TxDOT contract A00187424 bid tabulation

Rehabilitate Existing Roadway, FM 21 (SH 37 to Titus County Line). Let by Texas DOT on April 3, 2025, Franklin, Paris District. 9 bids received; low bid $9,113,599 by H. H. Howard & Sons, Inc., -26% against the engineer's estimate of $12,271,309.

Owner
Texas DOT
Letting
03 APR 2025
Pay items
120
Data through
19 NOV 2026

Bidders

RankBidderTotal bidAgainst the low bidAgainst the estimate
1H. H. Howard & Sons, Inc.$9,113,599Low-26%
2A. K. Gillis & Sons, LLC$10,271,133+13%-16%
3D. L. Lennon Incorporated - Contractor$10,838,112+19%-12%
4Highway 19 Construction LLC$11,015,181+21%-10%
5H. V. Caver, Inc.$11,301,762+24%-8.0%
6Baker & Company Construction, LLC$11,328,665+24%-8.0%
7CDM Holdings$11,389,762+25%-7.0%
8Longview Bridge and Road, LTD.$13,212,656+45%+8.0%
9Grey Sky Construction LLC$14,804,288+62%+21%
TxDOT contract A00187424: bids by rank

Engineer's estimate: $12,271,309.

Bid tabulation

LinePay itemUnitQuantityEstimate1. H. H. Howard & Sons, Inc.2. A. K. Gillis & Sons, LLC3. D. L. Lennon Incorporated - Contractor4. Highway 19 Construction LLC5. H. V. Caver, Inc.6. Baker & Company Construction, LLC
1Preparing row (100-7002)STA425$3,000.00$1,050.00$1,443.11$1,568.84$1,100.00$2,000.00$1,220.00
2Removing concrete (driveways) (104-7011)SY889$25.00$25.00$12.00$12.00$25.00$12.36$13.75
3Obliterating abandoned road (106-7002)SY2,392$25.00$16.00$17.38$38.00$35.00$8.00$14.90
4Excavation (channel) (110-7002)CY203$45.00$25.00$35.00$65.00$25.00$50.00$28.95
5Subgr widen (OC) (112-7001)STA274$250.00$200.00$225.00$311.00$350.00$750.00$346.00
6Embankment (vehicle)(OC)(type B) (132-7015)CY760$27.50$25.00$35.00$42.00$30.00$45.00$29.35
7Backfill (type A) (134-7001)STA425$325.00$500.00$407.05$453.00$500.00$325.00$246.00
8Road grader work (ord comp) (152-7001)STA383$300.00$150.00$225.00$312.00$350.00$400.00$170.00
9Broadcast seed (temporary_warm) (164-7005)SY117,884$0.25$0.18$0.20$0.17$0.18$0.12$0.19
10Broadcast seed (temporary_cool) (164-7006)SY117,884$0.25$0.17$0.20$0.16$0.18$0.17$0.20
11Straw/hay mulch seed(permanent_rural_sand) (164-7025)SY235,768$0.50$0.25$0.33$0.25$0.25$0.40$0.44
12Vegetative watering (168-7001)TGL1,415$20.00$1.00$5.00$25.00$50.00$1.00$1.00
13Soil ret BLKT(SL_steep_sand_long_roll) (169-7016)SY80$7.00$12.00$10.00$10.00$15.00$16.00$11.00
14Proof rolling (216-7001)HR46$100.00$100.00$100.17$75.00$100.00$165.00$141.50
15FL BS (compacted in place)(type A GR 4) (8") (247-7069)SY115,699$23.00$18.85$20.87$22.90$21.58$27.12$22.65
16Rework BS metal (type C)(8")(ord comp) (251-7051)SY103,719$3.50$3.10$2.35$5.89$1.80$3.50$5.25
17Cement (275-7001)TON1,350$270.00$250.00$245.00$275.00$250.00$244.00$302.50
18Cement TRT (existing material & new base)(10") (275-7008)SY11,950$3.00$4.00$2.35$3.30$4.50$4.00$5.55
19Cement TRT (new base)(6") (275-7010)SY103,749$3.00$3.00$2.35$3.30$3.50$3.50$5.80
20Fog seal (CSS-1H) (315-7004)GAL22,063$7.00$3.85$4.56$4.00$4.25$6.01$5.10
