TxDOT contract A00197754 bid tabulation
Seal Coat, SH 31 (End of Grassy Median E. of Malakoff to Navarro CL). Let by Texas DOT on December 2, 2025, Henderson, Tyler District. 4 bids received; low bid $19,658,258 by Ronald R. Wagner & Co., LP, +0.4% against the engineer's estimate of $19,578,203.
- Owner
- Texas DOT
- Letting
- 02 DEC 2025
- Pay items
- 77
- Data through
- 19 NOV 2026
Bidders
| Rank | Bidder | Total bid | Against the low bid | Against the estimate |
|---|---|---|---|---|
| 1 | Ronald R. Wagner & Co., LP | $19,658,258 | Low | 0.0% |
| 2 | D. I. J. Construction, Inc. | $20,885,751 | +6.0% | +7.0% |
| 3 | CDM Holdings | $21,889,996 | +11% | +12% |
| 4 | CK Newberry, LLC | $22,353,987 | +14% | +14% |
Engineer's estimate: $19,578,203.
Bid tabulation
| Line | Pay item | Unit | Quantity | Estimate | 1. Ronald R. Wagner & Co., LP | 2. D. I. J. Construction, Inc. | 3. CDM Holdings | 4. CK Newberry, LLC |
|---|---|---|---|---|---|---|---|---|
| 1 | Asphalt (AC-20-5TR or AC-20XP) (316-7084) | TON | 8,476.25 | $570.00 | $542.07 | $600.00 | $579.50 | $690.00 |
| 2 | Aggregate (type-PD, GR-3)(sac-A) (316-7146) | CY | 17,241 | $155.00 | $165.06 | $211.00 | $185.00 | $225.00 |
| 3 | Aggregate (type-PD, GR-4)(sac-A) (316-7148) | CY | 8,756 | $161.65 | $206.00 | $185.00 | $225.00 | |
| 4 | Aggregate (type-PD or PL, GR-3) (316-7257) | CY | 13,434 | $127.77 | $180.00 | $150.00 | $200.00 | |
| 5 | Mobilization (500-7001) | LS | 1 | $2,420,856 | $3,407,689 | $2,000,000 | $3,500,000 | $1,200,000 |
| 6 | Barricades, signs and traffic handling (502-7001) | MO | 6 | $40,000 | $40,000 | $35,000 | $100,000 | $150,000 |
| 7 | Portable changeable message sign (503-7001) | DAY | 73 | $100.00 | $0.01 | $300.00 | $1,000.00 | $1.00 |
| 8 | TMA (stationary) (505-7001) | DAY | 99 | $0.01 | $0.01 | $100.00 | $500.00 | $1.00 |
| 9 | TMA (mobile operation) (505-7003) | DAY | 125 | $0.01 | $0.01 | $1,940.00 | $500.00 | $1.00 |
| 10 | Mill rumble strips (asphalt) (shoulder) (533-7001) | LF | 87,789 | $0.10 | $0.30 | $0.32 | $0.30 | $0.32 |
| 11 | Mill rumble strips (asphalt) (centerline) (533-7002) | LF | 142,153 | $0.30 | $0.38 | $0.30 | $0.38 | |
| 12 | Work zone pavement marking SHT terminal (tab)type W (662-7112) | EACH | 40,951 | $0.01 | $0.01 | $0.01 | $1.00 | $0.55 |
| 13 | Work zone pavement marking SHT terminal (tab)type Y-2 (662-7114) | EACH | 127,202 | $0.01 | $0.01 | $0.01 | $1.00 | $0.58 |
| 14 | Reflectorized pavement marking type I (W)6"(DOT)(100MIL) (666-7009) | LF | 1,279 | $0.20 | $3.00 | $0.65 | $1.50 | |
| 15 | Reflectorized pavement marking type I (W)8"(DOT)(100MIL) (666-7018) | LF | 408 | $0.20 | $3.00 | $1.75 | $2.50 | |
| 16 | Reflectorized pavement marking type I (W)8"(solid)(100MIL) (666-7024) | LF | 36,139 | $0.80 | $0.85 | $0.85 | $0.85 | |
| 17 | Reflectorized pavement marking type I (W)18"(solid)(100MIL) (666-7033) | LF | 853 | $5.00 | $6.25 | $6.25 | $5.00 | |
| 18 | Reflectorized pavement marking type I (W)24"(solid)(100MIL) (666-7036) | LF | 8,609 | $4.00 | $8.00 | $8.00 | $6.00 | |
| 19 | Reflectorized pavement marking type II (W) 6" (broken) (666-7172) | LF | 51,599 | $0.17 | $0.14 | $0.17 | $0.17 | $0.18 |
| 20 | Reflectorized pavement marking type II (W) 6" (DOT) (666-7173) | LF | 152 | $0.14 | $3.00 | $0.50 | $1.00 | |
| 21 | Reflectorized pavement marking type II (W) 6" (solid) (666-7175) | LF | 2,092,543 | $0.17 | $0.13 | $0.15 | $0.15 | $0.16 |
| 22 | Reflectorized pavement marking type II (W) 8" (DOT) (666-7177) | LF | 858 | $0.30 | $0.30 | $3.00 | $0.35 | $1.00 |
