TxDOT contract A00200789 bid tabulation

Hazard Elimination & Safety, IH 35 (Inner Loop Entrance to Westinghouse Rd Exit). Let by Texas DOT on July 1, 2026, Williamson, Austin District. 5 bids received; low bid $2,920,576 by Dan Williams Company, -5.2% against the engineer's estimate of $3,081,166.

Owner
Texas DOT
Letting
01 JUL 2026
Pay items
74
Data through
19 NOV 2026

Bidders

RankBidderTotal bidAgainst the low bidAgainst the estimate
1Dan Williams Company$2,920,576Low-5.0%
2Hunter Industries, LTD.$3,026,334+4.0%-2.0%
3Jordan Foster Construction, LLC$3,440,276+18%+12%
4Texas Materials Group, Inc.$3,869,101+32%+26%
5Aaron Concrete Contractors, LLC$4,482,897+53%+45%
TxDOT contract A00200789: bids by rank

Engineer's estimate: $3,081,166.

Bid tabulation

LinePay itemUnitQuantityEstimate1. Dan Williams Company2. Hunter Industries, LTD.3. Jordan Foster Construction, LLC4. Texas Materials Group, Inc.5. Aaron Concrete Contractors, LLC
1Preparing row (100-7002)STA82.44$1,500.00$550.00$438.91$2,855.00$169.00$160.00
2Removing concrete (mowstrip) (104-7005)LF260$10.00$10.00$9.90$12.00$25.00$7.00
3Excavation (roadway) (110-7001)CY8,216$15.00$12.00$12.10$12.75$15.00$31.00
4Embankment (final)(DC)(type C) (132-7006)CY6,217$15.00$12.00$12.10$16.50$8.50$47.00
5Furn & place topsoil (4") (160-7002)SY23,197$2.10$1.00$1.10$1.85$1.40$3.00
6Broadcast seed (temporary_warm_cool) (164-7007)SY11,602$0.25$0.36$0.17$0.17$0.17$0.25
7Drill seed (permanent_urban_clay) (164-7012)SY23,197$0.25$0.25$0.25$0.25$0.25$0.50
8Vegetative watering (168-7001)TGL390$7.00$10.00$26.24$40.00$45.00$58.00
9Soil ret BLKT(SL_mod_clay_long) (169-7002)SY23,197$1.25$0.90$1.26$1.25$1.26$2.00
10FL BS (compacted in place)(type A GR 5)(final pos) (247-7179)CY4,337$54.00$48.00$66.73$56.00$65.00$68.00
11Prime coat(MC-30 or AE-P) (310-7013)GAL2,230$5.00$3.65$4.76$3.65$4.80$5.00
12D-GR HMA type-B PG64-22 (341-7001)TON8,280$90.00$90.00$89.78$91.00$110.00$108.00
13D-GR HMA type D PG 76-22 (exempt) (341-7065)TON1,228$115.00$115.00$104.38$117.00$145.00$140.00
14PFC-C PG76-22 sac-A (342-7001)TON1,837$145.00$168.00$161.62$168.00$180.00$203.00
15Plane & text asphalt concrete pavement(0" to 2") (354-7002)SY9,265$2.00$1.75$2.20$1.70$6.00$2.00
16Drilled shaft (24 in) (416-7004)LF34$200.00$350.00$364.05$330.00$202.00$248.00
17Drilled shaft (48 in) (416-7008)LF58$530.00$800.00$830.49$750.00$806.00$989.00
18Riprap (concrete)(5 in) (432-7002)CY7$580.00$750.00$700.00$1,000.00$800.00$998.00
19Riprap (mow strip)(5 in) (432-7014)CY52$525.00$550.00$574.97$750.00$790.00$644.00
20Wingwall (PW - 2) (HW=10 FT) (466-7194)EACH1$45,000$41,500$50,000$58,000$75,000$71,559
21Removing structure (wingwall) (496-7005)EACH1$2,000.00$3,250.00$3,500.00$8,500.00$5,000.00$3,065.00
22Mobilization (500-7001)LS1$210,050$285,000$264,265$340,000$352,000$241,493
23Barricades, signs and traffic handling (502-7001)MO7$5,000.00$8,000.00$9,318.79$8,500.00$1,400.00$1,733.00