21Asphalt (CHFRS-2P) (316-7008)GAL132,381$4.25$4.35$5.06$5.50$4.65$5.56$5.75
22Asphalt (RC-250) (316-7016)GAL41,186$8.00$5.25$5.69$7.50$5.53$6.54$5.95
23Aggregate (type-B, GR-4)(sac-A) (316-7099)CY1,226$205.00$120.00$156.81$132.70$209.00$116.10$118.00
24Aggregate (type-B, GR-3)(sac-B) (316-7171)CY1,401$160.00$120.00$156.81$132.70$209.00$116.10$118.00
25Aggregate (type-B or L, GR-5) (316-7251)CY1,051$300.00$110.00$144.61$120.20$200.00$104.00$108.00
26SP mixes SP-C sac-A PG64-22 (344-7010)TON1,966$140.00$140.00$139.30$139.30$153.00$140.00$148.00
27Flexible pavement structure repair(8") (351-7007)SY1,750$100.00$71.00$93.05$88.05$92.00$70.80$100.00
28Plane & text asphalt concrete pavement(0" to 2") (354-7002)SY1,200$10.00$12.00$6.20$6.50$10.00$10.00$6.90
29Flowable backfill (401-7001)CY79$260.00$400.00$275.00$275.00$350.00$283.25$355.00
30Trench excavation protection (402-7001)LF220$24.00$25.00$15.00$15.00$10.00$15.45$20.00
31Temporary special shoring (403-7001)SF170$40.00$110.00$10.00$100.00$55.00$42.50$86.00
32Riprap (concrete)(5 in) (432-7002)CY3.50$650.00$600.00$700.00$700.00$1,000.00$721.00$1,375.00
33Riprap (mow strip)(4 in) (432-7013)CY178$600.00$675.00$675.00$675.00$550.00$695.25$633.00
34Riprap (stone protection)(12 in) (432-7041)CY210$230.00$300.00$293.54$290.00$180.00$228.00$155.00
35Joint sealant (454-7010)LF2,263$25.00$25.00$20.00$22.00$35.00$22.00$46.00
36Concrete box culvert (4 FT X 2 FT)(extend) (462-7058)LF7$650.00$700.00$1,000.00$1,000.00$1,000.00$1,030.00$825.00
37Concrete box culvert (4 FT X 3 FT)(extend) (462-7059)LF23$1,050.00$725.00$1,050.00$1,050.00$600.00$1,081.50$880.00
38Concrete box culvert (5 FT X 3 FT)(extend) (462-7062)LF6$920.00$750.00$1,150.00$1,150.00$1,000.00$1,184.50$1,045.00
39Concrete box culvert (7 FT X 5 FT)(extend) (462-7072)LF14$815.00$1,300.00$1,400.00$1,400.00$1,000.00$1,442.00$1,210.00
40RC pipe (CL III)(18 in) (464-7003)LF3,140$50.00$50.00$52.00$52.00$46.00$48.00$65.00
41RC pipe (CL III)(24 in) (464-7005)LF142$90.00$80.00$90.00$90.00$62.00$75.00$92.00
42RC pipe (CL III)(30 in) (464-7007)LF30$125.00$120.00$120.00$120.00$100.00$123.60$206.00
43RC pipe (CL III)(36 in) (464-7009)LF34$165.00$160.00$175.00$175.00$180.00$180.25$220.00
44RC pipe (CL III)(42 in) (464-7010)LF22$215.00$250.00$220.00$220.00$210.00$226.60$317.00
45Headwall (CH - FW - 0) (diameter= 24 in) (466-7005)EACH2$5,000.00$8,000.00$6,000.00$6,000.00$6,000.00$6,180.00$6,325.00
46Headwall (CH - FW - 0) (diameter= 36 in) (466-7009)EACH2$6,000.00$11,000$8,500.00$8,500.00$9,500.00$8,755.00$10,505
47Headwall (CH - FW - 15) (diameter= 42 in) (466-7025)EACH2$12,000$15,000$10,000$10,000$12,500$10,300$13,530
48Headwall (CH - PW - 0) (diameter= 30 in) (466-7103)EACH2$8,600.00$9,000.00$8,000.00$8,000.00$9,000.00$8,240.00$8,775.00
49Headwall (CH - PW - 0) (diameter= 36 in) (466-7105)EACH2$11,000$12,000$10,000$10,000$7,500.00$10,300$10,995
