TxDOT contract A00061184 bid tabulation

Widen Road - Add Shoulders, SH 304 (BASTROP COUNTY LINE to 3.2 Mi SOUTH OF BASTROP COUNTY LINE). Let by Texas DOT on September 3, 2026, Caldwell, Austin District. 8 bids received; low bid $5,111,478 by Hunter Industries, LTD., -5.9% against the engineer's estimate of $5,431,676.

Owner
Texas DOT
Letting
03 SEP 2026
Pay items
97
Data through
19 NOV 2026

Bidders

RankBidderTotal bidAgainst the low bidAgainst the estimate
1Hunter Industries, LTD.$5,111,478Low-6.0%
2Texas Materials Group, Inc.$5,481,873+7.0%+1.0%
3D&S Concrete Contractors LLC$5,674,473+11%+4.0%
4Joe Bland Construction LLC$6,469,606+27%+19%
5Aaron Concrete Contractors, LLC$6,786,631+33%+25%
6Dan Williams Company$6,831,569+34%+26%
7STX Civil$7,061,719+38%+30%
8Clark Construction of Texas, Inc.$7,644,915+50%+41%
TxDOT contract A00061184: bids by rank

Engineer's estimate: $5,431,676.

Bid tabulation

LinePay itemUnitQuantityEstimate1. Hunter Industries, LTD.2. Texas Materials Group, Inc.3. D&S Concrete Contractors LLC4. Joe Bland Construction LLC5. Aaron Concrete Contractors, LLC6. Dan Williams Company
1Preparing row (100-7002)STA169$1,150.00$388.50$385.00$500.00$750.00$229.00$3,350.00
2Removing concrete (driveways) (104-7011)SY127$20.00$19.62$32.00$40.00$28.00$40.00$15.00
3Remove (2"-8") TRT/untrt base & asphalt pavement (105-7053)SY12,084$4.00$3.00$4.25$9.00$4.00$7.50$3.50
4Excavation (roadway) (110-7001)CY14,690$14.00$13.11$14.50$24.00$8.00$14.00$12.00
5Embankment (final)(OC)(type B) (132-7003)CY9,687$13.50$13.11$14.50$27.00$6.00$11.00$24.00
6Furn & place topsoil (4") (160-7002)SY69,282$1.50$0.87$1.25$0.40$1.00$3.00$1.50
7Broadcast seed (permanent_rural_sand) (164-7001)SY69,282$0.20$0.21$0.20$0.25$0.25$0.26$0.20
8Broadcast seed (temporary_warm) (164-7005)SY69,282$0.20$0.10$0.10$0.25$0.15$0.13$0.10
9Broadcast seed (temporary_cool) (164-7006)SY69,282$0.20$0.11$0.11$0.25$0.15$0.14$0.11
10Vegetative watering (168-7001)TGL1,164$10.00$22.75$2.00$4.00$20.00$57.00$22.00
11Soil ret BLKT(SL_mod_clay_short) (169-7001)SY69,282$0.75$1.25$1.20$1.20$1.25$2.00$1.20
12FL BS (compacted in place)(type D GR 5)(final pos) (247-7191)CY13,819$57.50$59.83$74.00$27.00$69.00$106.00$85.00
13Prime coat (multi option) (310-7015)GAL9,335$3.90$4.65$4.15$4.00$4.00$5.00$4.00
14D-GR HMA type-C PG76-22 (341-7030)TON5,135$107.50$93.61$97.40$130.00$128.00$124.00$105.00
15D-GR HMA type D PG76-22 (341-7056)TON7,597$112.50$93.61$105.00$125.00$132.00$133.00$110.00
16D-GR HMA type D PG76-22 (level-UP) (341-7059)TON1,362$115.00$97.98$107.50$135.00$150.00$134.00$115.00
17Tom-C PG76-22 sac-B (347-7002)TON4,863$125.00$116.71$97.00$140.00$160.00$176.00$145.00
18Flexible pavement structure repair(6") (351-7005)SY4,129$43.50$39.37$38.00$1.50$48.00$49.00$42.00
19Cut & restore asphalt paving (400-7008)SY12$125.00$210.02$95.00$76.00$200.00$375.00$300.00
20Cem stabil BKFL (400-7010)CY117$180.00$194.27$230.00$150.00$375.00$436.00$275.00
21Trench excavation protection (402-7001)LF48$10.00$12.60$20.50$12.00$105.00$2.00$3.00