24Portable changeable message sign (503-7002)EACH2$7,500.00$8,500.00$4,173.02$10,500$18,000$10,432
25TMA (stationary) (505-7001)DAY174$150.00$80.00$156.49$1.00$12.00$287.00
26TMA (mobile operation) (505-7003)DAY68$175.00$1.00$312.98$1.00$1.00$367.00
27Rock filter dams (install) (type 1) (506-7001)LF103$40.00$30.00$27.31$27.00$26.00$35.00
28Rock filter dams (remove) (506-7011)LF103$21.00$10.00$15.76$15.50$15.00$20.00
29Temporary sediment control fence (install) (506-7039)LF8,220$3.50$3.75$3.15$3.10$3.00$4.00
30Temporary sediment control fence (remove) (506-7041)LF8,220$0.85$1.00$1.00$1.00$0.95$1.00
31Portable concrete traffic barrier (furnish and install)(single slope)(type 1) (512-7001)LF8,440$40.00$22.00$24.00$34.00$67.20$100.00
32Portable concrete traffic barrier (remove)(single slope)(type 1) (512-7049)LF8,440$14.00$7.50$10.50$17.00$28.90$13.00
33Metal W-beam guard fence (timber post) (540-7001)LF650$25.00$27.00$25.74$25.00$26.00$30.00
34Downstream anchor terminal section (540-7015)EACH3$1,500.00$1,500.00$1,418.23$1,400.00$1,417.50$1,657.00
35Remove metal beam guard fence (542-7001)LF200$3.10$1.65$1.58$1.60$1.58$2.00
36Remove terminal anchor section (542-7002)EACH1$250.00$137.50$131.32$130.00$131.25$153.00
37Remove downstream anchor terminal (542-7003)EACH1$250.00$137.50$131.32$130.00$131.25$153.00
38Guardrail end treatment (install) (544-7001)EACH3$3,100.00$4,000.00$3,666.38$3,600.00$3,664.50$4,283.00
39Crash cushion attenuator (move & reset) (545-7002)EACH1$1,375.00$1,000.00$892.96$850.00$892.50$1,043.00
40Crash cushion attenuator (remove) (545-7004)EACH1$850.00$1,000.00$525.27$500.00$525.00$614.00
41Cca (install)(N)(TL3)(work zone) (545-7018)EACH1$8,500.00$8,500.00$7,773.99$7,500.00$7,770.00$9,082.00
42Aluminum signs (type A) (636-7001)SF20$40.00$25.00$27.00$60.00$61.00$70.00
43Aluminum signs (type O) (636-7003)SF210$30.00$40.00$38.00$39.00$41.00$56.00
44Install small roadside sign support and assembly type 10BWG(1)SA(T) (644-7004)EACH1$1,032.00$900.00$800.00$1,100.00$1,160.25$1,356.00
45Install small roadside sign support and assembly TYS80(1)SA(T) (644-7028)EACH1$880.00$1,000.00$1,000.00$1,250.00$1,312.50$1,534.00
46Relocate SM RD SN sup&AM type 10BWG (644-7065)EACH4$950.00$475.00$350.00$600.00$820.05$959.00
47Relocate SM RD SN sup&AM type S80 (644-7067)EACH2$650.00$475.00$550.00$675.00$971.25$1,135.00
48Relocate lrsa (647-7002)EACH3$3,000.00$7,500.00$7,346.00$7,000.00$7,330.00$2,163.00
49Remove lrsa (647-7003)EACH1$500.00$1,000.00$595.91$575.00$595.00$806.00
50Install overhead sign support(30 FT cant)(circ tube) (650-7031)EACH2$89,000$125,000$109,107$103,000$109,000$145,000
51Install delineator assembly (D-SW)SZ 1(BRF)CTB (658-7012)EACH427$10.00$11.00$22.00$10.50$10.50$12.00
52Install delineator assembly (D-SW)SZ 1(BRF)GF2 (658-7018)EACH29$30.00$44.00$65.00$41.00$42.00$49.00
53Install OM SM RD sign (1-OM-PW)Y (658-7317)EACH7$32.00$65.00$12.00$55.00$33.60$39.00
