TxDOT contract A00193911 bid tabulation
Hazard Elimination & Safety, SH 249 (At Spring Cypress Rd to .). Let by Texas DOT on June 3, 2026, Harris, Houston District. 10 bids received; low bid $1,523,084 by Deco Contractors, Inc., -10.0% against the engineer's estimate of $1,692,028.
- Owner
- Texas DOT
- Letting
- 03 JUN 2026
- Pay items
- 86
- Data through
- 19 NOV 2026
Bidders
| Rank | Bidder | Total bid | Against the low bid | Against the estimate |
|---|---|---|---|---|
| 1 | Deco Contractors, Inc. | $1,523,084 | Low | -10% |
| 2 | Allstate Signal & Construction, LLC | $1,585,073 | +4.0% | -6.0% |
| 3 | Sice, Inc. | $1,629,033 | +7.0% | -4.0% |
| 4 | Vaca Underground Utilities Inc | $1,640,060 | +8.0% | -3.0% |
| 5 | Traf-Tex, Inc. | $1,716,953 | +13% | +1.0% |
| 6 | Statewide Traffic Signal Company | $1,755,251 | +15% | +4.0% |
| 7 | Creacom, Inc. | $1,773,896 | +16% | +5.0% |
| 8 | Third Coast Services LLC | $1,822,553 | +20% | +8.0% |
| 9 | Select Maintenance, L.L.C. | $2,188,190 | +44% | +29% |
| 10 | Structural Integrity Group LLC | $2,485,895 | +63% | +47% |
Engineer's estimate: $1,692,028.
Bid tabulation
| Line | Pay item | Unit | Quantity | Estimate | 1. Deco Contractors, Inc. | 2. Allstate Signal & Construction, LLC | 3. Sice, Inc. | 4. Vaca Underground Utilities Inc | 5. Traf-Tex, Inc. | 6. Statewide Traffic Signal Company |
|---|---|---|---|---|---|---|---|---|---|---|
| 1 | Removing concrete (sidewalk, ramp or shared use path) (104-7013) | SY | 210 | $65.00 | $95.00 | $32.76 | $51.39 | $18.00 | $94.55 | $31.00 |
| 2 | Drilled shaft (roadway illumination pole) (30 in) (416-7040) | LF | 8 | $185.00 | $206.00 | $162.53 | $290.00 | $307.00 | $255.00 | |
| 3 | Drilled shaft (traffic signal pole) (48 in) (416-7046) | LF | 264 | $475.00 | $425.00 | $410.00 | $491.22 | $337.00 | $663.00 | $530.00 |
| 4 | Mobilization (500-7001) | LS | 1 | $148,366 | $150,000 | $107,389 | $156,897 | $40,000 | $54,418 | $166,000 |
| 5 | Barricades, signs and traffic handling (502-7001) | MO | 15 | $4,000.00 | $1,750.00 | $1,964.20 | $2,040.43 | $2,000.00 | $591.00 | $1,000.00 |
| 6 | TMA (stationary) (505-7001) | DAY | 218 | $250.00 | $100.00 | $200.00 | $78.12 | $75.00 | $291.00 | $50.00 |
| 7 | Curb ramps (type 1) (531-7005) | EACH | 14 | $3,500.00 | $1,900.00 | $3,475.00 | $4,199.03 | $2,250.00 | $5,560.00 | $6,150.00 |
| 8 | Curb ramps (type 5) (531-7008) | EACH | 3 | $4,800.00 | $2,750.00 | $3,475.00 | $4,512.39 | $3,200.00 | $5,560.00 | $6,150.00 |
| 9 | Curb ramps (type 21) (531-7013) | EACH | 4 | $4,000.00 | $3,500.00 | $3,475.00 | $5,452.47 | $2,800.00 | $5,560.00 | $6,150.00 |
| 10 | Curb ramps (type 22) (531-7014) | EACH | 4 | $5,500.00 | $5,000.00 | $3,475.00 | $5,703.16 | $3,300.00 | $5,560.00 | $6,150.00 |