50Headwall (CH - PW - 0) (diameter= 42 in) (466-7106)EACH2$19,000$15,000$12,000$12,000$9,500.00$12,360$14,025
51Headwall (CH - PW - S) (diameter= 24 in) (466-7116)EACH1$7,500.00$8,000.00$7,000.00$7,000.00$4,500.00$7,210.00$6,435.00
52Headwall (CH - PW - S) (diameter= 30 in) (466-7118)EACH1$9,400.00$9,500.00$8,500.00$8,500.00$5,500.00$8,755.00$8,800.00
53Headwall (CH - PW - S) (diameter= 36 in) (466-7120)EACH2$11,000$18,000$11,000$11,000$6,000.00$11,330$12,320
54Wingwall (FW - 0) (HW=4 FT) (466-7146)EACH1$9,300.00$12,000$7,000.00$7,000.00$10,177$7,210.00$10,780
55Wingwall (FW - S) (HW=5 FT) (466-7161)EACH4$18,000$13,000$10,000$10,000$11,000$10,300$13,750
56Wingwall (FW - S) (HW=6 FT) (466-7162)EACH2$20,000$15,000$12,000$12,000$13,367$12,360$20,350
57Wingwall (PW - 2) (HW=4 FT) (466-7188)EACH1$11,500$11,500$14,000$14,000$9,000.00$14,420$14,850
58Set (type I)(S= 4 FT)(HW= 4 FT)(4:1)(C) (467-7072)EACH1$8,800.00$11,500$10,000$10,000$12,000$10,300$15,440
59Set (type I)(S= 4 FT)(HW= 5 FT)(4:1)(C) (467-7076)EACH1$13,000$11,500$12,000$12,000$15,000$12,360$16,840
60Set (type II) (18 in) (RCP) (3: 1) (C) (467-7305)EACH2$1,000.00$800.00$750.00$750.00$700.00$685.00$1,480.00
61Set (type II) (18 in) (RCP) (6: 1) (P) (467-7308)EACH251$800.00$750.00$825.00$825.00$800.00$795.00$920.00
62Set (type II) (24 in) (RCP) (3: 1) (C) (467-7325)EACH1$1,600.00$1,500.00$1,200.00$1,200.00$1,000.00$1,055.00$1,745.00
63Set (type II) (24 in) (RCP) (4: 1) (C) (467-7326)EACH6$1,900.00$1,200.00$1,200.00$1,200.00$1,100.00$1,160.00$1,810.00
64Set (type II) (24 in) (RCP) (6: 1) (P) (467-7328)EACH12$2,000.00$1,600.00$1,500.00$1,500.00$1,325.00$1,375.00$2,010.00
65Set (type II) (30 in) (RCP) (4: 1) (C) (467-7346)EACH3$2,600.00$2,000.00$2,000.00$2,000.00$2,000.00$2,060.00$2,645.00
66Set (type II) (30 in) (RCP) (6: 1) (P) (467-7348)EACH2$3,200.00$5,000.00$5,000.00$5,000.00$4,000.00$5,150.00$4,140.00
67Set (type II) (36 in) (RCP) (3: 1) (C) (467-7365)EACH1$3,800.00$4,000.00$2,800.00$2,800.00$2,500.00$2,884.00$3,755.00
68Set (type II) (36 in) (RCP) (4: 1) (C) (467-7366)EACH8$4,800.00$4,000.00$5,000.00$5,000.00$3,600.00$5,150.00$4,288.00
69Set (type II) (36 in) (RCP) (6: 1) (P) (467-7368)EACH1$6,000.00$10,000$7,000.00$7,000.00$6,000.00$7,210.00$6,837.00
70Set (type II) (des 1) (RCP) (4: 1) (C) (467-7416)EACH1$4,000.00$5,000.00$7,500.00$7,500.00$5,000.00$7,725.00$6,837.00
71Clean existing culverts (480-7001)EACH4$2,500.00$1,000.00$1,200.00$1,200.00$2,500.00$1,236.00$1,019.00
72Removing structure (wingwall) (496-7005)EACH10$2,000.00$1,000.00$1,000.00$1,000.00$1,000.00$1,030.00$2,615.00
73Removing structure (headwall) (496-7006)EACH17$2,000.00$750.00$1,000.00$1,000.00$500.00$1,030.00$719.00
74Removing structure (pipe) (496-7007)LF120$50.00$20.00$10.00$10.00$50.00$10.30$34.00
75Removing structure (pipe) (496-7037)EACH112$600.00$500.00$225.00$225.00$500.00$426.00$364.00
76Mobilization (500-7001)LS1$1,116,748$475,000$816,387$455,500$1,200,000$503,000$610,000
