TxDOT contract A00193144 bid tabulation
Hazard Elimination & Safety, US 281 (0.8 MI N of PR1 to 0.515 MI S of PR1). Let by Texas DOT on August 6, 2026, Blanco, Austin District. 7 bids received; low bid $2,419,095 by Hunter Industries, LTD., -3.1% against the engineer's estimate of $2,495,199.
- Owner
- Texas DOT
- Letting
- 06 AUG 2026
- Pay items
- 86
- Data through
- 19 NOV 2026
Bidders
| Rank | Bidder | Total bid | Against the low bid | Against the estimate |
|---|---|---|---|---|
| 1 | Hunter Industries, LTD. | $2,419,095 | Low | -3.0% |
| 2 | Clark Construction of Texas, Inc. | $2,489,091 | +3.0% | 0.0% |
| 3 | Texas Materials Group, Inc. | $2,985,836 | +23% | +20% |
| 4 | MPB, Inc. | $2,995,793 | +24% | +20% |
| 5 | STX Civil | $3,165,295 | +31% | +27% |
| 6 | Joe Bland Construction LLC | $3,235,825 | +34% | +30% |
| 7 | E-Z Bel Construction, LLC | $3,442,394 | +42% | +38% |
Engineer's estimate: $2,495,199.
Bid tabulation
| Line | Pay item | Unit | Quantity | Estimate | 1. Hunter Industries, LTD. | 2. Clark Construction of Texas, Inc. | 3. Texas Materials Group, Inc. | 4. MPB, Inc. | 5. STX Civil | 6. Joe Bland Construction LLC |
|---|---|---|---|---|---|---|---|---|---|---|
| 1 | Preparing row (100-7002) | STA | 76.34 | $1,150.00 | $761.21 | $460.68 | $461.00 | $334.00 | $1,200.00 | $1,500.00 |
| 2 | Tree protection (install) (100-7014) | LF | 200 | $12.00 | $7.70 | $15.00 | $8.00 | $6.00 | $12.00 | $20.00 |
| 3 | Tree protection (remove) (100-7016) | LF | 200 | $1.40 | $7.70 | $5.00 | $5.00 | $3.00 | $6.00 | $4.00 |
| 4 | Removing concrete (mowstrip) (104-7003) | SY | 477 | $23.00 | $12.10 | $30.00 | $45.00 | $15.62 | $22.00 | $25.00 |
| 5 | Removing concrete (riprap) (104-7006) | SY | 102 | $20.00 | $14.30 | $30.00 | $25.00 | $17.55 | $28.00 | $30.00 |
| 6 | Remove (0"-12") TRT/untrt base & asphalt pavement (105-7052) | SY | 907 | $15.00 | $5.50 | $12.65 | $9.00 | $19.80 | $18.00 | $18.00 |
| 7 | Remove stab base and asphalt pavement (6"-20") (105-7123) | SY | 326 | $15.00 | $7.70 | $33.43 | $35.00 | $27.65 | $25.00 | $16.00 |
| 8 | Excavation (roadway) (110-7001) | CY | 10,631 | $13.00 | $19.80 | $14.37 | $28.00 | $24.30 | $16.00 | $28.00 |
| 9 | Embankment (final)(OC)(type B) (132-7003) | CY | 2,517 | $15.00 | $19.80 | $25.48 | $18.50 | $16.05 | $18.00 | $7.00 |
| 10 | Embankment (final)(OC)(type C) (132-7005) | CY | 5 | $17.00 | $133.10 | $150.00 | $98.00 | $108.10 | $150.00 | $330.00 |
| 11 | Backfill (type A) (134-7001) | STA | 28 | $220.00 | $154.00 | $1,129.08 | $450.00 | $140.17 | $900.00 | $1,100.00 |
| 12 | Furn & place topsoil (4") (160-7002) | SY | 24,136 | $1.75 | $1.59 | $2.50 | $6.00 | $1.40 | $4.50 | $1.50 |