| 11 | In RD IL (type SA) 30T-8-8 (250W EQ) LED (610-7073) | EACH | 1 | $7,500.00 | $8,645.00 | $4,455.29 | $9,000.00 | $8,301.00 | $8,600.00 | |
| 12 | Conduit (PVC) (schedule 80) (2") (618-7054) | LF | 220 | $10.00 | $10.00 | $10.37 | $17.49 | $13.00 | $19.95 | $15.00 |
| 13 | Conduit (PVC) (schedule 80) (2") (bore) (618-7055) | LF | 545 | $18.00 | $19.00 | $14.37 | $17.06 | $12.00 | $26.20 | $15.00 |
| 14 | Conduit (PVC) (schedule 80) (3") (618-7060) | LF | 130 | $23.00 | $16.00 | $13.38 | $19.11 | $16.00 | $29.35 | $16.00 |
| 15 | Conduit (PVC) (schedule 80) (3") (bore) (618-7061) | LF | 1,035 | $28.00 | $26.00 | $18.88 | $18.64 | $14.00 | $43.40 | $16.00 |
| 16 | Conduit (PVC) (schedule 80) (4") (618-7064) | LF | 135 | $25.00 | $19.00 | $19.63 | $26.65 | $18.00 | $50.40 | $18.00 |
| 17 | Conduit (PVC) (schedule 80) (4") (bore) (618-7065) | LF | 1,625 | $33.00 | $30.00 | $21.63 | $22.72 | $20.00 | $48.00 | $18.00 |
| 18 | Electrical conductor (no.8) bare (620-7007) | LF | 3,610 | $1.80 | $1.95 | $2.06 | $1.25 | $2.00 | $2.00 | $1.62 |
| 19 | Electrical conductor (no.8) insulated (620-7008) | LF | 1,505 | $2.00 | $2.20 | $2.17 | $1.57 | $2.15 | $2.20 | $1.71 |
| 20 | Tray cable (4 conductor) (12 AWG) (621-7006) | LF | 5,560 | $3.00 | $2.30 | $3.45 | $2.62 | $3.50 | $4.05 | $3.00 |
| 21 | Ground box type D (162922) (624-7007) | EACH | 21 | $915.00 | $1,350.00 | $720.00 | $1,540.53 | $975.00 | $1,280.00 | $7,000.00 |
| 22 | Ground box type D (162922)W/apron (624-7008) | EACH | 8 | $1,200.00 | $1,400.00 | $1,022.50 | $1,934.43 | $1,400.00 | $1,381.00 | $1,600.00 |
| 23 | Remove ground box (624-7013) | EACH | 36 | $275.00 | $200.00 | $50.00 | $250.69 | $400.00 | $104.00 | $1,000.00 |
| 24 | Elc SRV type D 120/240 060(NS)SS(E)SP(O) (628-7148) | EACH | 2 | $8,000.00 | $5,500.00 | $6,810.00 | $8,217.39 | $7,500.00 | $8,554.00 | $6,710.00 |
| 25 | Aluminum signs (type A) (636-7001) | SF | 168 | $40.00 | $25.00 | $69.37 | $32.25 | $37.00 | $24.25 | $65.00 |
| 26 | Install small roadside sign support and assembly type 10BWG(1)SA(P) (644-7001) | EACH | 5 | $800.00 | $795.00 | $1,250.00 | $1,071.69 | $1,000.00 | $874.50 | $900.00 |
| 27 | Reflectorized pavement marking type I (W)6"(DOT)(100MIL) (666-7009) | LF | 1,108 | $2.15 | $2.00 | $1.05 | $0.98 | $1.25 | $0.90 | $0.80 |
| 28 | Reflectorized pavement marking type I (W)8"(solid)(100MIL) (666-7024) | LF | 6,112 | $1.50 | $2.85 | $1.31 | $1.88 | $1.55 | $1.70 | $1.53 |
| 29 | Reflectorized pavement marking type I (W)12"(solid)(100MIL) (666-7030) | LF | 1,297 | $5.00 | $4.85 | $3.41 | $4.39 | $3.85 | $3.90 | $3.58 |
| 30 | Reflectorized pavement marking type I (W)24"(solid)(100MIL) (666-7036) | LF | 1,752 | $9.00 | $9.15 | $9.35 | $7.67 | $10.50 | $6.80 | $6.24 |
| 31 | Reflectorized pavement marking type I (W)(arrow)(100MIL) (666-7042) | EACH | 33 | $170.00 | $205.00 | $194.25 | $31.34 | $230.00 | $28.00 | $26.00 |