54Install OM LG RD sign (2-OM-PW)Y (658-7321)EACH3$250.00$65.00$20.00$61.00$38.59$45.00
55Replace OM SM RD sign (1-OM-PW)Y (658-7323)EACH1$35.00$65.00$12.00$55.00$61.95$72.00
56Reflectorized pavement marking type I (W)8"(solid)(100MIL) (666-7024)LF898$1.00$0.85$0.85$0.95$1.00$1.00
57Reflectorized pavement marking type I (W)12"(solid)(100MIL) (666-7030)LF795$3.50$3.00$3.00$3.90$3.00$5.00
58Reflectorized pavement marking type I (W)(arrow)(100MIL) (666-7042)EACH4$195.00$150.00$150.00$180.00$170.00$215.00
59Reflectorized pavement marking type I (W)(word)(100MIL) (666-7066)EACH4$200.00$175.00$175.00$180.00$175.00$215.00
60Reflectorized pavement marking type II (W) 6" (solid) (666-7175)LF8,313$0.30$0.35$0.35$0.28$0.25$0.50
61Reflectorized pavement marking type II (W) 8" (solid) (666-7179)LF898$0.50$0.45$0.45$0.40$0.40$0.50
62Reflectorized pavement marking type II (W) 12" (DOT) (666-7180)LF1,785$0.50$1.50$1.50$0.75$1.50$1.00
63Reflectorized pavement marking type II (W) 12" (solid) (666-7182)LF795$1.90$2.50$2.50$2.45$1.50$3.00
64Reflectorized pavement marking type II (W) (arrow) (666-7186)EACH4$60.00$100.00$100.00$115.00$25.00$135.00
65Reflectorized pavement marking type II (W) (word) (666-7194)EACH4$60.00$100.00$100.00$115.00$25.00$135.00
66Reflectorized pavement marking type II (Y) 6" (solid) (666-7213)LF65$0.50$0.35$0.35$0.28$0.25$0.50
67Reflectorized profile pavement marking type I(W)6"(solid)(100MIL) (666-7266)LF8,313$0.75$1.00$1.00$1.55$0.75$2.00
68Reflectorized profile pavement marking type I(Y)6"(solid)(100MIL) (666-7270)LF65$1.00$1.00$1.00$1.60$1.00$2.00
69Reflectorized pavement marking type I (W)12"(DOT)(100MIL) (666-7424)LF1,785$2.90$2.00$2.00$1.65$2.25$2.00
70Reflectorized pavement marker type II-C-R (672-7006)EACH675$4.50$3.50$3.50$5.25$3.99$6.00
71Traffic button type W (672-7007)EACH5,766$3.75$3.25$3.25$3.50$3.90$4.00
72Tree removal (30" - 36" diameter) (752-7009)EACH1$215.00$2,500.00$4,950.00$2,400.00$4,800.00$1,841.00
73Underseal course (3006-7001)GAL4,083$3.60$3.75$4.54$3.80$4.75$5.00
74Bonding course (3007-7001)GAL3,011$3.00$3.25$3.24$3.40$4.25$4.00
TxDOT contract A00200789: unit prices by line

The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.

Source

Read from TxDOT's tabulation for this contract. TxDOT Bid Tabulations open-data export (data.texas.gov) from September 2024, read 21 November 2026, and TxDOT's legacy Tabulation of Bids pages for January 2020 to August 2024. The legacy pages are a large sample, not every contract: their file names were reused from year to year. Their district is the one TxDOT gives the county. Bids that did not match their published total are left out.

Every contract let that day: TxDOT letting of July 1, 2026. Compiled by Mirage Metrics.

Your own bid history, read the same way

Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.

We use your email to reply to you and, now and then, to tell you about Mirage. You can opt out at any time. Privacy policy