TxDOT contract A00138848 bid tabulation
Rehabilitate Existing Roadway, SH 34 (SH 276 to Kaufman County Line). Let by Texas DOT on March 5, 2025, Hunt, Paris District. 5 bids received; low bid $9,373,273 by CDM Holdings, -4.3% against the engineer's estimate of $9,799,031.
- Owner
- Texas DOT
- Letting
- 05 MAR 2025
- Pay items
- 62
- Data through
- 19 NOV 2026
Bidders
| Rank | Bidder | Total bid | Against the low bid | Against the estimate |
|---|---|---|---|---|
| 1 | CDM Holdings | $9,373,273 | Low | -4.0% |
| 2 | D. L. Lennon Incorporated - Contractor | $10,827,326 | +16% | +10% |
| 3 | Grey Sky Construction LLC | $11,336,940 | +21% | +16% |
| 4 | Texas Materials Group, Inc. | $13,203,159 | +41% | +35% |
| 5 | A. K. Gillis & Sons, LLC | $15,528,490 | +66% | +58% |
Engineer's estimate: $9,799,031.
Bid tabulation
| Line | Pay item | Unit | Quantity | Estimate | 1. CDM Holdings | 2. D. L. Lennon Incorporated - Contractor | 3. Grey Sky Construction LLC | 4. Texas Materials Group, Inc. | 5. A. K. Gillis & Sons, LLC |
|---|---|---|---|---|---|---|---|---|---|
| 1 | Preparing row (100-7002) | STA | 266.84 | $75.00 | $999.00 | $1,834.70 | $3,745.00 | $200.00 | $1,643.00 |
| 2 | Remove (0"-6") TRT/untrt base & asphalt pavement (105-7046) | SY | 104,646.67 | $4.85 | $3.00 | $7.65 | $6.00 | $6.00 | $5.50 |
| 3 | Excavation (channel) (110-7002) | CY | 16 | $75.00 | $100.00 | $150.00 | $50.00 | $400.00 | $500.00 |
| 4 | Backfill (type B) (134-7002) | STA | 266.84 | $80.00 | $200.00 | $380.00 | $250.00 | $330.00 | $600.00 |
| 5 | Road grader work (ord comp) (152-7001) | STA | 266.84 | $188.00 | $100.00 | $350.00 | $250.00 | $200.00 | $600.00 |
| 6 | Broadcast seed (temporary_warm) (164-7005) | SY | 83,017 | $0.15 | $0.15 | $0.20 | $0.50 | $0.13 | $0.20 |
| 7 | Broadcast seed (temporary_cool) (164-7006) | SY | 83,017 | $0.15 | $0.15 | $0.20 | $0.50 | $0.13 | $0.20 |
| 8 | Straw/hay mulch seed(permanent_rural_clay) (164-7026) | SY | 166,034 | $0.35 | $0.30 | $0.40 | $0.75 | $0.39 | $0.60 |
| 9 | Vegetative watering (168-7001) | TGL | 997 | $17.00 | $30.00 | $35.00 | $50.00 | $40.00 | $10.00 |
| 10 | FL BS (compacted in place)(type A GR 4) (6") (247-7046) | SY | 130,460 | $21.00 | $17.50 | $23.32 | $16.00 | $22.00 | $31.35 |
| 11 | Rework BS metal (type B)(10")(ord comp) (251-7021) | STA | 266.84 | $2,165.00 | $750.00 | $640.00 | $550.00 | $500.00 | $2,750.00 |
| 12 | Cement (275-7001) | TON | 800 | $285.00 | $275.00 | $260.00 | $300.00 | $300.00 | $245.00 |
| 13 | Cement TRT (new base)(6") (275-7010) | SY | 130,460 | $3.15 | $3.00 | $3.64 | $6.00 | $3.00 | $5.75 |
| 14 | Prime coat (MC-30) (310-7004) | GAL | 36,528.80 | $2.00 | $6.00 | $5.00 | $5.00 | $4.00 | $8.36 |
| 15 | D-GR HMA type-C sac-A PG70-22 (341-7023) | TON | 14,350.60 | $138.00 | $121.00 | $126.19 | $165.00 | $218.00 | $180.18 |
| 16 | Planing asphalt concrete pavement(0" to 8") (354-7036) | SY | 130,460 | $2.85 | $5.00 | $3.88 | $7.00 | $6.00 | $5.50 |
| 17 | Riprap (mow strip)(4 in) (432-7013) | CY | 39 | $385.00 | $700.00 | $650.00 | $550.00 | $600.00 | $650.00 |
| 18 | Riprap (stone common)(dry)(12 in) (432-7031) | CY | 54 | $170.00 | $285.00 | $350.00 | $150.00 | $350.00 | $494.52 |