| 32 | Reflectorized pavement marking type I(W)(double arrow)(100MIL) (666-7045) | EACH | 18 | $290.00 | $250.00 | $315.00 | $31.34 | $375.00 | $28.00 | $26.00 |
| 33 | Reflectorized pavement marking type I(W)(uturn arrow)(100MIL) (666-7051) | EACH | 8 | $175.00 | $285.00 | $315.00 | $31.34 | $375.00 | $28.00 | $26.00 |
| 34 | Reflectorized pavement marking type I (W)(word)(100MIL) (666-7066) | EACH | 58 | $200.00 | $215.00 | $199.50 | $31.34 | $230.00 | $28.00 | $26.00 |
| 35 | RE PV marking type I(black)6"(shadow)(100MIL) (666-7138) | LF | 910 | $3.00 | $3.00 | $2.63 | $1.51 | $3.00 | $1.35 | $1.23 |
| 36 | Reflectorized pavement marking type I (W)6"(broken)(100MIL) (666-7408) | LF | 995 | $1.50 | $1.45 | $1.05 | $1.51 | $1.25 | $1.35 | $1.23 |
| 37 | Reflectorized pavement marking type I (W)6"(solid)(100MIL) (666-7411) | LF | 2,154 | $1.00 | $1.45 | $1.05 | $0.94 | $1.25 | $0.85 | $0.77 |
| 38 | Prefabricated PM type C (W)(arrow) (668-7091) | EACH | 33 | $275.00 | $235.00 | $236.25 | $263.22 | $275.00 | $234.00 | $215.00 |
| 39 | Prefabricated PM type C (W)(double arrow) (668-7093) | EACH | 18 | $400.00 | $360.00 | $446.25 | $282.03 | $500.00 | $250.00 | $230.00 |
| 40 | Prefabricated PM type C (W)(uturn arrow) (668-7096) | EACH | 8 | $400.00 | $480.00 | $446.25 | $282.03 | $500.00 | $250.00 | $230.00 |
| 41 | Prefabricated PM type C (W)(word) (668-7103) | EACH | 58 | $300.00 | $305.00 | $357.00 | $269.49 | $410.00 | $239.00 | $220.00 |
| 42 | Reflectorized pavement marker type I-C (672-7002) | EACH | 616 | $5.50 | $6.50 | $5.51 | $7.52 | $6.25 | $6.70 | $6.12 |
| 43 | Eliminating existing PM & markers (6") (677-7002) | LF | 6,060 | $0.50 | $0.40 | $0.53 | $0.31 | $0.75 | $0.30 | $0.26 |
| 44 | Eliminating existing PM & markers (8") (677-7004) | LF | 5,445 | $1.50 | $0.70 | $0.68 | $0.38 | $0.85 | $0.35 | $0.31 |
| 45 | Eliminating existing PM & markers (12") (677-7006) | LF | 2,229 | $2.00 | $1.00 | $1.58 | $0.57 | $2.00 | $0.50 | $0.46 |
| 46 | Eliminating existing PM & markers (24") (677-7008) | LF | 1,061 | $5.00 | $2.05 | $3.15 | $0.83 | $3.75 | $0.75 | $0.68 |
| 47 | Eliminating existing PM & markers (arrow) (677-7009) | EACH | 25 | $70.00 | $40.00 | $36.75 | $31.34 | $41.00 | $28.00 | $26.00 |
| 48 | Eliminating existing PM & markers (double arrow) (677-7010) | EACH | 18 | $110.00 | $45.00 | $73.50 | $43.87 | $82.00 | $39.00 | $36.00 |
| 49 | Eliminating existing PM & markers (uturn arrow) (677-7012) | EACH | 8 | $60.00 | $45.00 | $73.50 | $56.41 | $82.00 | $50.00 | $46.00 |
| 50 | Eliminating existing PM & markers (word) (677-7015) | EACH | 58 | $85.00 | $40.00 | $36.75 | $31.34 | $41.00 | $28.00 | $26.00 |
| 51 | Pavement surface preparation for marking (6") (678-7002) | LF | 5,440 | $0.10 | $0.05 | $0.08 | $0.01 | $0.10 | $0.05 | $0.02 |