| 13 | Drill seed (permanent_rural_clay) (164-7010) | SY | 24,136 | $0.20 | $0.23 | $0.22 | $0.17 | $0.18 | $0.75 | $0.25 |
| 14 | Vegetative watering (168-7001) | TGL | 406 | $13.00 | $23.10 | $55.00 | $65.00 | $125.00 | $60.00 | $25.00 |
| 15 | Soil ret BLKT(SL_mod_clay_long) (169-7002) | SY | 21,797 | $1.75 | $1.43 | $1.35 | $0.65 | $0.70 | $2.25 | $1.50 |
| 16 | Soil ret BLKT(chan_permanent_6 PSF) (169-7033) | SY | 2,339 | $1.75 | $1.85 | $1.75 | $2.92 | $3.15 | $5.50 | $2.00 |
| 17 | Wildflower seeding (180-7001) | ACRE | 4.98 | $1,100.00 | $2,190.49 | $2,075.00 | $2,176.58 | $2,330.00 | $400.00 | $2,500.00 |
| 18 | FL BS (compacted in place)(type A GR 5)(final pos) (247-7179) | CY | 2,514 | $60.00 | $55.66 | $58.63 | $65.00 | $84.35 | $95.00 | $120.00 |
| 19 | Prime coat (AE-P) (310-7001) | GAL | 1,908 | $5.00 | $5.17 | $5.10 | $5.50 | $3.95 | $5.75 | $4.00 |
| 20 | D-GR HMA type-B PG64-22 (341-7001) | TON | 1,428 | $98.00 | $97.57 | $97.00 | $117.00 | $118.77 | $115.00 | $125.00 |
| 21 | D-GR HMA type D PG70-28 (level-UP) (341-7055) | TON | 367 | $126.00 | $124.48 | $125.75 | $155.00 | $163.00 | $148.00 | $175.00 |
| 22 | D-GR HMA type D PG76-22 (341-7056) | TON | 718 | $128.50 | $126.68 | $135.90 | $140.00 | $135.00 | $154.00 | $142.00 |
| 23 | Tom-C PG76-22 sac-B (347-7002) | TON | 2,144 | $135.00 | $129.10 | $121.57 | $168.00 | $167.00 | $172.00 | $175.00 |
| 24 | Flexible pavement structure repair(4") (351-7003) | SY | 4,453 | $33.00 | $32.92 | $30.20 | $38.00 | $39.10 | $46.00 | $40.00 |
| 25 | Planing asphalt concrete pavement(0" to 1" micro) (354-7045) | SY | 2,130 | $1.65 | $3.30 | $2.00 | $8.30 | $5.35 | $7.50 | $6.00 |
| 26 | Temporary special shoring (403-7001) | SF | 3,860 | $30.00 | $38.63 | $35.00 | $28.00 | $58.85 | $28.00 | $32.00 |
| 27 | Riprap (concrete)(CL B)(5 in) (432-7008) | CY | 23 | $750.00 | $663.65 | $900.00 | $753.00 | $635.00 | $950.00 | $850.00 |
| 28 | Riprap (mow strip)(4 in) (432-7013) | CY | 75 | $700.00 | $570.00 | $900.00 | $630.47 | $745.00 | $700.00 | $760.00 |
| 29 | Riprap (stone protection)(18 in) (432-7043) | CY | 529 | $180.00 | $125.00 | $255.00 | $276.30 | $240.00 | $130.00 | $145.00 |
| 30 | Concrete box culvert (4 FT X 4 FT)(extend) (462-7060) | LF | 14 | $800.00 | $938.22 | $850.00 | $1,473.75 | $1,130.00 | $1,100.00 | $3,650.00 |
| 31 | Concrete box culvert (10 FT X 10 FT)(extend) (462-7093) | LF | 6 | $2,000.00 | $3,311.36 | $3,000.00 | $5,741.00 | $6,230.00 | $3,200.00 | $15,325 |
| 32 | RC pipe (CL III)(18 in) (464-7003) | LF | 119 | $110.00 | $68.43 | $62.00 | $251.08 | $105.00 | $120.00 | $250.00 |
