TxDOT contract A00223227 bid tabulation

MILL AND INLAY, US0059 (HOU, TRI, POLK, NAC & SHE MAINT SECTIONS to VARIOUS LOCATIONS). Let by Texas DOT on September 30, 2026, Nacogdoches, Lufkin District. 2 bids received; low bid $1,161,503 by Texas Materials Group, Inc., +16% against the engineer's estimate of $997,023.

Owner
Texas DOT
Letting
30 SEP 2026
Pay items
8
Data through
19 NOV 2026

Bidders

RankBidderTotal bidAgainst the low bidAgainst the estimate
1Texas Materials Group, Inc.$1,161,503Low+16%
2Drewery Construction Company, Incorporated$1,799,383+55%+80%
TxDOT contract A00223227: bids by rank

Engineer's estimate: $997,023.

Bid tabulation

LinePay itemUnitQuantityEstimate1. Texas Materials Group, Inc.2. Drewery Construction Company, Incorporated
1SP mixes SP-C sac-A PG76-22 (344-7030)TON4,000$180.00$218.05$380.00
2Planing asphalt concrete pavement (0" to 2-1/2") (354-7083)SY36,352$4.00$6.40$4.20
3Mobilization (callout) (500-7002)EACH3$20,000$7,811.29$7,500.00
4TMA (stationary) (505-7001)DAY50$400.00$203.45$675.00
5TMA (mobile operation) (505-7003)DAY20$500.00$100.00$900.00
6Work zone pavement marking removing (W)6"(broken) (662-7065)LF6,120$3.00$1.25$4.00
7Work zone pavement marking removing (Y)6"(solid) (662-7100)LF4,720$3.00$1.25$4.00
8Bonding course (3007-7001)GAL1,819$5.00$4.12$5.00
TxDOT contract A00223227: unit prices by line

The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.

Source

Read from TxDOT's tabulation for this contract. TxDOT Bid Tabulations open-data export (data.texas.gov) from September 2024, read 21 November 2026, and TxDOT's legacy Tabulation of Bids pages for January 2020 to August 2024. The legacy pages are a large sample, not every contract: their file names were reused from year to year. Their district is the one TxDOT gives the county. Bids that did not match their published total are left out.

Every contract let that day: TxDOT letting of September 30, 2026. Compiled by Mirage Metrics.

Your own bid history, read the same way

Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.

We use your email to reply to you and, now and then, to tell you about Mirage. You can opt out at any time. Privacy policy