| 52 | Pavement surface preparation for marking (8") (678-7004) | LF | 6,112 | $0.20 | $0.15 | $0.11 | $0.03 | $0.15 | $0.05 | $0.03 |
| 53 | Pavement surface preparation for marking (12") (678-7006) | LF | 1,247 | $0.75 | $0.40 | $0.16 | $0.06 | $0.20 | $0.10 | $0.06 |
| 54 | Pavement surface preparation for marking (24") (678-7008) | LF | 1,752 | $1.00 | $0.80 | $0.32 | $0.15 | $0.40 | $0.15 | $0.13 |
| 55 | Pavement surface preparation for marking (arrow) (678-7009) | EACH | 25 | $15.00 | $20.00 | $73.50 | $12.54 | $9.00 | $11.00 | $11.00 |
| 56 | Pavement surface preparation for marking (double arrow) (678-7010) | EACH | 18 | $15.00 | $25.00 | $15.75 | $12.54 | $19.00 | $11.00 | $11.00 |
| 57 | Pavement surface preparation for marking (uturn arr) (678-7012) | EACH | 8 | $25.00 | $25.00 | $15.75 | $12.54 | $19.00 | $11.00 | $11.00 |
| 58 | Pavement surface preparation for marking (word) (678-7016) | EACH | 55 | $10.00 | $20.00 | $7.35 | $12.54 | $9.00 | $11.00 | $11.00 |
| 59 | Install highway traffic signal (system) (680-7003) | EACH | 2 | $45,000 | $30,000 | $29,624 | $33,567 | $40,000 | $45,650 | $43,000 |
| 60 | Removing traffic signals (diamond) (680-7012) | EACH | 2 | $9,500.00 | $5,000.00 | $5,000.00 | $7,182.30 | $5,000.00 | $7,560.00 | $26,000 |
| 61 | Vehicle signal section (12")LED(green) (682-7001) | EACH | 39 | $290.00 | $250.00 | $319.00 | $247.86 | $325.00 | $255.00 | $321.00 |
| 62 | Vehicle signal section (12")LED(green arrow) (682-7002) | EACH | 9 | $290.00 | $250.00 | $319.00 | $247.86 | $325.00 | $255.00 | $321.00 |
| 63 | Vehicle signal section (12")LED(yel) (682-7003) | EACH | 39 | $290.00 | $250.00 | $319.00 | $247.86 | $325.00 | $255.00 | $321.00 |
| 64 | Vehicle signal section (12")LED(yel arrow) (682-7004) | EACH | 9 | $290.00 | $250.00 | $319.00 | $247.86 | $325.00 | $255.00 | $321.00 |
| 65 | Vehicle signal section (12")LED(red) (682-7005) | EACH | 39 | $290.00 | $250.00 | $319.00 | $247.86 | $325.00 | $255.00 | $321.00 |
| 66 | Vehicle signal section (12")LED(red arrow) (682-7006) | EACH | 12 | $290.00 | $250.00 | $319.00 | $247.86 | $325.00 | $255.00 | $321.00 |
| 67 | Pedestrian signal section (LED)(countdown) (682-7018) | EACH | 32 | $600.00 | $525.00 | $720.00 | $631.19 | $700.00 | $629.00 | $762.00 |
| 68 | Backplate W/reflectorized border(4 sec) (682-7037) | EACH | 6 | $225.00 | $200.00 | $190.00 | $230.62 | $125.00 | $261.00 | $230.00 |
| 69 | Backplate W/reflectorized border(5 sec) (682-7038) | EACH | 3 | $275.00 | $235.00 | $240.00 | $261.96 | $150.00 | $290.00 | $270.00 |
| 70 | Backplate W/reflectorized border(3 sec) (682-7054) | EACH | 36 | $180.00 | $150.00 | $140.00 | $199.29 | $115.00 | $231.00 | $180.00 |