| 33 | RC pipe (CL III)(36 in) (464-7009) | LF | 10 | $250.00 | $496.70 | $450.00 | $281.13 | $175.00 | $250.00 | $650.00 |
| 34 | Headwall (CH - PW - 0) (diameter= 36 in) (466-7105) | EACH | 1 | $12,500 | $9,934.09 | $9,000.00 | $9,737.63 | $11,825 | $9,500.00 | $12,500 |
| 35 | Wingwall (PW - 1) (HW=4 FT) (466-7174) | EACH | 1 | $15,000 | $6,622.73 | $6,000.00 | $14,233 | $25,780 | $14,000 | $8,000.00 |
| 36 | Wingwall (PW - 1) (HW=15 FT) (466-7185) | EACH | 1 | $50,000 | $55,189 | $50,000 | $75,835 | $100,600 | $65,000 | $56,500 |
| 37 | Set (type II) (18 in) (RCP) (6: 1) (P) (467-7308) | EACH | 6 | $1,480.00 | $1,048.60 | $950.00 | $2,461.88 | $2,375.00 | $1,600.00 | $3,150.00 |
| 38 | Removing structure (wingwall) (496-7005) | EACH | 4 | $2,650.00 | $2,207.58 | $2,000.00 | $3,762.50 | $250.00 | $3,500.00 | $2,650.00 |
| 39 | Removing structure (headwall) (496-7006) | EACH | 1 | $2,500.00 | $2,207.58 | $2,000.00 | $3,452.50 | $510.00 | $2,500.00 | $2,650.00 |
| 40 | Removing structure (pipe) (496-7007) | LF | 31 | $25.00 | $38.63 | $35.00 | $248.77 | $14.25 | $45.00 | $60.00 |
| 41 | Mobilization (500-7001) | LS | 1 | $176,850 | $191,739 | $177,134 | $80,000 | $215,000 | $195,000 | $125,000 |
| 42 | Barricades, signs and traffic handling (502-7001) | MO | 9 | $8,500.00 | $9,244.62 | $3,180.00 | $7,500.00 | $1,500.00 | $9,500.00 | $1,500.00 |
| 43 | Portable changeable message sign (503-7002) | EACH | 2 | $8,500.00 | $3,570.33 | $6,250.00 | $15,000 | $78.00 | $9,000.00 | $15,000 |
| 44 | TMA (stationary) (505-7001) | DAY | 200 | $208.00 | $102.01 | $125.75 | $225.00 | $100.00 | $350.00 | $350.00 |
| 45 | TMA (mobile operation) (505-7003) | DAY | 30 | $225.00 | $255.02 | $178.95 | $250.00 | $350.00 | $700.00 | $875.00 |
| 46 | Rock filter dams (install) (type 2) (506-7002) | LF | 109 | $40.00 | $42.23 | $40.00 | $47.73 | $43.40 | $28.00 | $45.00 |
| 47 | Rock filter dams (install) (type 4) (506-7004) | LF | 273 | $65.00 | $50.14 | $47.50 | $45.50 | $58.40 | $32.00 | $55.00 |
| 48 | Rock filter dams (remove) (506-7011) | LF | 382 | $12.00 | $21.11 | $20.00 | $15.64 | $47.65 | $9.00 | $25.00 |
| 49 | Temporary sediment control fence (install) (506-7039) | LF | 5,661 | $5.00 | $2.90 | $2.75 | $4.22 | $4.15 | $2.75 | $6.00 |
| 50 | Temporary sediment control fence (remove) (506-7041) | LF | 5,661 | $2.50 | $1.06 | $1.00 | $1.30 | $1.06 | $0.75 | $2.00 |
| 51 | Biodegradable erosion control logs (install) (12") (506-7044) | LF | 11,050 | $5.00 | $3.69 | $3.50 | $5.91 | $7.25 | $4.25 | $9.00 |
| 52 | Biodegradable erosion control logs (remove) (506-7046) | LF | 11,050 | $1.50 | $1.06 | $1.00 | $1.30 | $1.06 | $1.00 | $2.00 |