77Barricades, signs and traffic handling (502-7001)MO24$6,500.00$4,000.00$8,700.00$3,686.36$12,018$4,000.00$12,000
78Portable changeable message sign (503-7002)EACH2$14,000$15,000$19,500$20,000$15,000$5,000.00$16,500
79TMA (stationary) (505-7001)DAY740$125.00$100.00$150.00$235.00$100.00$250.00$305.00
80TMA (mobile operation) (505-7003)DAY20$300.00$500.00$150.00$150.00$1,000.00$250.00$1,507.00
81Rock filter dams (install) (type 2) (506-7002)LF1,995$60.00$45.00$70.00$35.00$45.00$35.00$50.00
82Rock filter dams (remove) (506-7011)LF1,995$35.00$10.00$15.00$10.00$10.00$10.00$11.00
83Temporary sediment control fence (install) (506-7039)LF2,145$6.00$5.00$5.00$3.20$5.00$3.20$3.60
84Temporary sediment control fence (remove) (506-7041)LF2,145$1.60$1.00$2.50$0.70$1.00$0.70$1.10
85Driveways (concrete) (530-7006)SY889$114.00$100.00$95.00$110.00$110.00$97.85$237.00
86Driveways (ACP) (530-7010)SY3,234$62.00$40.00$56.57$40.55$50.00$42.55$63.00
87Driveways (ACP) (type 1) (530-7011)SY2,065$75.00$100.00$95.45$110.45$110.00$110.45$91.50
88Driveways (base) (530-7015)SY9,600$36.00$18.00$31.02$34.00$25.00$42.93$14.50
89Turnouts (ACP) (530-7018)SY2,001$86.00$100.00$103.50$118.50$113.00$118.50$110.00
90Metal W-beam guard fence (steel post) (540-7002)LF762.50$32.00$30.00$25.00$25.00$28.00$25.00$27.50
91Metal beam guard fence (long span system) (540-7027)EACH6$850.00$1,250.00$1,225.00$1,225.00$1,500.00$1,225.00$1,350.00
92Guardrail end treatment (install) (544-7001)EACH12$3,500.00$3,100.00$2,975.00$2,975.00$3,250.00$2,975.00$3,275.00
93Mailbox install-M (TWG-post) type 1 (560-7001)EACH2$650.00$700.00$475.00$735.00$790.00$688.04$735.00
94Mailbox install-S (TWG-post) type 2 (560-7002)EACH69$330.00$330.00$185.00$355.00$350.00$336.81$360.00
95Mailbox install-D (TWG-post) type 2 (560-7003)EACH12$370.00$375.00$220.00$400.00$355.00$383.16$410.00
96Install small roadside sign support and assembly type 10BWG(1)SA(P) (644-7001)EACH87$700.00$645.00$625.00$700.00$650.00$659.20$704.00
97Install small roadside sign support and assembly type 10BWG(1)SA(T) (644-7004)EACH5$850.00$775.00$780.00$900.00$745.00$795.16$850.00
98Install small roadside sign support and assembly type 10BWG(1)SA(T-2EXT) (644-7005)EACH1$1,200.00$1,200.00$1,100.00$1,500.00$860.00$1,223.64$1,307.00
99Install small roadside sign support and assembly type 10BWG(1)SA(U) (644-7007)EACH3$1,000.00$1,050.00$950.00$1,300.00$1,200.00$1,058.84$1,130.00
100Install small roadside sign support and assembly TYS80(1)SA(T-2EXT) (644-7029)EACH5$1,000.00$1,075.00$1,010.00$1,400.00$1,270.00$1,100.04$1,175.00
101Install small roadside sign support and assembly TYS80(1)SA(U) (644-7031)EACH5$1,000.00$1,010.00$875.00$1,300.00$1,230.00$1,037.21$1,108.00
102Install small roadside sign support and assembly TYS80(1)SA(U-BM) (644-7034)EACH10$1,000.00$1,200.00$965.00$1,600.00$1,500.00$1,226.73$1,310.00