| 71 | Traffic signal CBL (type A)(12 AWG)(2 conductor) (684-7007) | LF | 10,325 | $2.00 | $2.10 | $1.90 | $1.55 | $2.05 | $2.20 | $1.65 |
| 72 | Traffic signal CBL (type A)(12 AWG)(4 conductor) (684-7009) | LF | 11,940 | $2.80 | $3.00 | $2.56 | $2.59 | $3.25 | $3.30 | $2.42 |
| 73 | Traffic signal CBL (type A)(12 AWG)(7 conductor) (684-7012) | LF | 10,220 | $4.00 | $4.40 | $3.85 | $3.83 | $5.00 | $4.70 | $3.34 |
| 74 | Ins traffic signal PL AM(S)1 arm(50') (686-7053) | EACH | 1 | $26,000 | $26,895 | $29,882 | $32,000 | $25,512 | $26,000 | |
| 75 | Ins traffic signal PL AM(S)1 arm(55')lum (686-7059) | EACH | 9 | $28,000 | $28,000 | $31,303 | $34,151 | $36,000 | $29,828 | $29,000 |
| 76 | Ins traffic signal PL AM(S)1 arm(60')lum (686-7063) | EACH | 1 | $30,000 | $29,500 | $32,089 | $35,130 | $38,000 | $30,692 | $30,000 |
| 77 | Ins traffic signal PL AM(S)1 arm(65')lum (686-7067) | EACH | 1 | $30,000 | $32,680 | $35,880 | $38,500 | $31,331 | $31,000 | |
| 78 | Pedestrian pole assembly (687-7001) | EACH | 28 | $2,000.00 | $1,875.00 | $1,850.00 | $2,585.90 | $3,250.00 | $3,652.00 | $2,300.00 |
| 79 | Pedestrian detect push button (APS) (688-7001) | EACH | 28 | $800.00 | $695.00 | $726.00 | $875.50 | $1,700.00 | $913.00 | $810.00 |
| 80 | Pedestrian detector controller unit (688-7003) | EACH | 2 | $3,500.00 | $3,500.00 | $3,465.00 | $4,547.02 | $5,000.00 | $3,975.00 | $2,900.00 |
| 81 | Subsurface util locate (non-paved area) (5061-7001) | EACH | 24 | $500.00 | $500.00 | $1,100.00 | $438.71 | $500.00 | $834.00 | $425.00 |
| 82 | Bbu system (external battery cabinet) (6007-7001) | EACH | 2 | $8,000.00 | $7,100.00 | $8,929.00 | $9,638.30 | $8,000.00 | $11,200 | $7,000.00 |
| 83 | RVDS (presence detection only) (6008-7001) | EACH | 12 | $6,000.00 | $6,250.00 | $9,883.00 | $6,218.16 | $11,000 | $5,110.00 | $5,000.00 |
| 84 | RVDS (advance detection only) (6008-7002) | EACH | 6 | $6,000.00 | $6,250.00 | $8,249.25 | $6,279.18 | $8,500.00 | $5,110.00 | $5,200.00 |
| 85 | Fiber optic patch panel (12 position) (6027-7005) | EACH | 2 | $1,150.00 | $4,500.00 | $2,410.00 | $836.05 | $2,000.00 | $441.00 | $6,300.00 |
| 86 | Relocate fiber optic cable (6027-7023) | LF | 70 | $25.00 | $2.00 | $40.00 | $6.27 | $4.00 | $24.20 | $20.00 |
The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.
Source
Read from TxDOT's tabulation for this contract. TxDOT Bid Tabulations open-data export (data.texas.gov) from September 2024, read 21 November 2026, and TxDOT's legacy Tabulation of Bids pages for January 2020 to August 2024. The legacy pages are a large sample, not every contract: their file names were reused from year to year. Their district is the one TxDOT gives the county. Bids that did not match their published total are left out.
Every contract let that day: TxDOT letting of June 3, 2026. Compiled by Mirage Metrics.