| 53 | Driveways (ACP) (530-7010) | SY | 482 | $55.00 | $48.40 | $46.71 | $106.00 | $75.00 | $90.00 | $40.00 |
| 54 | Turnouts (ACP) (530-7018) | SY | 34 | $95.00 | $96.80 | $357.83 | $155.00 | $135.00 | $415.00 | $50.00 |
| 55 | Metal W-beam guard fence (timber post) (540-7001) | LF | 1,135 | $25.00 | $24.50 | $25.00 | $25.38 | $27.16 | $32.00 | $28.00 |
| 56 | Downstream anchor terminal section (540-7015) | EACH | 4 | $1,500.00 | $1,350.00 | $1,300.00 | $1,302.65 | $1,395.00 | $1,100.00 | $1,550.00 |
| 57 | Remove metal beam guard fence (542-7001) | LF | 900 | $2.50 | $2.50 | $2.00 | $6.00 | $6.42 | $6.00 | $2.50 |
| 58 | Guardrail end treatment (install) (544-7001) | EACH | 4 | $3,150.00 | $3,300.00 | $3,500.00 | $3,736.73 | $4,000.00 | $3,900.00 | $4,150.00 |
| 59 | Guardrail end treatment (remove) (544-7003) | EACH | 6 | $250.00 | $250.00 | $150.00 | $436.26 | $467.00 | $450.00 | $175.00 |
| 60 | Wire fence (type C) (552-7003) | LF | 380 | $25.00 | $18.00 | $15.00 | $40.00 | $19.26 | $14.00 | $30.00 |
| 61 | Mailbox install-S (TWW-post) type 4 (560-7008) | EACH | 2 | $365.00 | $250.00 | $500.00 | $300.00 | $325.00 | $900.00 | $465.00 |
| 62 | Install small roadside sign support and assembly type 10BWG(1)SA(P) (644-7001) | EACH | 7 | $700.00 | $850.00 | $645.00 | $825.00 | $802.50 | $1,000.00 | $1,000.00 |
| 63 | Install small roadside sign support and assembly type 10BWG(1)SA(T) (644-7004) | EACH | 4 | $750.00 | $900.00 | $685.00 | $780.00 | $909.50 | $850.00 | $1,100.00 |
| 64 | Remove SM RD SN sup&AM (644-7073) | EACH | 5 | $110.00 | $125.00 | $125.00 | $125.00 | $107.00 | $250.00 | $165.00 |
| 65 | Install delineator assembly (D-SW)SZ 1(WFLX)GND(BI) (658-7004) | EACH | 11 | $70.00 | $90.00 | $85.00 | $160.00 | $160.50 | $120.00 | $180.00 |
| 66 | Install delineator assembly (D-SW)SZ 1(BRF)GF2 (658-7018) | EACH | 16 | $40.00 | $17.00 | $75.00 | $51.95 | $37.45 | $95.00 | $36.00 |
| 67 | Install object marker assembly (OM-2Y)(WC)GND (658-7056) | EACH | 8 | $120.00 | $56.00 | $75.00 | $135.00 | $107.00 | $150.00 | $85.00 |
| 68 | Work zone pavement marking non-removing (W)6"(broken) (662-7005) | LF | 3,827 | $0.40 | $0.25 | $0.25 | $0.25 | $0.27 | $0.55 | $0.25 |
| 69 | Work zone pavement marking non-removing (W)6"(solid) (662-7008) | LF | 15,269 | $0.28 | $0.22 | $0.22 | $0.22 | $0.27 | $0.50 | $0.25 |
| 70 | Work zone pavement marking non-removing (Y)6"(solid) (662-7038) | LF | 15,269 | $0.28 | $0.22 | $0.22 | $0.22 | $0.27 | $0.50 | $0.25 |
| 71 | Work zone pavement marking SHT terminal (tab)type W (662-7112) | EACH | 1,144 | $1.80 | $1.60 | $1.25 | $1.20 | $1.50 | $2.50 | $1.50 |