| 19 | Headwall (CH - FW - 0) (diameter= 36 in) (466-7009) | EACH | 1 | $3,985.00 | $11,500 | $10,000 | $16,500 | $9,500.00 | $10,000 |
| 20 | Set (type II) (36 in) (RCP) (4: 1) (C) (467-7366) | EACH | 1 | $2,680.00 | $5,050.00 | $7,000.00 | $6,500.00 | $8,000.00 | $7,000.00 |
| 21 | Clean existing culverts (480-7001) | EACH | 10 | $800.00 | $2,000.00 | $1,200.00 | $1,500.00 | $4,000.00 | $1,200.00 |
| 22 | Mobilization (500-7001) | LS | 1 | $890,821 | $900,000 | $806,600 | $1,100,000 | $1,300,000 | $1,190,139 |
| 23 | Barricades, signs and traffic handling (502-7001) | MO | 20 | $4,500.00 | $14,500 | $6,578.00 | $8,500.00 | $77,000 | $56,100 |
| 24 | Portable changeable message sign (503-7002) | EACH | 4 | $10,000 | $15,000 | $20,000 | $20,000 | $25,000 | $19,500 |
| 25 | TMA (stationary) (505-7001) | DAY | 312 | $278.00 | $500.00 | $300.00 | $250.00 | $500.00 | $500.00 |
| 26 | TMA (mobile operation) (505-7002) | HR | 138 | $48.00 | $1.00 | $75.00 | $55.00 | $80.00 | $500.00 |
| 27 | Rock filter dams (install) (type 2) (506-7002) | LF | 1,200 | $22.90 | $51.00 | $45.00 | $40.00 | $65.00 | $75.00 |
| 28 | Rock filter dams (remove) (506-7011) | LF | 1,200 | $5.42 | $20.00 | $10.00 | $10.00 | $12.00 | $20.00 |
| 29 | Temporary sediment control fence (install) (506-7039) | LF | 1,530 | $3.15 | $4.00 | $5.00 | $4.00 | $5.00 | $7.00 |
| 30 | Temporary sediment control fence (remove) (506-7041) | LF | 1,530 | $1.25 | $2.00 | $1.00 | $2.00 | $1.00 | $5.00 |
| 31 | Mill rumble strips (asphalt) (centerline) (533-7002) | LF | 20,004 | $0.72 | $0.15 | $3.19 | $0.30 | $0.19 | $2.00 |
| 32 | Mill rumble strips (concrete) (shoulder) (533-7003) | LF | 40,000 | $0.72 | $0.75 | $4.19 | $0.30 | $0.19 | $2.00 |
| 33 | Metal W-beam guard fence (steel post) (540-7002) | LF | 680 | $33.00 | $29.00 | $28.75 | $30.00 | $34.00 | $27.00 |
| 34 | Metal beam guard fence trans (thrie-beam) (540-7005) | EACH | 4 | $1,866.00 | $2,350.00 | $2,300.00 | $1,850.00 | $3,750.00 | $3,900.00 |
| 35 | Metal beam guard fence (long span system) (540-7027) | EACH | 27 | $730.00 | $1,290.00 | $1,200.00 | $1,500.00 | $1,300.00 | $1,300.00 |
| 36 | Remove metal beam guard fence (542-7001) | LF | 550 | $8.50 | $2.50 | $2.50 | $5.00 | $5.00 | $4.00 |
| 37 | Remove terminal anchor section (542-7002) | EACH | 4 | $385.00 | $200.00 | $150.00 | $500.00 | $250.00 | $400.00 |
| 38 | Guardrail end treatment (install) (544-7001) | EACH | 3 | $185.00 | $2,900.00 | $2,850.00 | $3,520.00 | $2,910.00 | $2,900.00 |
| 39 | Mailbox install-M (TWG-post) type 1 (560-7001) | EACH | 4 | $480.00 | $525.00 | $690.00 | $1,100.00 | $600.00 | $600.00 |
| 40 | Mailbox install-S (TWG-post) type 2 (560-7002) | EACH | 33 | $275.00 | $375.00 | $275.00 | $1,100.00 | $300.00 | $300.00 |
| 41 | Mailbox install-D (TWG-post) type 2 (560-7003) | EACH | 2 | $375.00 | $400.00 | $290.00 | $1,100.00 | $340.00 | $340.00 |
| 42 | Install small roadside sign support and assembly type 10BWG(1)SA(P) (644-7001) | EACH | 76 | $750.00 | $740.00 | $665.00 | $1,100.00 | $660.00 | $660.00 |
| 43 | Install small roadside sign support and assembly type 10BWG(1)SA(T) (644-7004) | EACH | 4 | $1,125.00 | $860.00 | $727.00 | $1,100.00 | $700.00 | $700.00 |