103Install small roadside sign support and assembly TYS80(1)SA(U-WC) (644-7035)EACH4$1,000.00$1,200.00$990.00$1,700.00$1,600.00$1,202.01$1,285.00
104Install delineator assembly (D-SW)SZ 1(BRF)GF2(BI) (658-7019)EACH20$35.00$30.00$31.00$31.00$20.00$31.00$34.00
105Install object marker assembly (OM-2Y)(WC)GND (658-7056)EACH72$75.00$85.00$75.00$91.00$55.00$82.40$88.00
106Work zone pavement marking non-removing (Y)6"(broken) (662-7036)LF7,314$0.50$0.50$0.50$0.50$0.50$0.51$0.55
107Work zone pavement marking non-removing (Y)6"(solid) (662-7038)LF50,157$1.00$0.50$0.50$0.50$0.50$0.51$0.55
108Work zone pavement marking SHT terminal (tab)type Y-2 (662-7114)EACH4,244$2.00$2.50$2.45$2.00$1.00$1.50$2.25
109Reflectorized pavement marking type I (W)8"(DOT)(100MIL) (666-7018)LF69$6.00$2.00$2.00$2.00$2.00$2.02$2.20
110Reflectorized pavement marking type I (W)8"(solid)(100MIL) (666-7024)LF750$3.00$2.00$1.00$1.00$7.00$1.01$1.10
111Reflectorized pavement marking type I (W)24"(solid)(100MIL) (666-7036)LF268$11.00$7.00$7.00$7.00$7.00$7.07$7.70
112Reflectorized pavement marking type I (W)(arrow)(100MIL) (666-7042)EACH2$250.00$150.00$150.00$150.00$150.00$151.50$165.00
113Reflectorized pavement marking type I (W)(word)(100MIL) (666-7066)EACH2$260.00$175.00$175.00$175.00$175.00$176.75$192.50
114Ref pavement marking type I(W)36"(yld tri)(100MIL) (666-7090)EACH6$60.00$100.00$100.00$100.00$100.00$101.00$110.00
115Reflectorized profile pavement marking type I(W)6"(solid)(100MIL) (666-7266)LF84,916$1.25$0.90$0.90$0.90$0.90$0.91$1.00
116Reflectorized profile pavement marking type I(Y)6"(solid)(100MIL) (666-7270)LF50,157$1.50$0.90$0.90$0.90$0.90$0.91$1.00
117Reflectorized profile pavement marking type I(Y)6"(broken)(100MIL) (666-7274)LF7,314$1.39$1.20$1.20$1.20$1.20$1.21$1.30
118Reflectorized pavement marker type I-C (672-7002)EACH46$10.00$6.00$6.00$6.00$6.00$6.06$6.60
119Reflectorized pavement marker type II-A-A (672-7004)EACH1,112$8.50$5.00$5.00$5.00$5.00$5.05$5.50
120Underseal course (3006-7001)GAL4,471$7.00$7.45$7.40$7.40$7.40$7.40$7.35
TxDOT contract A00187424: unit prices by line, the 6 lowest bidders (all in the CSV)

The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.

Source

Read from TxDOT's tabulation for this contract. TxDOT Bid Tabulations open-data export (data.texas.gov) from September 2024, read 21 November 2026, and TxDOT's legacy Tabulation of Bids pages for January 2020 to August 2024. The legacy pages are a large sample, not every contract: their file names were reused from year to year. Their district is the one TxDOT gives the county. Bids that did not match their published total are left out.

Every contract let that day: TxDOT letting of April 3, 2025. Compiled by Mirage Metrics.

Your own bid history, read the same way

Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.

We use your email to reply to you and, now and then, to tell you about Mirage. You can opt out at any time. Privacy policy