22Riprap (concrete)(4 in) (432-7001)CY7$600.00$892.58$550.00$900.00$1,015.00$822.00$575.00
23Riprap (concrete)(5 in) (432-7002)CY82$550.00$997.59$397.00$900.00$625.00$700.00$450.00
24Riprap (mow strip)(4 in) (432-7013)CY46$625.00$945.08$605.00$900.00$745.00$727.00$700.00
25Riprap (stone common)(grout)(12 in) (432-7038)CY9$225.00$192.04$635.00$300.00$720.00$815.00$750.00
26Riprap (stone common)(grout)(18 in) (432-7039)CY52$275.00$250.39$280.00$250.00$315.00$359.00$350.00
27RC pipe (CL III)(18 in) (464-7003)LF202$85.00$65.11$108.00$110.00$115.00$147.00$90.00
28RC pipe (CL III)(24 in) (464-7005)LF57$115.00$141.76$192.00$128.00$175.00$169.00$165.00
29RC pipe (CL III)(30 in) (464-7007)LF107$125.00$204.77$255.00$155.00$215.00$149.00$165.00
30RC pipe (CL III)(36 in) (464-7009)LF19$180.00$236.27$566.00$200.00$295.00$286.00$435.00
31RC pipe (CL III)(48 in) (464-7011)LF13$260.00$341.28$855.00$350.00$450.00$449.00$650.00
32RC pipe (arch)(CL III)(des 1) (464-7040)LF688$195.00$236.27$203.50$300.00$255.00$209.00$183.00
33RC pipe (arch)(CL III)(des 3) (464-7042)LF98$275.00$299.28$218.00$350.00$315.00$237.00$210.00
34Set (type II) (18 in) (RCP) (6: 1) (P) (467-7308)EACH16$1,500.00$945.08$1,960.00$1,000.00$2,150.00$2,009.00$2,000.00
35Set (type II) (24 in) (RCP) (4: 1) (C) (467-7326)EACH2$2,100.00$2,100.18$2,100.00$2,400.00$2,875.00$1,968.00$2,000.00
36Set (type II) (24 in) (RCP) (6: 1) (P) (467-7328)EACH2$1,500.00$2,625.23$2,235.00$2,500.00$2,900.00$2,141.00$2,400.00
37Set (type II) (30 in) (RCP) (3: 1) (C) (467-7345)EACH2$3,000.00$3,360.29$4,075.00$3,000.00$3,425.00$2,008.00$2,600.00
38Set (type II) (30 in) (RCP) (4: 1) (C) (467-7346)EACH2$2,500.00$3,675.32$4,200.00$3,000.00$3,450.00$2,328.00$2,800.00
39Set (type II) (36 in) (RCP) (4: 1) (C) (467-7366)EACH2$4,000.00$5,250.45$6,300.00$4,000.00$5,150.00$3,834.00$4,000.00
40Set (type II) (48 in) (RCP) (4: 1) (C) (467-7390)EACH2$8,500.00$6,300.55$13,400$5,000.00$10,850$5,657.00$6,200.00
41Set (type II) (des 1) (RCP) (6: 1) (P) (467-7418)EACH50$1,250.00$1,260.11$2,240.00$3,500.00$7,250.00$2,129.00$2,000.00
42Set (type II) (des 3) (RCP) (6: 1) (P) (467-7434)EACH8$3,000.00$4,725.41$4,215.00$6,500.00$8,500.00$2,326.00$2,400.00
43Removing structure (set) (496-7004)EACH18$500.00$682.56$332.00$350.00$1,000.00$331.00$450.00
44Removing structure (pipe) (496-7007)LF48$20.00$42.00$22.00$10.00$50.00$22.00$35.00
45Remove STR (driveway culvert) (496-7038)EACH29$550.00$997.59$550.00$300.00$1,500.00$361.00$850.00
46Mobilization (500-7001)LS1$375,725$396,332$500,000$400,000$285,000$200,332$650,000
47Barricades, signs and traffic handling (502-7001)MO8$5,000.00$7,978.27$5,150.00$5,000.00$20,000$2,764.00$20,000
48Portable changeable message sign (503-7002)EACH2$10,000$3,642.52$2,000.00$4,000.00$12,750$10,812$15,000
49TMA (stationary) (505-7001)DAY36$200.00$156.11$25.00$500.00$390.00$415.00$200.00
50TMA (mobile operation) (505-7002)HR32$98.00$104.07$250.00$700.00$210.00$26.00$85.00