| 44 | Install small roadside sign support and assembly type 10BWG(1)SA(U) (644-7007) | EACH | 6 | $932.50 | $1,100.00 | $1,078.00 | $1,100.00 | $850.00 | $850.00 |
| 45 | Remove SM RD SN sup&AM (644-7073) | EACH | 86 | $178.50 | $145.00 | $115.00 | $500.00 | $100.00 | $100.00 |
| 46 | Install delineator assembly (D-SW)SZ 1(BRF)GF2(BI) (658-7019) | EACH | 20 | $7.00 | $30.00 | $25.00 | $100.00 | $38.00 | $31.00 |
| 47 | Remove delin & object marker assms (658-7078) | EACH | 14 | $65.00 | $30.00 | $63.00 | $50.00 | $15.00 | $15.00 |
| 48 | Work zone pavement marking non-removing (W)6"(solid) (662-7008) | LF | 53,312 | $0.25 | $0.25 | $0.30 | $0.65 | $0.30 | $0.30 |
| 49 | Work zone pavement marking non-removing (Y)6"(broken) (662-7036) | LF | 2,680 | $0.28 | $0.25 | $0.30 | $0.65 | $0.30 | $0.30 |
| 50 | Work zone pavement marking non-removing (Y)6"(solid) (662-7038) | LF | 40,660 | $0.25 | $0.25 | $0.30 | $0.65 | $0.30 | $0.30 |
| 51 | Work zone pavement marking SHT terminal (tab)type W (662-7112) | EACH | 2,530 | $2.25 | $1.00 | $2.00 | $6.00 | $1.00 | $2.25 |
| 52 | Work zone pavement marking SHT terminal (tab)type Y (662-7113) | EACH | 2,136 | $2.25 | $1.00 | $2.00 | $6.00 | $1.00 | $2.25 |
| 53 | Reflectorized pavement marking type I (W)24"(solid)(100MIL) (666-7036) | LF | 262 | $19.50 | $13.50 | $7.50 | $20.00 | $7.50 | $7.50 |
| 54 | Reflectorized pavement marking type I (W)(arrow)(100MIL) (666-7042) | EACH | 14 | $120.00 | $205.00 | $145.00 | $250.00 | $145.00 | $145.00 |
| 55 | Reflectorized pavement marking type I (W)(word)(100MIL) (666-7066) | EACH | 6 | $166.00 | $245.00 | $165.00 | $250.00 | $165.00 | $165.00 |
| 56 | Ref pavement marking type I(W)18"(yld tri)(090MIL) (666-7086) | EACH | 7 | $35.00 | $60.00 | $75.00 | $150.00 | $75.00 | $75.00 |
| 57 | Reflectorized profile pavement marking type I(W)6"(solid)(100MIL) (666-7266) | LF | 53,312 | $0.75 | $0.75 | $1.00 | $0.65 | $1.00 | $1.00 |
| 58 | Reflectorized profile pavement marking type I(Y)6"(solid)(100MIL) (666-7270) | LF | 40,660 | $1.25 | $0.75 | $1.00 | $0.65 | $1.00 | $1.00 |
| 59 | Reflectorized profile pavement marking type I(Y)6"(broken)(100MIL) (666-7274) | LF | 2,680 | $1.35 | $0.75 | $1.50 | $0.65 | $1.50 | $1.50 |
| 60 | Reflectorized pavement marker type II-A-A (672-7004) | EACH | 1,111 | $3.25 | $5.25 | $4.30 | $6.00 | $4.30 | $43.00 |
| 61 | Underseal course (3006-7001) | GAL | 7,827.60 | $1.75 | $6.18 | $6.18 | $6.00 | $6.00 | $11.88 |
| 62 | Reinformt grid for asphalt pavement overla (3011-7001) | SY | 130,460 | $9.00 | $7.34 | $7.34 | $4.00 | $6.75 | $9.74 |
The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.
Source
Read from TxDOT's tabulation for this contract. TxDOT Bid Tabulations open-data export (data.texas.gov) from September 2024, read 21 November 2026, and TxDOT's legacy Tabulation of Bids pages for January 2020 to August 2024. The legacy pages are a large sample, not every contract: their file names were reused from year to year. Their district is the one TxDOT gives the county. Bids that did not match their published total are left out.
Every contract let that day: TxDOT letting of March 5, 2025. Compiled by Mirage Metrics.
Your own bid history, read the same way
Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.