| 72 | Work zone pavement marking SHT terminal (tab)type Y (662-7113) | EACH | 1,489 | $1.30 | $1.60 | $1.25 | $1.20 | $1.50 | $2.50 | $1.50 |
| 73 | Reflectorized pavement marking type II (W) 6" (broken) (666-7172) | LF | 3,814 | $0.85 | $0.33 | $0.33 | $0.33 | $0.27 | $0.55 | $0.25 |
| 74 | Reflectorized pavement marking type II (W) 6" (solid) (666-7175) | LF | 15,257 | $0.40 | $0.30 | $0.30 | $0.30 | $0.27 | $0.50 | $0.25 |
| 75 | Reflectorized pavement marking type II (Y) 6" (solid) (666-7213) | LF | 15,357 | $0.55 | $0.30 | $0.30 | $0.30 | $0.27 | $0.50 | $0.25 |
| 76 | Reflectorized profile pavement marking type I(W)6"(solid)(090MIL) (666-7265) | LF | 15,257 | $0.80 | $1.00 | $1.00 | $1.00 | $0.89 | $1.55 | $1.00 |
| 77 | Reflectorized profile pavement marking type I(Y)6"(solid)(090MIL) (666-7269) | LF | 15,357 | $0.80 | $1.00 | $1.00 | $1.00 | $0.89 | $1.55 | $1.00 |
| 78 | Reflectorized pavement marking type I (W)6"(broken)(100MIL) (666-7408) | LF | 3,814 | $0.85 | $1.05 | $1.05 | $1.05 | $0.70 | $1.10 | $1.00 |
| 79 | PRFB rumble strip (BLK)(1')(centerline) (668-7002) | LF | 14,905 | $3.00 | $3.00 | $3.00 | $3.00 | $4.01 | $4.00 | $4.50 |
| 80 | Prefabricated PM type C (W)(12")(solid) (668-7087) | LF | 12 | $9.00 | $15.00 | $15.00 | $15.00 | $5.35 | $25.00 | $5.50 |
| 81 | PRFB rumble strip (BLK)(1')(edgeline) (668-7137) | LF | 14,950 | $3.00 | $3.55 | $3.55 | $3.55 | $3.75 | $4.00 | $4.00 |
| 82 | Reflectorized pavement marker type I-C (672-7002) | EACH | 191 | $5.00 | $6.00 | $6.00 | $6.00 | $4.82 | $8.00 | $5.25 |
| 83 | Reflectorized pavement marker type II-A-A (672-7004) | EACH | 192 | $5.00 | $6.50 | $6.50 | $6.50 | $4.82 | $8.00 | $5.25 |
| 84 | Eliminating existing PM & markers (6") (677-7002) | LF | 78,255 | $0.35 | $0.16 | $0.16 | $0.16 | $0.27 | $1.10 | $0.25 |
| 85 | Bonding course (3007-7001) | GAL | 5,662 | $4.00 | $4.40 | $4.45 | $4.50 | $4.00 | $5.25 | $4.25 |
| 86 | Temporary speed monitor sys (6016-7001) | EACH | 2 | $15,000 | $5,100.47 | $33,750 | $23,000 | $7,000.00 | $15,000 | $23,500 |
The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.
Source
Read from TxDOT's tabulation for this contract. TxDOT Bid Tabulations open-data export (data.texas.gov) from September 2024, read 21 November 2026, and TxDOT's legacy Tabulation of Bids pages for January 2020 to August 2024. The legacy pages are a large sample, not every contract: their file names were reused from year to year. Their district is the one TxDOT gives the county. Bids that did not match their published total are left out.
Every contract let that day: TxDOT letting of August 6, 2026. Compiled by Mirage Metrics.