51Rock filter dams (install) (type 4) (506-7004)LF270$60.00$56.16$54.00$50.00$65.00$69.00$54.00
52Rock filter dams (remove) (506-7011)LF270$10.00$16.64$16.00$5.00$25.00$21.00$16.00
53Temporary sediment control fence (install) (506-7039)LF990$4.00$2.86$2.75$5.00$5.00$4.00$2.75
54Temporary sediment control fence (remove) (506-7041)LF990$1.00$0.99$0.95$1.00$1.00$1.00$0.95
55Biodegradable erosion control logs (install) (12") (506-7044)LF3,614$5.50$3.64$3.50$2.00$7.00$4.00$3.50
56Biodegradable erosion control logs (remove) (506-7046)LF3,614$1.10$1.04$1.00$0.50$2.00$1.00$1.00
57Constructing detours (508-7001)SY333$80.00$34.56$25.00$5.00$32.00$36.00$32.00
58Driveways (concrete) (530-7006)SY126$115.00$240.77$121.00$110.00$180.00$171.00$120.00
59Driveways (ACP) (530-7010)SY3,612$47.50$40.98$53.75$75.00$33.00$60.00$60.00
60Metal W-beam guard fence (timber post) (540-7001)LF825$27.00$25.49$25.00$32.00$28.00$30.00$30.00
61Downstream anchor terminal section (540-7015)EACH4$1,500.00$1,523.75$1,350.00$1,800.00$1,525.00$1,622.00$1,600.00
62Guardrail end treatment (install) (544-7001)EACH4$3,300.00$3,463.07$3,500.00$3,000.00$4,000.00$4,205.00$4,200.00
63Mailbox install-M (TWG-post) type 1 (560-7001)EACH2$675.00$520.00$520.00$500.00$650.00$631.00$525.00
64Mailbox install-S (TWG-post) type 2 (560-7002)EACH10$340.00$210.00$210.00$300.00$400.00$330.00$215.00
65Mailbox install-D (TWG-post) type 2 (560-7003)EACH4$350.00$220.00$220.00$300.00$350.00$360.00$220.00
66Install small roadside sign support and assembly type 10BWG(1)SA(P) (644-7001)EACH10$725.00$675.00$675.00$650.00$800.00$781.00$675.00
67Install small roadside sign support and assembly type 10BWG(1)SA(P-BM) (644-7002)EACH2$800.00$815.00$815.00$700.00$1,100.00$901.00$825.00
68Install small roadside sign support and assembly type 10BWG(1)SA(T) (644-7004)EACH16$725.00$730.00$730.00$750.00$975.00$901.00$735.00
69Install small roadside sign support and assembly type 10BWG(1)SA(U) (644-7007)EACH1$1,050.00$870.00$870.00$875.00$1,200.00$1,051.00$875.00
70Install small roadside sign support and assembly TYS80(1)SA(P-BM) (644-7026)EACH2$1,000.00$1,000.00$1,000.00$850.00$1,325.00$1,021.00$1,000.00
71Install small roadside sign support and assembly TYS80(1)SA(U) (644-7031)EACH1$1,215.00$1,100.00$1,100.00$1,000.00$1,400.00$1,201.00$1,100.00
72Remove SM RD SN sup&AM (644-7073)EACH34$100.00$100.00$100.00$100.00$55.00$120.00$105.00
73Install delineator assembly (D-SW)SZ 1(BRF)GF2(BI) (658-7019)EACH16$34.00$31.00$40.00$25.00$65.00$26.00$25.00
74Work zone pavement marking non-removing (W)24"(solid) (662-7017)LF48$2.75$4.00$4.00$4.00$8.00$5.00$4.00
75Work zone pavement marking removing (W)24"(solid) (662-7077)LF96$7.50$10.00$10.00$10.00$9.00$12.00$10.00
76Work zone pavement marking removing (Y)4"(solid) (662-7097)LF33,780$0.75$0.65$0.65$0.65$1.00$1.00$0.65
77Work zone pavement marking SHT terminal (tab)type Y-2 (662-7114)EACH422$1.00$1.60$1.75$1.00$1.25$2.00$2.35
78Reflectorized pavement marking type I (W)8"(solid)(100MIL) (666-7024)LF1,429$1.00$0.87$0.87$0.87$1.00$1.00$0.87