| 23 | Reflectorized pavement marking type II (W) 8" (solid) (666-7179) | LF | 29,959 | $0.25 | $0.30 | $0.35 | $0.35 | $0.30 |
| 24 | Reflectorized pavement marking type II (W) 18" (solid) (666-7183) | LF | 859 | $5.00 | $6.00 | $6.00 | $2.50 | |
| 25 | Reflectorized pavement marking type II (W) 24" (solid) (666-7184) | LF | 14,393 | $2.00 | $4.00 | $6.00 | $6.00 | $3.00 |
| 26 | Reflectorized pavement marking type II (W) (arrow) (666-7186) | EACH | 312 | $120.00 | $100.00 | $135.00 | $135.00 | $75.00 |
| 27 | Reflectorized pavement marking type II (W) (double arrow) (666-7187) | EACH | 17 | $120.00 | $175.00 | $175.00 | $120.00 | |
| 28 | Reflectorized pavement marking type II (W) (LN reduct arrow) (666-7192) | EACH | 4 | $200.00 | $250.00 | $250.00 | $200.00 | |
| 29 | Reflectorized pavement marking type II (W) (word) (666-7194) | EACH | 136 | $130.00 | $100.00 | $135.00 | $135.00 | $110.00 |
| 30 | Reflectorized pavement marking type II (W) (RR crossing) (666-7198) | EACH | 13 | $400.00 | $300.00 | $300.00 | $350.00 | |
| 31 | Reflectorized pavement marking type II (W) 18" (yld tri) (666-7200) | EACH | 19 | $15.00 | $30.00 | $30.00 | $20.00 | |
| 32 | Reflectorized pavement marking type II (W) 36" (yld tri) (666-7201) | EACH | 159 | $20.00 | $30.00 | $30.00 | $25.00 | |
| 33 | Reflectorized pavement marking type II (Y) 6" (broken) (666-7211) | LF | 147,600 | $0.17 | $0.14 | $0.17 | $0.17 | $0.18 |
| 34 | Reflectorized pavement marking type II (Y) 6" (solid) (666-7213) | LF | 1,911,651 | $0.17 | $0.13 | $0.16 | $0.16 | $0.16 |
| 35 | Reflectorized pavement marking type II (W)(acc PRK)(symbol only) (666-7222) | EACH | 1 | $500.00 | $150.00 | $150.00 | $350.00 | |
| 36 | Reflectorized profile pavement marking type I(W)6"(solid)(100MIL) (666-7266) | LF | 1,773,500 | $0.64 | $0.64 | $0.64 | $0.57 | |
| 37 | Reflectorized profile pavement marking type I(Y)6"(solid)(100MIL) (666-7270) | LF | 47,957 | $0.64 | $1.05 | $1.05 | $0.57 | |
| 38 | Reflectorized profile pavement marking type I(Y)6"(broken)(100MIL) (666-7274) | LF | 922,622 | $0.64 | $0.15 | $0.15 | $0.57 | |
| 39 | Pavement sler 6" (666-7347) | LF | 102,699 | $1.00 | $0.30 | $0.20 | $0.20 | $0.15 |
| 40 | Pavement sler 8" (666-7348) | LF | 6,610 | $1.00 | $0.30 | $0.30 | $0.30 | |
| 41 | Pavement sler 24" (666-7352) | LF | 1,148 | $2.00 | $2.00 | $2.00 | $2.50 | |
| 42 | Pavement sler (arrow) (666-7353) | EACH | 25 | $50.00 | $50.00 | $50.00 | $75.00 | |
| 43 | Pavement sler (word) (666-7354) | EACH | 16 | $50.00 | $50.00 | $50.00 | $100.00 | |
| 44 | Pavement sler (double arrow) (666-7356) | EACH | 1 | $200.00 | $50.00 | $50.00 | $200.00 | |
| 45 | Pavement sler (yld tri) (666-7365) | EACH | 56 | $25.00 | $15.00 | $15.00 | $20.00 | |
| 46 | Reflectorized pavement marking type I (W)6"(broken)(100MIL) (666-7408) | LF | 125,052 | $0.44 | $0.55 | $0.62 | $0.55 | |
| 47 | Reflectorized pavement marking type I (W)6"(solid)(100MIL) (666-7411) | LF | 864,913 | $0.44 | $0.54 | $0.60 | $0.50 | |
| 48 | Reflectorized pavement marking type I (Y)6"(broken)(100MIL) (666-7420) | LF | 152,468 | $0.44 | $0.55 | $0.62 | $0.55 | |
| 49 | Reflectorized pavement marking type I (Y)6"(solid)(100MIL) (666-7423) | LF | 2,243,545 | $0.44 | $0.54 | $0.60 | $0.55 | |
| 50 | Prefabricated PM type C (W)(arrow) (668-7091) | EACH | 409 | $200.00 | $210.00 | $210.00 | $210.00 | |
| 51 | Prefabricated PM type C (W)(double arrow) (668-7093) | EACH | 3 | $220.00 | $345.00 | $345.00 | $275.00 | |
| 52 | Prefabricated PM type C (W)(LN reduct arrow) (668-7100) | EACH | 9 | $350.00 | $450.00 | $450.00 | $300.00 | |
