.00 | $150.00 | $165.00 |
| 82 | Crash cushion attenuator (move & reset) (545-7002) | EACH | 8 | $1,170.26 | $500.00 | $500.00 | $1,500.00 | $900.00 | $1,500.00 | $1,650.00 |
| 83 | Crash cushion attenuator (remove) (545-7004) | EACH | 2 | $736.39 | $500.00 | $500.00 | $800.00 | $900.00 | $800.00 | $880.00 |
| 84 | Crash cushion attenuator (install)(S)(N)(TL3) (545-7014) | EACH | 2 | $6,400.00 | $5,000.00 | $5,000.00 | $8,500.00 | $14,000 | $8,500.00 | $9,350.00 |
| 85 | Mailbox install-M (TWG-post) type 1 (560-7001) | EACH | 4 | $700.00 | $675.00 | $1,290.00 | $500.00 | $600.00 | $300.00 | $742.50 |
| 86 | Mailbox install-S (WC-post) type 3 (560-7004) | EACH | 59 | $300.00 | $135.00 | $175.00 | $125.00 | $210.00 | $250.00 | $148.50 |
| 87 | Mailbox install-D (WC-post) type 3 (560-7005) | EACH | 9 | $300.00 | $210.00 | $200.00 | $175.00 | $230.00 | $400.00 | $231.00 |
| 88 | Install small roadside sign support and assembly type 10BWG(1)SA(P) (644-7001) | EACH | 94 | $625.00 | $563.00 | $661.00 | $600.00 | $700.00 | $250.00 | $619.30 |
| 89 | Install small roadside sign support and assembly type 10BWG(1)SA(T) (644-7004) | EACH | 16 | $750.00 | $690.00 | $910.00 | $675.00 | $800.00 | $500.00 | $759.00 |
| 90 | Install small roadside sign support and assembly type 10BWG(1)SA(U) (644-7007) | EACH | 2 | $1,046.47 | $1,045.00 | $1,236.00 | $800.00 | $900.00 | $400.00 | $1,149.50 |
| 91 | Install small roadside sign support and assembly TYS80(1)SA(T) (644-7028) | EACH | 5 | $992.85 | $925.00 | $1,324.00 | $850.00 | $900.00 | $400.00 | $1,017.50 |
| 92 | Install delineator assembly (D-SW)SZ 1(BRF)GF1 (BI) (658-7016) | EACH | 84 | $33.67 | $25.00 | $25.00 | $27.00 | $28.00 | $27.00 | $29.70 |
| 93 | Install OM SM RD sign (1-OM-con)R (658-7080) | EACH | 23 | $180.00 | $17.00 | $115.00 | $13.00 | $10.00 | $25.00 | $18.70 |
| 94 | Work zone pavement marking non-removing (W)6"(solid) (662-7008) | LF | 138,084 | $0.33 | $0.27 | $0.27 | $0.27 | $0.30 | $0.27 | $0.30 |
| 95 | Work zone pavement marking non-removing (Y)6"(broken) (662-7036) | LF | 44,602 | $0.30 | $0.20 | $0.20 | $0.20 | $0.30 | $0.20 | $0.22 |
| 96 | Work zone pavement marking non-removing (Y)6"(solid) (662-7038) | LF | 78,304 | $0.30 | $0.27 | $0.27 | $0.27 | $0.30 | $0.27 | $0.30 |
| 97 | Work zone pavement marking SHT terminal (tab)type Y-2 (662-7114) | EACH | 3,305 | $1.50 | $2.45 | $1.00 | $0.50 | $2.25 | $1.00 | $1.00 |
| 98 | Reflectorized pavement marking type I (W)8"(solid)(090MIL) (666-7023) | LF | 750 | $1.50 | $0.95 | $0.95 | $1.50 | $1.50 | $0.95 | $1.05 |
| 99 | Reflectorized pavement marking type I (W)24"(solid)(090MIL) (666-7035) | LF | 248 | $10.00 | $7.50 | $7.50 | $7.50 | $7.00 | $7.50 | $8.25 |
| 100 | Ref pavement marking type I(W)36"(yld tri)(090MIL) (666-7089) | EACH | 20 | $50.00 | $77.00 | $77.00 | $77.00 | $50.00 | $77.00 | $84.70 |
| 101 | Type I high perf PM (W)6"(solid)(090MIL) (666-7292) | LF | 59,414 | $0.60 | $0.63 | $0.63 | $0.65 | $0.90 | $0.63 | $0.69 |
| 102 | Type I high perf PM (Y)6"(broken)(090MIL) (666-7301) | LF | 22,301 | $0.63 | $0.30 | $0.30 | $0.35 | $0.90 | $0.30 | $0.33 |
| 103 | Type I high perf PM (Y)6"(solid)(090MIL) (666-7304) | LF | 27,946 | $0.60 | $0.63 | $0.63 | $0.65 | $0.90 | $0.63 | $0.69 |
| 104 | Reflectorized pavement marker type II-A-A (672-7004) | EACH | 1,232 | $4.00 | $4.00 | $4.00 | $4.20 | $4.00 | $4.00 | $4.40 |
| 105 | Reflectorized pavement marker type II-C-C (672-7005) | EACH | 1,060 | $4.50 | $4.00 | $4.00 | $4.20 | $4.00 | $4.00 | $4.40 |
| 106 | Eliminating existing PM & markers (6") (677-7002) | LF | 21,242 | $0.62 | $0.75 | $0.75 | $0.75 | $0.70 | $0.75 | $0.83 |
The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.
Source
Read from TxDOT's tabulation for this contract. TxDOT Bid Tabulations open-data export (data.texas.gov) from September 2024, read 21 November 2026, and TxDOT's legacy Tabulation of Bids pages for January 2020 to August 2024. The legacy pages are a large sample, not every contract: their file names were reused from year to year. Their district is the one TxDOT gives the county. Bids that did not match their published total are left out.
Every contract let that day: TxDOT letting of October 7, 2026. Compiled by Mirage Metrics.