79Reflectorized pavement marking type I (W)24"(solid)(100MIL) (666-7036)LF50$7.00$10.00$10.00$10.00$22.00$12.00$10.00
80Reflectorized pavement marking type I (W)(arrow)(100MIL) (666-7042)EACH4$150.00$200.00$200.00$200.00$310.00$240.00$200.00
81Reflectorized pavement marking type I (W)(word)(100MIL) (666-7066)EACH4$175.00$200.00$200.00$200.00$330.00$240.00$200.00
82RE PV marking type I(black)6"(shadow)(090MIL) (666-7137)LF16,890$0.75$0.65$0.65$0.65$1.00$1.00$0.65
83Reflectorized pavement marking type II (W) 6" (solid) (666-7175)LF33,921$0.22$0.20$0.20$0.20$0.25$0.24$0.20
84Reflectorized pavement marking type II (W) 8" (solid) (666-7179)LF1,429$0.40$0.20$0.20$0.20$0.50$0.24$0.20
85Reflectorized pavement marking type II (W) 24" (solid) (666-7184)LF50$4.00$3.00$3.00$3.00$7.00$4.00$3.00
86Reflectorized pavement marking type II (W) (arrow) (666-7186)EACH4$65.00$50.00$50.00$50.00$85.00$60.00$50.00
87Reflectorized pavement marking type II (W) (word) (666-7194)EACH4$75.00$50.00$50.00$50.00$90.00$60.00$50.00
88Reflectorized pavement marking type II (Y) 6" (broken) (666-7211)LF5,690$0.22$0.20$0.20$0.20$0.50$0.25$0.20
89Reflectorized pavement marking type II (Y) 6" (solid) (666-7213)LF13,105$0.22$0.20$0.20$0.20$0.50$0.25$0.20
90Reflectorized profile pavement marking type I(W)6"(solid)(100MIL) (666-7266)LF33,921$0.75$0.70$0.70$0.70$1.15$1.00$0.70
91Reflectorized profile pavement marking type I(Y)6"(solid)(100MIL) (666-7270)LF13,105$0.60$0.70$0.70$0.70$1.15$1.00$0.70
92Reflectorized profile pavement marking type I(Y)6"(broken)(100MIL) (666-7274)LF5,690$0.75$0.75$0.75$0.75$1.20$1.00$0.75
93PRFB rumble strip (BLK)(1')(centerline) (668-7002)LF2,845$8.50$3.50$3.50$3.50$4.00$4.00$3.50
94Reflectorized pavement marker type I-C (672-7002)EACH57$4.00$3.75$3.75$3.75$7.00$5.00$3.75
95Reflectorized pavement marker type II-A-A (672-7004)EACH845$4.00$3.75$3.75$3.75$6.50$5.00$3.75
96Bonding course (3007-7001)GAL15,724$3.25$3.37$4.00$4.00$4.00$5.00$4.25
97Subsurface util locate (non-paved area) (5061-7001)EACH4$650.00$1,250.00$1,500.00$250.00$7,250.00$1,655.00$700.00
TxDOT contract A00061184: unit prices by line, the 6 lowest bidders (all in the CSV)

The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.

Source

Read from TxDOT's tabulation for this contract. TxDOT Bid Tabulations open-data export (data.texas.gov) from September 2024, read 21 November 2026, and TxDOT's legacy Tabulation of Bids pages for January 2020 to August 2024. The legacy pages are a large sample, not every contract: their file names were reused from year to year. Their district is the one TxDOT gives the county. Bids that did not match their published total are left out.

Every contract let that day: TxDOT letting of September 3, 2026. Compiled by Mirage Metrics.

Your own bid history, read the same way

Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.

We use your email to reply to you and, now and then, to tell you about Mirage. You can opt out at any time. Privacy policy