| 53 | Prefabricated PM type C (W)(word) (668-7103) | EACH | 225 | $220.00 | $240.00 | $240.00 | $238.00 | |
| 54 | Prefabricated PM type C (W)(RR crossing) (668-7108) | EACH | 13 | $400.00 | $550.00 | $550.00 | $555.00 | |
| 55 | Prefabricated PM type C (W)(18")(yld tri) (668-7110) | EACH | 6 | $9.00 | $30.00 | $30.00 | $35.00 | |
| 56 | Prefabricated PM type C (W)(36")(yld tri) (668-7111) | EACH | 465 | $30.00 | $45.00 | $45.00 | $40.00 | |
| 57 | Prefabricated PM type C (W)(bike arrow) (668-7113) | EACH | 2 | $200.00 | $250.00 | $250.00 | $100.00 | |
| 58 | Prefabricated PM type C (W)(bike symbol) (668-7115) | EACH | 2 | $200.00 | $300.00 | $300.00 | $200.00 | |
| 59 | Reflectorized pavement marker type I-C (672-7002) | EACH | 9,567 | $4.50 | $4.00 | $4.00 | $4.00 | $4.00 |
| 60 | Reflectorized pavement marker type II-A-A (672-7004) | EACH | 80,205 | $4.50 | $4.00 | $3.50 | $4.00 | $3.50 |
| 61 | Eliminating existing PM & markers (6") (677-7002) | LF | 97,139 | $0.70 | $0.50 | $0.40 | $0.60 | $0.55 |
| 62 | Eliminating existing PM & markers (8") (677-7004) | LF | 14,193 | $0.80 | $0.65 | $0.65 | $0.70 | |
| 63 | Eliminating existing PM & markers (12") (677-7006) | LF | 268 | $1.00 | $2.00 | $2.00 | $2.00 | |
| 64 | Eliminating existing PM & markers (24") (677-7008) | LF | 1,148 | $2.00 | $4.00 | $4.00 | $2.00 | |
| 65 | Eliminating existing PM & markers (arrow) (677-7009) | EACH | 25 | $80.00 | $70.00 | $70.00 | $50.00 | |
| 66 | Eliminating existing PM & markers (double arrow) (677-7010) | EACH | 1 | $80.00 | $100.00 | $100.00 | $100.00 | |
| 67 | Eliminating existing PM & markers (word) (677-7015) | EACH | 16 | $100.00 | $70.00 | $70.00 | $75.00 | |
| 68 | Eliminating existing PM & markers (36")(yld tri) (677-7024) | EACH | 56 | $10.00 | $20.00 | $20.00 | $15.00 | |
| 69 | Eliminating existing PM & markers (rumble strip) (677-7030) | LF | 895,182 | $0.20 | $0.14 | $0.14 | $0.18 | |
| 70 | Pavement surface preparation for marking (6") (678-7002) | LF | 102,159 | $0.01 | $0.02 | $0.01 | $0.01 | $0.02 |
| 71 | Pavement surface preparation for marking (8") (678-7004) | LF | 6,332 | $0.02 | $0.01 | $0.01 | $0.05 | |
| 72 | Pavement surface preparation for marking (24") (678-7008) | LF | 1,128 | $1.00 | $0.25 | $0.25 | $0.50 | |
| 73 | Pavement surface preparation for marking (arrow) (678-7009) | EACH | 25 | $20.00 | $20.00 | $20.00 | $15.00 | |
| 74 | Pavement surface preparation for marking (double arrow) (678-7010) | EACH | 1 | $20.00 | $20.00 | $20.00 | $25.00 | |
| 75 | Pavement surface preparation for marking (word) (678-7016) | EACH | 16 | $20.00 | $20.00 | $20.00 | $15.00 | |
| 76 | Pavement surface preparation for marking (36")(yld tri) (678-7023) | EACH | 56 | $20.00 | $5.00 | $2.00 | $15.00 | |
| 77 | Frictional asphalt surface preserv TRTMT (3001-7001) | SY | 319,416 | $1.48 | $1.78 | $1.78 | $1.78 | $2.15 |
The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.
Source
Read from TxDOT's tabulation for this contract. TxDOT Bid Tabulations open-data export (data.texas.gov) from September 2024, read 21 November 2026, and TxDOT's legacy Tabulation of Bids pages for January 2020 to August 2024. The legacy pages are a large sample, not every contract: their file names were reused from year to year. Their district is the one TxDOT gives the county. Bids that did not match their published total are left out.
Every contract let that day: TxDOT letting of December 2, 2025. Compiled by Mirage Metrics.
Your own bid history, read the same way
Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.